| Status | Approved |
|---|---|
| Owner | VAN AARDE-ext, Tonya |
| Stakeholders | Amine Ait Quakli |
| Jira Request ID | |
| Jira Development ID | ERP-621 - Getting issue details... STATUS |
High- Level Specification
| Parameter | Value |
|---|---|
| Application System | Application System (Source)S/4Hana ROW, S/4Hana China, S/4Hana CUI |
| Business Process Reference | 02.04.02.01. Manage Standard Sales Orde |
Functional Overview
Business Requirement
For sales order items that are specification-based, the specification must remain fixed once production has started.
This ensures:
Full alignment between Sales and Production
Prevention of mismatches between planned vs. produced specifications
Protection of product quality and compliance once manufacturing begins
In addition to locking specification fields, the business also requires control over other critical fields that impact production, and planning once a Process Order is in Released (REL) status.
Prevent changes to the Specification fields after Process Order Release.
If the sales order item is spec-based and the linked Process Order is in Released (REL) status, no change to the specification fields at item level is allowed. This ensures alignment between Sales and Production, prevents mismatches between planned vs. produced specifications, and protects product quality and compliance once manufacturing has started.Prevent changes to the Single Parent Batch indicator (ZZ_SINGLEPB) after Process Order Release.
If the item is flagged for Single Parent Batch and the linked Process Order is Released, no change to this indicator is allowed. This ensures batch traceability, manufacturing consistency, and prevents downstream variance.Issue a warning when the Confirmed Delivery Date is changed after Process Order Release.
Changes to the confirmed date after production has begun may impact planning, ATP, loading schedules, and customer commitments; therefore, the user must be alerted.Issue a warning when the Confirmed Quantity is changed after Process Order Release.
Changing the confirmed quantity after the order is in production may impact material staging, availability checks, and production planning. A warning is required to make the CSR aware of potential downstream impacts.
Scope and Objectives
Scope and Objectives
This WRICEF covers a system validation enhancement in Fiori App: Manage Sales Orders – Version 2 (F3893) and in SAP GUI transaction VA02, executed during sales order change mode.
The objective is to:
Detect when a sales order line item is linked to a Process Order
Confirm whether the Process Order has system status REL
Prevent any modification to Specification fields once REL status is reached
Prevent any modification to the Single Parent Batch indicator (ZZ_SINGLEPB) once REL status is reached
Issue a warning when the Confirmed Delivery Date is changed after REL
Issue a warning when the Confirmed Quantity is changed after REL
Display an error message and block the save action for fields that are restricted after REL
Apply this rule only to:
Sales orders that have Specification IDs maintained at line item level
Ensure no impact to:
Other Sales Orders
- Non–spec-based items
The Process Order link is determined via the Z-table maintained by the PCCD tool (“new IPA”). Jira-1022
WHY STANDARD IS NOT SUFFICIENT
SAP standard does not provide functionality to restrict updates to sales order specification fields based on the status of a linked Process Order.
Key limitations include:
SAP does not cater for specification fields at sales order item level; these fields are custom (Z-fields). Therefore, standard SAP cannot control, validate, or freeze them based on production status.
This is not a standard Make-to-Order (MTO) scenario; instead, the sales order and Process Order are connected via a “soft” link in Production.
No standard integration exists between specification data and the Process Order system status (REL).
Standard logic cannot prevent late specification changes that would desynchronize Sales and Production.
High operational risk remains that outdated or incorrect specifications could be used once production has already started.
The scope of this enhancement is depicted in process step Other Sales Order Changes below. For the full Signavio, please go to 02.04.02.09. Manage Sales Order Execution Exceptions
Step | Description | Comment |
|---|---|---|
| 1. | Sales order created. | Sales order created with one or many Specifications per line item. |
| 2. | Process Order created. | |
| 3. | Sales Order linked to Process order in PCCD tool | The linking between the Sales Order and the Process Order within PCCD. https://syensqo.atlassian.net/browse/ERP-1022 - Production Confirmation Consumption Dashboard (New IPA). |
| 4. | Process Order Released | A few days before production starts - manual process. Shop floor activities started. |
| 5. | Sales Order Changed | Specifications changed on the sales order line item level. |
Assumptions
1. Process Order Linkage Is Available and Accurate
The linkage between Sales Order Item → Process Order is derived from the Z-table maintained by the PCCD (“new IPA”) tool. https://syensqo.atlassian.net/browse/ERP-1022
It is assumed that this table is correctly and consistently updated prior to any sales order change.
2. Process Order Must Be in “REL” Status to Trigger the Restriction
The enhancement assumes that system status REL (Released) is the correct and only status during which specification fields must be frozen.
Any earlier process order statuses (e.g., CRTD, PREL) will not trigger restrictions.
3. Only Certain Fields Are Blocked
The enhancement restricts changes only to the following fields when the linked Process Order is in Released (REL) status:
Specification Z-fields (blocked)
Single Parent Batch indicator (ZZ_SINGLEPB) (blocked)
Confirmed Delivery Date (warning)
Confirmed Quantity (warning)
4. VA02 (SAP GUI) and the Fiori App “Manage Sales Orders – Version 2 (F3893)” are the user interfaces in scope for this enhancement, with the Fiori application serving as the primary UI.
5. Error and Warning Messages Will Enforce Controls
- For fields that are restricted after Process Order Release (REL)—namely the Specification fields and the Single Parent Batch indicator (ZZ_SINGLEPB)—the system must raise an error message.
This error must block the user from saving the sales order.
- For fields that must remain editable but require user awareness—namely the Confirmed Delivery Date and Confirmed Quantity—the system must raise a warning message.
Warnings must allow the user to continue and save the sales order.
6. Applicable Only to Open Sales Orders
The enhancement applies only to sales orders that are still open.
Orders that are fully delivered, billed, or otherwise closed are excluded from scope.
Dependencies
- The linking between the Sales Order and the Process Order within PCCD. https://syensqo.atlassian.net/browse/ERP-1022 - Production Confirmation Consumption Dashboard (New IPA) Draft
- The Creation and Maintenance of Speficications at line item level: https://syensqo.atlassian.net/browse/ERP-264
- The Creation and Maintenance of Speficications at line item level: https://syensqo.atlassian.net/browse/ERP-265
- ERP-622 Single Batch & Single Packing List Check Boxes
Security, Integrity and Controls
The enhancement will follow the SAP standard security and authorization framework.
The authorization to maintain these fields should be included in the Customer Representative Role as part of the Manage Sales Orders v2 - F3893 and VA02 (SAP GUI)
.
Configuration Requirements
Not Applicable
Language Requirements
Not Applicable
Special Requirements
Not Applicable
Design Rationale
Functional Requirements
This enhancement applies in Manage Sales Orders v2 (F3893) — the primary UI — and in VA02 (SAP GUI).
Applicability Conditions for Restricting Specification and Related Field Changes
Sales Order Item Processing Status Validation
Specification and related field restrictions apply only when the sales order item’s Overall Processing Status:VBSTT-GBSTA_BEZ ≠ Completed
“No Spec Required” Indicator Validation
- https://syensqo.atlassian.net/browse/ERP-148
- Restrictions apply only when: The “No Spec Req” indicator is not selected
- Sales Order → Process Order Linkage
The system must determine the linked Process Order via the existing Z-table maintained by the PCCD (“new IPA”) tool. https://syensqo.atlassian.net/browse/ERP-1022 - Production Confirmation Consumption Dashboard (New IPA) Draft
1. Specification ID Selection & Change Prevention
When the linked Process Order is in REL status:
No new Spec ID may be selected via the Specification Selection Screen
(Reference: ERP-148)The existing value in ZZ_SPEC_ID may not be changed.
Any attempt to assign, replace, or update the specification must be blocked with an error.
This rule applies even if the specification was previously defaulted.
2. Single Parent Batch Change Restriction
When the linked Process Order is in REL status:
The Single Parent Batch indicator (ZZ_SINGLEPB) cannot be changed.
(This includes selecting or deselecting the indicator.)Any adjustment must trigger a blocking error message.
3. Confirmed Delivery Date Change Warning
When the linked Process Order is in REL status:
A warning message must be issued when:
The Confirmed Delivery Date (VBEP-BEDAT) is changed.
This is an informational control and does not block saving.
4. Confirmed Quantity Change Warning
When the linked Process Order is in REL status:
A warning message must be issued when:
The Confirmed Quantity (VBEP-BMENG) is changed.
This is also informational and does not block saving.
5. Process Order Status Validation Logic
To determine whether restrictions or warnings apply, the system must evaluate the status of the linked Process Order using standard SAP tables.
1. Determine the Linked Process Order
Read the Process Order number from the Z-table maintained by the PCCD (“new IPA”) tool.
2. Retrieve the Process Order Object Number
Read table AUFK using the Process Order number.
Extract the Object Number from field: AUFK-OBJNR
3. Read Active Status Records (JEST)
Using AUFK-OBJNR:
Read table JEST
Filter for active statuses:
JEST-OBJNR = AUFK-OBJNR
JEST-INACT = space
Retrieve status codes from field: JEST-STAT
4. Check for Released (REL) Status
If any active JEST-STAT value corresponds to the REL (Released) status → Restrictions and warnings apply
If REL is not present → All field changes remain allowed
5. Optional Status Text Retrieval
If status text is needed for display or logging:
Read table TJ02T using the status code from JEST to retrieve the status description.
6. Proposed Error Text:
- Specification changes are not permitted. The linked Process Order is already Released
- Delivery Date / Qty changed. Process Order is Released and may be impacted.
Proposed Technology to Use
Data Source Considerations
| Table | Field Name | Comments/Calculation/Field Manipulation |
|---|---|---|
Data Validation Considerations
| Table | Field Name | Comments/Calculation/Field Manipulation |
|---|---|---|
Custom Tables
Master Data
| Field | Description | Data Type/Length | Validation rule/ Value Help |
|---|---|---|---|
Configuration Table
| Field | Description | Data Type/Length | Validation rule/ Value Help |
|---|---|---|---|
Selection Screen Enhancement
| Field Name | Description | Select: | Data Type/Length | Default Value/ Validation rule/ Value Help | Selection Logic |
|---|---|---|---|---|---|
Processing Logic
Volumetrics
Performance Considerations
Error Handling
Testing
How to Test
Test Conditions and Expected Results
| ID | Condition | Expected Result |
|---|---|---|
Test Considerations/Dependencies
Other Information
Development Details
Package
| Package Name | Parent Package |
|---|---|
Enhancement Implementation
| Enhancement Type | Standard Definition Name | Custom Implementation Name | Design Rationale Reference |
|---|---|---|---|
Other Development Objects
| Object Type | Object Name | Purpose/High Level Logic | Design Rationale Reference |
|---|---|---|---|
Appendix
Custom Authorization Group Naming Convention
This table is based on the Syensqo development standards document. It provides the naming conventions for authorization groups to associated with custom reports and tables to comply with security requirements.
ABAP | ZFI | ZMM | ZPS | ZCO | ZSD | ZBC | ZFI | ZCA |
|---|---|---|---|---|---|---|---|---|
| TABLES | ZFIT | ZMMT | ZPST | ZCOT | ZSDT | ZBCT | ZFIT | ZCAT |