Purpose

The purpose of this document is to define the conversion approach to create Measurement Document in S/4 HANA.

Measurement documents are used to record measurement readings on the condition of an equipment e.g. temperature. It is also used to record counter readings of an equipment e.g. Engine Running hours. This counter readings will be the trigger for maintenance plan to initiate maintenance and/or inspection work.


Conversion Scope

The scope of this document covers the approach for converting active Measurement Document from Legacy Source Systems into S/4HANA.

At Syensqo, Measurement Documents are created for Measuring Points to monitor the condition and usage of assets. They provide critical input to support condition-based and usage-based maintenance strategies. Measuring Points are created on either Functional Locations or Equipment, depending on the asset structure and monitoring requirement. The Measurement Documents are also a core component of Asset Performance Management (APM) used to monitor asset health, detect trends, and trigger condition-based or predictive maintenance actions.

The approach is to migrate the last Measurement Document for each active Measuring Point which is driving the active Maintenance Plans and Items in order to start the Maintenance Plan in S/4 HANA with the objective to continue with the cycle. For Measurement Documents related to APM, up to three years of historical data will be migrated from legacy systems to ensure seamless continuity in asset monitoring, trend analysis, and maintenance decision-making within the S/4 HANA.

Note: Digital Local Indicators (eg Sensor Data available in Startek) are not in scope for migration as these will be mass created via Custom Development Program (ERP-582)

The data from legacy system includes:

  1. Latest Measurement Document Reading for active Measuring Point that is a counter (IMPTT-INDCT) and linked to a active Maintenance Plan (MMPT-POINT)
  2. Measurement Document for associated active Measuring Points (IMPTT-MPOBJ) for Functional Locations and Equipment for the past 3 years (IMRG-IDATE), limited to:
    1. specific Technical Object Type (EQUI-EQART/IFLOT-EQART) based on Value Mapping: OTH_Technical Object Type_APM 

The data from legacy system excludes:

  1. Measuring Document with reversal indicator (IMRG-CANCL)
  2. Long Text for Measurement Document

List of Tables to extract for this object is maintained here: Extract Table Register.

Illustration of relevant Measurement Document for extraction (Point 1 of relevancy criteria):

Measuring PointMeasurement DocumentDateTimeCounter ReadingReversal Indicator
A100123 Feb 202610 am2010
A10021 Mar 20262 am2040
A10031 Mar 20264 am2050
A100425 Feb 20265 pm2020
A10052 Mar 20263 pm2060X
A100626 Feb 20264 pm2021X

 Based on the above sample data, the following scenario and conclusion apply:

ScenarioConclusionRationale
1

Measurement Document 003 is to be extracted

Latest Counter Reading without reversal indicator

 

 List of source systems and approximate number of records

SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2

Measurement Documents will be collected via DCT. An initial extract of the relevant Measurement Documents will be provided in google sheet format to assist business in decision making on including any relevant Measurement Documents from PF2 and WP2 as Measurement Documents in S/4 HANA.

Any additional Measurement Documents that need to be created to support the new design may be added in the DCT.

Please see an indication of what will be baselined from source systems below and what will be constructed in the DCT. 

5,000

S/4HANA

5,000
DCTMeasurement Documents for plants which do not have data existing from PF2 and PF2TBDS/4HANATBD

Additional Information

Multi-language Requirement

Measurement document does not have multi language support. Measurement document text will be migrated using EN logon.

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable


Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
IMRGMDOCMIMRC_MDOCMMeasurement DocumentCHAR30Internal Number
IMRGPOINTIMRC_POINTMeasuring PointCHAR12Mandatory
IMRGIDATEIMRC_IDATEDate of the MeasurementDATS8Mandatory
IMRGITIMEIMRC_ITIMETime of MeasurementTIMS6Mandatory
IMRGMDTXTIMRC_MDTXTMeasurement Document TextCHAR40Conditional
IMRGMLANGSPRASLanguage KeyLANG1Conditional
IMRGCNTRRIMRC_CNTRR Counter Reading in SI UnitFLTP16Conditional
IMRGREADGIMRC_READGMeasurement Reading/Total Counter Reading in SI UnitFLTP16Conditional
IMRG

VLCOD

IMRC_VLCOD

Valuation Code

CHAR4Conditional


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System
9002-001

C3

Info Report: Missing Measurement Document for Measuring Points assigned to Maintenance Plan


If the Measuring Point is assigned to a relevant Maintenance Plan, it must have relevant Measurement Documents.


This is the pre-requisite for Maintenance Plan Start.

Maintenance Plan, Maintenance Plan Text, Measuring Point, Measuring Point Description, Plant 

Note: Plant is derived from either the FL/EQ Maintenance Plant

PF2, WP2, DCT

Note: List of Cleansing is maintained here: Conversion Specs Register (DCT & Cleansing Report)


Conversion Process

The high-level process is represented by the diagrams below.


The following represents the high-level process for Source System Extraction:

Collection will be done manually in the Data Collection Template for the following scenarios:

  • For sites not on SAP-PF2 or WP2 systems 
  • For Measurement Documents that need to be created to support the to-be design

Data Privacy and Sensitivity

Not Applicable.


Extraction

Extract data from a source into Syniti Migrate. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) inSyniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads.

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract data from source system based on relevancy ruleData Team

Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
Not Applicable



Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Measurement Document data with exception of some fields which require transformation as mentioned in the transformation rule.

Delta Data Management: Initial collection will be done via the report and one-time load to the DCT will be performed. Any delta after the initial collection within the DCT will require business to take due diligence to ensure any subsequent delta cleansing is verified and aligned within the DCT.


Note: All rules specified below should be documented as a tooltip in the DC Page.

Format:

  • Line 1: Mandatory / Conditional
  • Line 2: Remaining text


Measurement Document Data Construction Rules

Field NameField DescriptionRule
ZPLANTPlant

Mandatory

Populate the Maintenance Plant of the FL/EQ linked to the Measuring Point.

ZLEGACYMDOCMLegacy Measurement Document

Mandatory

Must be unique

POINTMeasuring Point

Mandatory

Must be an existing legacy Measuring Point (Either in DCT or in ECC)

IDATEDate of the Measurement

Mandatory

Valid Date within the past 1 year

Date Format DDMMYYYY

ITIMETime of Measurement

Mandatory

Valid Time

Time Format HH:MM:SS

MDTXTMeasurement Document Text

Conditional

Populate if information exists

RECDVMeasurement Reading in Unit of Entry

Conditional

Cannot be 0

If Measuring Point is a Counter: Mandatory and cannot be greater than Counter Over Reading of Measuring Point

If Measuring Point is NOT a Counter: Must be between Upper and Lower Measurement Range Limit of Measuring Point. Only can be blank if "Indicator: Valuation Code Sufficient for Measurmnt. Document" of Measuring Point is checked

ZREADGTotal Counter Reading in Unit of Entry

Conditional

For Measuring Point is NOT a Counter: Leave blank

For Measuring Point is a Counter:

  1. Only populate if value is different from Measurement Reading
  2. Total Counter Reading cannot be 0
  3. Total Counter Reading must be based on the Unit of Measure in the Measuring Point
VLCODValuation Code

Conditional

Only populate when Measuring Point has Code Group maintained. Must be blank otherwise.

Note: List of DCTs is maintained here: Conversion Specs Register (DCT & Cleansing Report)

Extraction Dependencies

Item #Step DescriptionTeam Responsible
1

Relevancy Criteria for Measuring Point

SyWay A2D Data Team

2

Relevancy Criteria for Maintenance Plan

SyWay A2D Data Team


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti Migrate
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business.

SyWay Data Team

2

In dspMigrate, select the wave – S4/HANA – Plant Maintenance

Syniti

3

Go to Process Area Launch and Process the Object – Measurement Document

Syniti

4

Review and Validate Error and Preload Reports

Syniti

5

Execute the transformation to prepare the target tables

Syniti

6

Validate data from pre-load and error reports

Business/Data owner

7

Generate load files

Syniti


Transformation Rules

1. Measurement Document - DCT

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCT-ZPLANT

Plant

S/4 HANA

--

Plant

Direct Mapping

This is used to identify the Business Owner

2DCTIMRGZLEGACYMDOCM

Measurement Document

S/4 HANA

IMRGMDOCM

Measurement Document

Internal Number

3DCT

IMRG

POINT

Measuring Point

S/4 HANA

IMRG

POINT

Measuring Point

Value Mapping: Measuring Point

4DCT

IMRG

IDATE

Date of the Measurement

S/4 HANA

IMRG

IDATE

Date of the Measurement

Direct Mapping

5DCT

IMRG

ITIME

Time of Measurement

S/4 HANA

IMRG

ITIME

Time of Measurement

Direct Mapping

6DCT

IMRG

MDTXT

Measurement Document Text

S/4 HANA

IMRG

MDTXT

Measurement Document Text

Direct Mapping

7---

-

S/4 HANA

IMRGMLANG

Language Key

Derive from T001W-SPRAS based on the ZPLANT 

8DCTIMRG

REDCV

Measurement Reading in Unit of Entry

S/4 HANAIMRG

CNTRR

Measurement Reading in Unit of Entry

Perform the transformation below:

Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion.

9DCTIMRG

ZREADG

Total Counter Reading in Unit of Entry

S/4 HANAIMRG

READG

Measurement Reading/Total Counter Reading in SI Unit

If blank, default to the value of REDCV.

If value is provided, perform the transformation below:

Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion.


If Counter Reading and Total Counter Reading are not the same (REDCV<>ZREADG): This is Counter Replacement Scenario. This loading step can be achieved by setting the total counter reading externally upon counter replacement.


2. Measurement Document - ECC

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1---


S/4 HANA

--

Plant

Direct Mapping

This is used to identify the Business Owner

2PF2/WP2IMRGMDOCM

Measurement Document

S/4 HANA

IMRGMDOCM

Measurement Document

Internal Number

3PF2/WP2

IMRG

POINT

Measuring Point

S/4 HANA

IMRG

POINT

Measuring Point

Value Mapping: Measuring Point

4PF2/WP2

IMRG

IDATE

Date of the Measurement

S/4 HANA

IMRG

IDATE

Date of the Measurement

Direct Mapping

5PF2/WP2

IMRG

ITIME

Time of Measurement

S/4 HANA

IMRG

ITIME

Time of Measurement

Direct Mapping

6PF2/WP2

IMRG

MDTXT

Measurement Document Text

S/4 HANA

IMRG

MDTXT

Measurement Document Text

Direct Mapping

7---

-

S/4 HANA

IMRGMLANG

Language Key

Default to the language key based on the plant (T001W-SPRAS)

8PF2/WP2IMRG

CNTRR

Counter Reading in SI Unit

S/4 HANAIMRG

CNTRR

Counter Reading in SI Unit

Direct Mapping
9PF2/WP2IMRG

READG

Measurement Reading/Total Counter Reading in SI Unit

S/4 HANAIMRG

READG

Measurement Reading/Total Counter Reading in SI Unit

If blank, default to the value of REDCV.

If Counter Reading and Total Counter Reading are not the same (CNTRR<>READG): This is Counter Replacement Scenario. This loading step can be achieved by setting the total counter reading externally upon counter replacement.

  

List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.

Transformation Mapping

Mapping Table NameMapping Table Description

OTH_Technical Object Type_APM


List of Functional Location and Equipment TOTs required for migrating historical Measurement Documents and Notifications

Measuring Point

Mapping of legacy Measuring Point to new Measuring Point

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1

Ensure DCT tables completeness

SyWay Data Team

2

Ensure all Transformation mappings are up to date.

SyWay Data Team


Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count 

Data team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

Data team to verify that all fields below meet pass the checks:

1. Mandatory Fields

2. Field and Value Mapping Correctness

3. Null Checks

4. Text Length Checks

Review error reports

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.


Business

Completeness

TaskAction

Verify Record Count 

Business team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets. 


Accuracy

TaskAction

Conversion Accuracy

Business  to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off data) 


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Ensure Pre-load sign-offs are obtained.

SyWay Data team

2

Go to the load tool and select the correct load Program.

SyWay Data team

3

Proceed with Data load.

SyWay Data team

4

Validate few records loaded by accessing standard transactions

SyWay Data team

5

Generate the post load reports in the tool.

SyWay Data team

6

Log errors as defects, if any and address resolutions. Close defects.

SyWay Data team

7

Resolve defects by reupload and re-generate post load reports if necessary.

SyWay Data team

8

Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.

Business

9

Repeat steps 5 to 7 if necessary.

SyWay Data team


Load Phase and Dependencies

Precutover: 9002 - Measurement Document (Historical Data)

Cutover: 9002a - Measurement Document

Configuration

Item #Configuration Item
1T002-Language Keys

Conversion Objects

Object #Preceding Object Conversion Approach
1012Measuring Point

Error Handling

Error TypeError DescriptionAction Taken

Configuration

Invalid Language Key

Engage Functional team to expedite and fix the error in the system

Invalid Data

Invalid Measuring Point

Expedite whether the master data is available in the system


Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

Data team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue, or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

Data team to verify that the Measurement Document data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. 


Business

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.


Accuracy

TaskAction

Conversion Accuracy

Verify that the Measurement Document data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Key Assumptions

  • Measurement Document is in scope based on data design and any exception requested by business.
  • Data cleansing has met the required percentage threshold for the specified mock cycle and all preparation activities have been completed.
  • When the Total Counter Reading is the same as the Counter Reading, the loading method for Normal Counter Reading Entry is adopted (Total Counter Reading can be left blank)
  • When the Total Counter Reading is not the same as the Counter Ready, the loading method for Total Counter Reading Set Externally is adopted (both Counter Reading and Total Counter Reading is required)
  • For Counter Based Plan, the last reading of the Measuring Document will be the input to the Start Counter of the Maintenance Plan Start object


See also

Change log

Version Published Changed By Comment
CURRENT (v. 91) Apr 23, 2026 07:06 PUN-ext, Eddy
v. 144 Apr 07, 2026 16:51 PUN-ext, Eddy
v. 143 Apr 06, 2026 10:45 PUN-ext, Eddy
v. 142 Mar 17, 2026 10:15 PUN-ext, Eddy CR0282-Update in Relevancy Criteria: 1. The logic used to identify APM-related Measurement Documents needs to be revised so that the relevancy assessment does not depend on S/4 data.
v. 141 Mar 17, 2026 10:12 PUN-ext, Eddy
v. 140 Mar 12, 2026 09:41 PUN-ext, Eddy
v. 139 Mar 12, 2026 09:40 PUN-ext, Eddy
v. 138 Mar 12, 2026 09:39 PUN-ext, Eddy
v. 137 Mar 12, 2026 09:34 PUN-ext, Eddy CR0282
v. 136 Dec 18, 2025 11:44 PUN-ext, Eddy

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels