The purpose of this document outlines the conversion process for Right of Use (ROU) assets Master and Transactional data in SyWay S/4 HANA. The ROU Assets migration will move both the master and transactional data in a single step and there will be only one SAP standard template that will be utilized for both Master and Transactional data migrations. Syniti ADMM tool organises the execution of data extraction, transformation & mapping, loading and data quality (ETL). 

ROU Asset master primarily contains of the following information:

  • General information: Asset description, asset class, account determination, capitalization date etc. 
  • Time Dependent data: Cost Center, Plant, Location etc.,
  • Depreciation terms data: Depreciation keys, Useful life and Depreciation areas

Note: This conversion specification will only include to ROU assets that were created from underlying RE-FX contracts from object 1076. All other fixed assets (non ROU) will be managed using objects 1070, 9022 and 9028.

Conversion Scope

The scope of this document is to define a data upload approach for active ROU Assets from legacy systems into S/4HANA following the Master Data Design Standard DD-FUN-050 Master Data Standard_1070-Fixed Assets (incl. Sub Assets) 

Relevancy rule:

The data from legacy system includes:

  • Company code is in scope 
  • All active ROU Assets

The data from legacy system excludes:

  • All non-ROU assets

 Relevancy rule for Extraction: The following relevancy criteria to be considered for extracting active ROU Assets from both WP2 and PF2. Note: PI2 does not have ROU Assets

  • Go to table ANLA and filter based on company code (BUKRS) that are in scope and asset class (ANLKL) that are relevant to ROU. Ensure that that deactivation date (DEAKT) is blank.
  • Based on the result from step-1, go to table ANLZ (Time dependent terms). Filter the details based on company code (BUKRS), asset number (ANLN1) and asset sub-number (ANLN2)
  • Based on the result from step-1, go to table ANLB (Depreciation area terms). Filter the details based on company code (BUKRS), asset number (ANLN1) and asset sub-number (ANLN2). Note: One asset will consist of more than one line item depending on the number of depreciation areas that is set  up in the legacy system
  • Based on the result from step 1 and 3, go to table ANLC (Asset values). Filter based on company code (BUKRS), asset number (ANLN1), asset sub-number (ANLN2), fiscal year (GJAHR) and Depreciation areas (AFABE). For filtering on Fiscal year (GJAHR), this will depend on whether it is year end or mid-year migration.

          - Year end migration: This will depend on the data transfer date. Ex: If the data transfer date is 31.12.2027, then fiscal year (GJAHR) will be 2027

          - Mid year migration: This will depend on the data transfer date. Ex: If the data transfer date is 30.06.2028, then fiscal year (GJAHR) will be 2028

After this, retrieve the asset cumulative values.

i) ROU asset cumulative values KANSW
ii) ROU asset accumulated depreciation KNAFA. Note: For year end migration, the accumulated migration will equals to KNAFA + NAFAG as the accumulated depreciation
iii) ROU asset cumulative Unplanned depreciation KAAFA
iv) ROU asset ordinary depreciation posted in the current migration year NAFAG
v) ROU asset posted unplanned depreciation in the current migration year AAFAG

  • Go to table ANEP (Asset line item postings), filter based on company code (BUKRS), ROU asset number (ANLN1), ROU asset sub number (ANLN2), fiscal year (GJAHR) and accounting document number (BELNR). Then, retrieve the following:
  • Go to table ANLV (Insurance data), filter based on company code (BUKRS), ROU asset number (ANLN1) and ROU asset sub number (ANLN2). Then, retrieve the data for ROU asset insurance information.
  • Go to table ANLU (Asset master: user fields), filter based on company code (BUKRS), ROU asset number (ANLN1) and ROU asset sub number (ANLN2). Then, retrieve the user fields data for ROU assets

There are 2 group go-live as below:

  • Group 1 go-live is planned for 1 July 2028
  • Group 2 go-live is planned for 1 Jan 2029

If the currency of the depreciation area in the target S4 system is the same as the currency of the mapped depreciation area in the source system, the ROU asset balances will be copied from the mapped depreciation area of the source system. Otherwise, the asset balances will be converted from the asset balances of the depreciation area of the source system as per the mapping table by using the exchange rates for conversion as below:

  • For Group 1 Go live:  B/S spot rate as of 30 June 2028 will be used for Group Depreciation Areas  
  • For Group 2 Go live:  B/S spot rate as of 31 Dec 2028 will be used for Group Depreciation Areas

Note: If company codes (where local currency is not EUR) have depreciation area in EUR, this EUR depreciation area is currently not used anymore. (In the past, these EUR depreciation areas were used when BFC was not the consolidation tool).

ROU Assets will be migrated to respective group go live as described in Enterprise Structure Catalog - Google Sheets (worksheet 10. Company code).


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2ROU Assets3,270S/4 HANAWill be same as Source, unless any new Assets and/or deactivation of assets before Go-live
WP2ROU Assets1,044S/4 HANAWill be same as Source, unless any new Assets and/or deactivation of assets before Go-live

Additional Information

Multi-language Requirement

It was decided to apply approach below:

  • Field “Description Line1” (ANLA-TXT50) = Migrate as it is from legacy system to S/4HANA. The description could be any languages (not only the 4 core languages but also any other non-core languages.
  • Field “Description Line2” (ANLA-TXA50) = Migrate as it is from legacy system to S/4HANA. The description line 2 is used to add information on the description of the asset when the line 1 length is not enough.
  • Field "Asset main no.text" (ANLH-ANLHTXT) must be in English 

Document Management

N/A

Legal Requirement

There are no legal requirements relevant to data migration of ROU Assets

Special Requirements

N/A

Target Design

The technical design of the target for this conversion approach.

Load Sheet NameTableFieldData ElementField DescriptionData TypeLengthRequirement
Master detailsANLABUKRSBUKRSCompany CodeCHAR4Required
Master detailsANLA / ACDOCAANLN1ANLN1External/Legacy ROU Asset NumberCHAR12Required
Master detailsANLA / ACDOCAANLN2ANLN2ROU Asset Sub numberCHAR4Optional
Master detailsANLA / ACDOCAANLKLANLKLROU Asset ClassCHAR8Required
Master detailsANLATXT50TXA50_ANLTROU Asset DescriptionCHAR50Required
Master detailsANLATXA50TXA50_MOREROU Asset Description 2CHAR50Conditional
Master detailsANLASERNRAM_SERNRSerial NumberCHAR18Optional
Master detailsANLAINVNRINVNR_ANLAInventory NumberCHAR25Optional
Master detailsANLA / ACDOCAMENGEAM_MENGEQuantityQUAN13 with Decimal 3Optional
Master detailsANLA / ACDOCAMEINSMEINSBase Unit of MeasureUNIT3Conditional
Master detailsANLAANEQKANEQKAsset is managed historicallyNUMC1Optional
Master detailsANLHANLHTXTANLHTXTAsset Main Number TextCHAR50Optional
InventoryANLAIVDATIVDAT_ANLALast inventory dateDATS8Optional
InventoryANLAINKENINKENInventory indicatorCHAR1Optional
Posting InformationANLAAKTIVAKTIVDAsset Capitalization DateDATS8Required
Time Dependent DataANLZ / ACDOCAGSBERGSBERBusiness AreaCHAR4Optional
Time Dependent DataANLZ / ACDOCAKOSTLKOSTLCost CenterCHAR10Required
Time Dependent DataANLZ / ACDOCAWERKSWERKS_DPlantCHAR4Optional
Time Dependent DataANLZ STORTSTORTAsset LocationCHAR10Optional
Time Dependent DataANLZFKBERFKBERFunctional AreaCHAR16Optional
Time Dependent DataANLZ / ACDOCAPRCTRPRCTRProfit CenterCHAR10Optional
AllocationsANLAORD41ORD41Evaluation Group 1CHAR4Optional
AllocationsANLAORD44ORD44Evaluation Group 4CHAR4Optional
AllocationsANLAGDLGRPGDLGRPEvaluation Group 5CHAR8Optional
OriginANLALIFNRAM_LIFNRAccount Number of SupplierCHAR10Optional
OriginANLAHERSTHERSTManufacturer of AssetCHAR30Optional
OriginANLAVBUNDRASSCCompany ID of Trading PartnerCHAR6Optional
Net Worth ValuationANLAVMGLIVMGLIProperty Classification KeyCHAR4Optional
Net Worth ValuationANLAEIGKZEIGKZProperty IndicatorCHAR1Optional
Depreciation AreasANLB / ACDOCAAFABEAFABE_DDepreciation AreaNUMC2Required
Depreciation AreasANLBAFASLAFASLDepreciation KeyCHAR4Required
Depreciation AreasANLBNDJARNDJARUseful Life (in Years)NUMC3Optional
Depreciation AreasANLBNDPERNDPERUseful Life (in Periods)NUMC3Optional
Cumulative ValuesANLCAFABEAFABE_DDepreciation AreaNUMC2Required
Cumulative ValuesANLC / ACDOCAGJAHRGJAHRCurrent Fiscal YearNUMC4Required
Cumulative ValuesANLCKANSWKANSWCumulated Acquisition ValueCURR23 with Decimal 2Required
Cumulative ValuesANLCKNAFAKNAFAAccumulated Ordinary DepreciationCURR23 with Decimal 2Required
Cumulative ValuesANLCKSAFAKSAFACumulative Special DepreciationCURR23 with Decimal 2Optional
Cumulative ValuesANLCKAAFAKAAFACumulative Unplanned DepreciationCURR23 with Decimal 2Optional
Cumulative ValuesT093BWAERSWAERSCurrency KeyCUKY5Required
Posted ValuesANLCAFABEAFABE_DDepreciation AreaNUMC2Required
Posted ValuesANLC / ACDOCAGJAHRGJAHRCurrent Fiscal YearNUMC4Required
Posted ValuesANLCNAFAGNAFAGPosted Ordinary Deprec. for the YearCURR23 with Decimal 2Required
Posted ValuesANLCSAFAGSAFAGPosted Special Depreciation for the YearCURR23 with Decimal 2Optional
Posted ValuesANLCAAFAGAAFAGPosted Unplanned Deprec. for the YearCURR23 with Decimal 2Optional
Posted ValuesT093BWAERSWAERSCurrency KeyCUKY5Required
Posted ValuesANLCPSTENDPSTENDDepr. Posted Until (Including Period)NUMC3Required
Transactions (Tranf.Dur.FY)ANLCAFABEAFABE_DDepreciation AreaNUMC2Required
Transactions (Tranf.Dur.FY)ANEPBWASLBWASLAsset Transaction TypeCHAR3Conditional
Transactions (Tranf.Dur.FY)ANEPGJAHRGJAHRCurrent Fiscal YearNUMC4Optional
Transactions (Tranf.Dur.FY)ANEPLNRANLNRANSequence No. of Asset Line Items in FYNUMC5Conditional
Transactions (Tranf.Dur.FY)ANEPBZDATBZDATReference DateDATS8Optional
Transactions (Tranf.Dur.FY)ANEPANBTRANBTRAmount PostedCURR23 with Decimal 2Optional
Transactions (Tranf.Dur.FY)T093BWAERSWAERSCurrency KeyCUKY5Required


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below. Note: DCT is not required for this object 9108. DCT is shown in table below for reference only, just in case in the future data migration, DCT may be required.

image-2025-6-10_15-39-25.png

The conversion process will be largely automated using Syniti ADMM as the conversion tool:

Process

Activity

Extract

Extract involves collecting data from the source.

The source is a SAP system, Extract means to pull the required data from source systems into repository using Syniti ADMM.  There are 2 steps for this method:

  1. Perform full data extraction from relevant ROU Assets tables in the source system(s).
  2. Apply Relevancy criteria for filtering the data that will be applicable according to Target Design.

Transform

There are 2 steps of Transform activities that can happen in ADMM:

  1. Perform mapping and data transformation rules.  Some data will need to be mapped to the to-be values and/or updated according to the rules as per design requirement in target system.
  2. Prepare load-ready data in the structure and format that is required for loading via SAP Data Migration Cockpit or any other standard tool.  This step also produces the load data ready for business to perform Pre-load Data Validation.

Load

This process includes:

  1. Execute the automated data load into target S4HANA system using load tool. 
  2. Once the data is loaded to target system, it will be extracted and prepared for Post Load Data Validation.

Data Privacy and Sensitivity

N/A

Extraction

The ROU Assets shall be extracted from SAP ECC and migrated using the Syniti Migrate. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate. Note: DCT is not applicable for this object 9108

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

1.      

Extract ROU assets from ANLA table in PF2 and WP2

Syniti team

2.      

Apply Asset Relevancy criteria on the extracted records.

Syniti team

3.  

Extract Time Dependent Data of ROU asset master records from ANLZ table in PF2 and WP2.

Syniti team

4.

Extract Depreciation Terms Data of the ROU asset master from ANLB table in PF2 and WP2.

Syniti team

5.

Extract ROU Asset master text from ANLH table in PF2 and WP2.

Syniti team

6.Extract Insurance Data of ROU asset master records from ANLV table in PF2 and WP2.Syniti team

Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
N/A




Data Collection Template (DCT)

Field NameField DescriptionRule
N/A

Extraction Dependencies

Item #Step DescriptionTeam Responsible
1.Data cleansing of legacy ROU assets where associated RE-FX contracts are no longer available for valuation.Business
2.Data cleansing of legacy ROU assets where ROU assets are still exist though RE-FX contracts are expired, in this instance, ROU assets might require to transfer to normal asset.Business

Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1.      

Ensure that all of the fields that require value mapping have the latest signed-off and imported into Syniti Migrate.

Data team

2.      

Go to Process Area Launch and Process the Object – ROU Asset

Data team

3.      

Launch the Objects to execute transformation.

Data team

4.      

Perform transformation ROU Assets extracted from PF2 and WP2 where target values will be derived from mapping tables.

Data team

5.     

Generate Pre-Load reports in Syniti Migrate.

Data team

6.      

Generate data load count in Syniti Migrate.

Data team

7.   

Log errors as defects, if any and address resolutions. Close defects.

Data team

8.     

Re-transform and re-validate the Pre-load reports if necessary.

Data team

9.

Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

Business

10.

Analyze and resolve any pre-load defects logged by business.

Data team

Transformation Rules

The ROU asset takeover values will be based on the currency of the target depreciation area as depreciation areas are defaulted from the chart of depreciation assigned to the company code in the target system. Thus, depreciation area/chart of depreciation in the target system will be mapped to the depreciation area/chart of depreciation in the legacy system if the currency is the same.

 - If the target depreciation area is found in the mapping table, the takeover values will be copied from the source depreciation area.

 - Otherwise, will be translated from the gross values found in the Book Depreciation area, refer to section "Depreciation area in Foreign Currency".

Depreciation area in Foreign Currency:

Asset Balances in Group Currency depreciation area will not be migrated as per values Group depreciation areas in the legacy system. If the target depreciation area/chart of depreciation is not found in the mapping table, the corresponding balances for the depreciation area will be derived from the Book Depreciation area i.e. 01-Leading.

For conversion, the exchange rate would be as below:

  • For Group 1 Go live:  B/S spot rate as of 30 June 2028 will be used for Group Depreciation Areas   
  • For Group 2 Go live:  B/S spot rate as of 31 Dec 2028 will be used for Group Depreciation Areas

The translation will be done in ADMM and align to the Trial Balance Conversion. 

Translation logic to determine the balance:

In SAP, currencies (data type CURR) are stored with 2 decimal number but can be configured to display with different number of decimals (Table TCURX)

The logic to determine the balance (this logic should apply to all currencies):

  1. Check table T093B in legacy system to retrieve the currency for the company code and depreciation area.
  2. Check table TCURX in legacy system to find the number of decimal places for the currency. If '0', multiply the amounts by 100, else (including no entry found in TCURX), no action

Currency Adjustment During Migration (TCURX Consideration):

In SAP, the TCURX table defines the number of decimal places used for each currency. This impacts how amounts are stored internally in database tables versus how they are displayed externally in user interfaces or reports.

Currencies such as JPY (Japanese Yen), KRW (Korean Won), or VND (Vietnamese Dong) are typically configured with no decimal places (TCURX-CURRDEC = 0).

Understanding and correctly applying the TCURX rules is essential during data migration to ensure financial consistency between ECC and S/4HANA. Internal vs External Currency Representation example:

Internal Vs External Currency Amount Representation:

The amount value as displayed to users in SAP screens and reports is 96015 JPY (external), whereas, the amount value stored in database tables for computation is 960.15 JPY (internal). 

During data migration, these internal (technical) amounts must be converted to external amounts to ensure accuracy and consistency in the target S/4HANA system through multiplied by factor = 10² if target has 2 decimals

Conversion Formula: External Amount = Internal Amount * 10 to the power (2 - Number of decimal for the currency in TCURX table)

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

The following legacy values have to be transformed to target SyWay values.
Mapping Table NameMapping Table Description

Company code

Mapping of legacy company code to SyWay company code

Asset Class

Mapping of legacy ROU asset Class to SyWay ROU asset class

Cost center

Mapping of legacy cost centre to SyWay cost centre

Profit center

Mapping of legacy profit centre to SyWay profit centre

Plant

Mapping of legacy plant code to SyWay plant code

Location

Mapping of legacy location to SyWay location

Evaluation group 1 

Mapping of legacy EG1 to SyWay EG1

Evaluation group 5

Mapping of legacy EG5 to SyWay EG5

Depreciation area

Mapping of legacy depreciation areas to SyWay depreciation areas

Depreciation key

Mapping of legacy depreciation key to SyWay depreciation key

Classification Key

Mapping of legacy Classification Key to SyWay Classification Key

Trading Partner

Mapping of legacy Trading Partner to SyWay Trading Partner

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1

Ensure that all of the fields that require value mapping, as specified in section "Mapping tables", have the appropriate values mapped and imported into ADMM.

Data team


Pre-Load Validation

Project Team

Completeness

TaskAction
Pre-load reportsCheck that the number of ROU Assets in the upload file are the same as the number of contracts in the ETL file
Pre-load reportsReconciliation of record count: Total number of ROU Assets in the extraction is compared against the total number of ROU Assets in the legacy system.

Accuracy

TaskAction
Conversion Accuracy

R2R Data Team to ensure that all fields listed below pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Filed Length Checks
  5. All necessary config values
  6. Custom fields if any
Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the ETL.

Business

Completeness

TaskAction
Verify record countBusiness Data Owner/s to verify that the total number of relevant records from the source is equal to the total number of records in the Preload and Load Sheets. 

Accuracy

TaskAction
Conversion accuracy

Business Data Owner/s to verify that all ROU assets are transformed accurately as per the ETL rules.

Review List of Error reports in ADMM for any mismatch or missing transformed values.

Load

ROU Assets will be migrated using the SAP tool 'Migration Cockpit' and 'Object: Fixed asset (incl. balances and transactions)'. Migration template is attached as a reference.

Source data for Fixed asset (incl. balances and transactions).xml

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Ensure Pre-load sign-offs are obtained

R2R Data team

2

Ensure the load tools are transported into the correct tool instance

R2R Data team

3

Go to <Load tool>

R2R Data team

4

Load 1 or 2 records for "ROU Assets" to validate if data is loaded successfully without errors. If errors, log defects and obtain resolution 

R2R Data team

5

Proceed with full load if step 4 is successful and validated

R2R Data team

6

Validate few records loaded by accessing standard transactions or tables from S/4HNA E.g. AS03, AW01N, AR01 etc.,

R2R Data team

7

Generate post load report if step 6 is validated

R2R Data team


Load Phase and Dependencies

The load phase for this object is Pre Cutover and this object will be loaded before RE-FX Contracts (object 9108) is loaded. 

Configuration

The table below shows a key configuration elements

Item #Configuration Item

1.      

Company Code

2

Chart of Depreciation

3

Asset Class

4

Depreciation Areas

5

Depreciation Key

6

GL Account determination

7

i) Soft Config - ROU Asset number ranges

ii) Soft Config - Asset Data Transfer Configuration

·       Transfer date – Last day of the month prior to go-live

·       Legacy Data Transfer Status = In Preparation

·       Document type 9A  

Conversion Objects

Object #Preceding Object Conversion Approach
CNV-1073Profit Centre
CNV-1074Cost Centre

Error Handling

The table below shows some possible system errors for this data object during data load. All data load error is to be logged as defect and managed within the Defect Management

Error TypeError DescriptionAction Taken

Invalid Data

Relevant cost center is not valid in the validity of time dependent data in the ROU Asset master to be loaded.

Check whether the validity of time dependent data in cost center needs to be changed.

Post-Load Validation

Project Team

The following post load validations will be performed by the project team.

Completeness

TaskAction
Reconciliation of Total Record Count

Total number of records loaded for ROU Assets and  Depreciation terms will be generated in the Post-load reports in ADMM.

ROU Assets in the Post Load report is compared against total number of ROU assets in the pre-load reports by company code, Asset class, cost center, depreciation key etc., 

Mandatory fields checkReview the post load file and note the records that failed the mandatory fields check and fix the errors
Post-load activityRecalculate ROU Asset values using t.code AFAR

Accuracy

TaskAction
Check values in key fields for accuracy

Post-load reports will have the same structure as the load file and some additional columns as required to facilitate the post load validation.

Leverage the Syniti ADMM tool to create a Post load report that reports S/4 HANA loaded records along with the legacy values side-by-side to allow for 100% check of all these fields in the shortest possible time. If any mismatch, they will report under 'Error' for corrective action.

Business

The following post load validations will be performed by the business.

Completeness

TaskAction
Record Count CheckReview the record count report from the Data Team and ensure it is correct by cross-checking with the record count confirmed during Pre-load Business Validations.

Accuracy

TaskAction
Spot checksBusiness should choose some ROU Assets and perform comprehensive checks of the fields in S/4 HANA. Recommended to verify sample data per company code and Asset class combination.
Conversion AccuracyVerify that the ROU Assets in target S/4 HANA are loaded correctly via load program and validate post load reports using standard t.code AR01 from S/4 HANA.



Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • ROU Assets are in scope based on data design and any exception requested by business.
  • ROU asset master cleansing is completed.
  • All ROU assets (associated with RE-FX contracts) must be deactivated (i.e. populate the deactivation date field).

See also

Change log

Version Published Changed By Comment
CURRENT (v. 21) Mar 30, 2026 17:37 PARA-ext, Anil
v. 58 Jan 21, 2026 09:19 PARA-ext, Anil
v. 57 Jan 21, 2026 09:03 PARA-ext, Anil
v. 56 Jan 21, 2026 08:58 PARA-ext, Anil
v. 55 Jan 20, 2026 15:42 PARA-ext, Anil
v. 54 Jan 20, 2026 15:11 PARA-ext, Anil
v. 53 Jan 19, 2026 10:55 PARA-ext, Anil
v. 52 Jan 19, 2026 10:53 PARA-ext, Anil
v. 51 Jan 16, 2026 17:50 PARA-ext, Anil
v. 50 Jan 16, 2026 17:26 PARA-ext, Anil

Go to Page History

  • No labels