The purpose of this document is to define the conversion approach to create conversion for Object 9107 – Activity Rates in S/4 HANA.

Activity Rates are the current active rates for different activities performed either for production, plant maintenance, HR etc. The activity rates capture the planned cost for a certain activity over a period of time. E.g. Factory overhead is charged to production orders via relevant activity types maintained for absorbing factory overheads. The activity rates are maintained for a combination of activity types and cost centre combination.

The document details out the field list, extraction criteria, scoping, mapping, transformation logic, generation of the pre-load file and loading of the same with respect to the object 9107- Activity Rate.

The requirement is to migrate planned activity rates. The actual activity rates would be performed within the S4 system as a part of the month end activity.

The activity rates will be provided by the business in a Data Collection Template (hereinafter referred to as DCT) and transformed as applicable for S4HANA in Syniti and then loaded using the excel upload option. 

Conversion Scope

The scope of this document covers the approach for migration of planned activity prices.

The data from legacy system needs to be confirmed by the business.  

List of source systems and approximate number of records <number of company codes to be confirmed relevant for activity rates needs to be confirmed>. The data will be provided by the business in the DCT page. The data will not be extracted and transformed in Syniti. The source of data is DCT and not PF2 and WP2. 


Additional Information

Multi-language Requirement

None

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable

Target Design

The Target design of the object 9107 – Activity rates is as below

Table

Field

Data Element

Field Description

Data Type

Length

Requirement

COEJT

KOKRS

KOKRS

Controlling area

CHAR

4

Mandatory

COEJT

BELNR

CO_BELNR

Document Number

CHAR

10

System Generated

COEJT

BUZEI

CO_BUZEI

Posting Row

NUMC

3

System Generated

COEJT

PERBL

PERBL

Period Block

NUMC

3

Mandatory

COEJT

TKF001

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF002

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF003

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF004

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF005

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF006

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF007

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF008

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF009

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF010

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF011

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKF012

TKFXXX

Fixed Price per Activity Price in CO Area Currency

CURR

Length:23 and 2 Decimals

Mandatory

COEJT

TKE001

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE002

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE003

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE004

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE005

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE006

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE007

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE008

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE009

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE010

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE011

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

TKE012

TKEXXX

Price Unit in CO Area Currency

NUMC

5

Mandatory

COEJT

LEDNR

LEDNR

Ledger for Controlling Objects

CHAR

2

Optional

COEJT

OBJNR

J_OBJNR

Object Number

CHAR

22

System Generated

COEJT

GJAHR

GJAHR

Fiscal Year

NUMC

4

Mandatory

COEJT

VERSN

VERSN

Version

CHAR

3

Mandatory

COEJT

VRGNG

CO_VORGANG

CO Business Transaction

CHAR

4

System Generated

COEJT

REFBZ

CO_REFBZ

Posting Row of Reference Document

NUMC

3

System Generated

Data Cleansing

For the purpose of the Object 9107- Activity rates, the data cleansing is not applicable. It is expected that relevant records will be provided in DCT by business.

Conversion Process 

For activity rates the data will be collected in the DCT page. The conversion process will depend upon the DCT (Data Collection Template) which will be provided by the business. This DCT will be used for transformation and generation of the pre-load file. The activity prices will be uploaded via excel upload option in KP26.  The conversion and transformation for activity rates will not happen via Syniti as the data will be provided by business in the DCT page.

Data Privacy and Sensitivity

None

Extraction

For object 9107 – Activity rates, the extraction is not applicable as this will be a DCT provided by business.

Selection Screen

Not Applicable

Data Collection Template (DCT)

Target Ready Data Collection Template will be created for 9107- Activity Rates data with exception of some fields which require transformation as mentioned in the transformation rule.

9107 – Activity Rates - DCT Rules

Field Name

Field Description

Rule

KOKRS

Controlling area

This is a Mandatory field

Enter the controlling area for which the rates belong.

GJAHR

Fiscal Year

This is mandatory.

Enter the Fiscal year for which the rates are being entered.

PERBL

From Period

This is a Mandatory field

Enter the from period

PERBL

To Period

This is a Mandatory field

Enter the To period

VERSN

Version

This is mandatory

Enter “0”

KOSTL

Cost Centre

This is a Mandatory field

Enter the cost centre for which the activity price is being maintained

LSTAR

Activity Type

This is a Mandatory field

Enter the Activity type for which the activity price is being maintained

LSTXX

Activity Quantity

This is a Mandatory field

Enter “1”

SPRED

Distribution Key

This is a Mandatory field

Enter “1”

TKFXXX

Fixed Price

This field is optional

Enter the fixed price is the activity price is based on fixed price basis

SPRED

Distribution Key Fixed Price

This is a Mandatory field

Enter “1”

TKVXXX

Variable Price

This field is optional

Enter the Variable price is the activity price is based on fixed price basis

SPRED

Distribution Key Variable Price

This is a Mandatory field

Enter “1”

TKEXXX

Price Unit

This is a Mandatory field

Enter the price unit for which the price is being maintained e.g. "1", "1000" etc.

WAERS

Currency

This is a Mandatory field

Enter the currency in which the activity rates are to be maintained

SPRED

Distribution Key Plan Activity

This is a Mandatory field

Enter “1”

VKSTA

Allocation Cost Element

This is a Mandatory field

Enter the allocation cost element to be used for uploading the prices


Extraction Dependencies

For object 9107 – Activity Rates, no extraction dependencies are applicable as this is a DCT.

Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #

Step Description

Team Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings are maintained in Syniti

Data team

4

Ensure that the relevancy rules for extraction are signed off by all relevant business stakeholders. If a DCT page is to be used then, ensure that Signed off DCT from business has been received and maintained in Syniti 

Syniti/Data team

5

Execute transformation for the object 

Syniti team

6   

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Syniti/Data team

7.      

Generate Pre-Load reports.

Syniti team

8.      

Generate data load count.

Syniti team

9.      

Log errors as defects, if any and address resolutions. Close defects.

Syniti/Data team

10.      

Re-transform and re-validate the Pre-load reports if necessary.

Syniti/Data team

11.   

Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

Business

12.   

Analyse and resolve any pre-load defects logged by business.

Syniti/Data team

13.   

Repeat steps 5 to 11 if necessary

Syniti/Data team

14.   

Proceed to pre-load validations

Data team

Transformation Rules 

Rule #

Source system

Source Table

Source Field

Source Description

Target System

Target Table

Target Field

Target Description

Transformation Logic

01

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

KOKRS

Controlling Area

As per DCT

02

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

GJAHR

Fiscal Year

As per DCT

03

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

PEBRL

From Period

As per DCT

04

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

PEBRL

To Period

As per DCT

05

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

VERSN

Version

As per DCT

06

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

KOSTL

Cost Centre

As per DCT

07

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

LSTAR

Activity Type

As per DCT

08

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

LSTXX

Activity Quantity

As per DCT

09

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

SPRED

Distribution Key

As per DCT

10

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

TKFXXX

Fixed Price

As per DCT

11

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

SPRED

Distribution Key Fixed Price

As per DCT

12

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

TKVXXX

Variable Price

As per DCT

13

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

SPRED

Distribution Key Variable Price

As per DCT

14

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

TKEXXX

Price Unit

As per DCT

15

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

WAERS

Currency

As per DCT

16

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

SPRED

Distribution Key Plan Activity

As per DCT

17

DCT

NA

NA

CONSTRUCT

S4HANA

COEJT

VKSTA

Allocation Cost Element

As per DCT

Transformation Mapping

Below value mapping tables should be constructed in Syniti 

Mapping Table Name

Mapping Table Description

Controlling Area

Controlling area should be configured and be available in value mapping or as default if only one controlling area is being used

Ledger

Ledger(s) should be configured and should be available.

Version

Version should be configured and should be available.

Transformation Dependencies

List the steps that need to occur before transformation can commence

Item #

Step Description

Team Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings as maintained in the Syniti

Data team

4

Ensure that Signed off DCT from business has been received and maintained in Syniti

Syniti/Data team

5

Confirm on the extracted values

Syniti, Data and business

Pre-Load Validation

Project Team

The Pre Load validations are performed by Project Team

Completeness

Task

Action

Generation of
Pre-load reports

Mandatory field check.

  • Check if the fiscal year and period is correctly maintained
  • Check if the version is correct
  • Check if the activity types and corresponding cost centre are correct.
  • Check the Price unit
  • Check the controlling area
  • Enter correct prices corresponding to the price unit.

Record Count

Record Count

Confirm the record counts in preload summary report

  • Total Records: 
  • Valid Records:

Invalid Records:

Business Confirmation

Data team after the initial validation of Pre-Load validation based on the pre agreed validation checklist

To send the Pre-Load file to the Business Representatives for all plants/valuation area in scope for conversion

Business Representatives to validate the pre-load file

Agree with data team on the next steps for erroneous records


Accuracy

Task

Action

Mandatory field mapping and transformation

Obtain a list of the fields to be populated with values from mapping files and ensure all these fields contain S/4HANA values. 
Mandatory field check.

  • Check if the fiscal year and period is correctly maintained
  • Check if the version is correct
  • Check if the activity types and corresponding cost centre are correct.
  • Check the Price unit
  • Check the controlling area

Business Value Checks

The total values as per the relevancy /DCT and pre-load value are matching for the fields containing the limit amounts

Records in Errors

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.

Business

The following pre-load validations will be performed by business.

Completeness

Task

Action

Check Data load register count

Business Data Owner/s to verify that the total number of relevant records to be converted as per relevancy / DCT is equal to the total number of records in the Preload file.

Accuracy

Task

Action

Conversion accuracy

To check and validate the load files with all the transformation and mapping rules, to be signed off.

Load

The load process includes:

  1. Execute the automated data load into target system using load tool or produce the load file if the loading of records to be done via a custom program <TBC>, as LTMC for this object is not available as of now. 
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation with side by side check of each fields in scope of the objects with fields to be displayed as XXXX_ECC, XXXX_S4HANA, XXXX_MATCH ( As TRUE or FALSE) with an additional column denoting fields not matching and status of loading in S/4HANA as LOADED_IN_S4HANA ( As TRUE or FALSE)  
  3. Load Template for activity rates  

Load Run Sheet

Item #

Step Description

Team Responsible

1

Go to load file and pick 5 data records, load manually without any tool. See what happens. If all okay, proceed with the next step.

Data team

2

Go to load file and pick 10 records and load them with the tool. No action if the previous step has fallen. If not, then continue to load 10 records with the tool. Check if everything went okay.

Data team

3

Proceed with the full load if steps one and two were succeed else fix the issue with records

Data team

4

Validate few records loaded by accessing standard transactions from S/4HNA e.g. KP27 to check the activity prices.

Data team

5

Generate post load report if step 5 is validated

Data team

6

Log errors as defects, if any and address resolutions. Close defects.

Data team

7

Resolve defects by reupload and re-generate post load reports if necessary.

Data team

8

Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.

Business

9

Repeat steps 1 to 5 if necessary.

Data team


Load Phase and Dependencies

The load phase for this object is ideally relevant for pre-cutover Phase 4

Configuration

Below configurations must exist to facilitate the conversion of this object.

Item #

Configuration Item

01

Controlling Area (Check Table: TKA01)

02

Company code (Check Table: T001)

03

Activity types (Master Data)

04

Version (Check Table: TKA09)

05

Price Indicatory (Check Table: TKA10)

 Conversion Objects

Object #

Preceding Object Conversion Approach

CNV-1074

Cost Centre(s)

CNV-1071

Activity types

CNV-1072

Exchange Rates

Error Handling

The table below depicts some possible system errors for this data object during data load.  All data load error is to be logged as defect and managed within the Defect Management

Error Type

Error Description

Action Taken

Activity price 

Activity price wrong conversion with regards to price unit

Ensure that the price unit is correctly picked

Fiscal Year

Enter correct fiscal year

Correct fiscal year

Activity type

Cost centre and activity type combination does not match

Ensure to maintain the correct cost centre and activity type match.

Post-Load Validation

Project Team

The following post load validations will be done by Project Team

Completeness

Task

Action

Reconciliation of Record Count

Record Count - Count and check how many records were loaded vs. Records in the load file (Each mock has its own data record count)

Check for logs from Load and fix erroneous records, if any.

Accuracy

Task

Action

Check values in key fields for accuracy

Post-load reports will have the same structure as the load file and some additional columns as required to facilitate the post load validation.

Leverage on tool to create a Post Load report that reports S/4HANA loaded records along with the legacy values side-by-side to allow for 100% check of all these fields in the shortest possible time.

Any mismatch will be reported under the Post Load - Error report.

Business

The following post load validations will be done by business.

Completeness

Task

Action

Record Count Check

Review the record count report from the Data Team and ensure it is correct by cross-checking with the record count confirmed during Pre-load Business Validations

Business may also run transaction code KP27 to cross check the Activity Prices 


Accuracy

Task

Action

Field Checks

Check the fields to ensure that Activity Prices have been properly maintained

Value Check

Check the activity prices against activity types and corresponding cost centres.

Key Assumptions

  • Relevancy rules has been thoroughly validated and signed off by business.
  • Activity types and cost centre combination has been validated.

Change log

Version Published Changed By Comment
CURRENT (v. 13) Jan 13, 2026 10:12 GANESAN-ext, Shivkumar
v. 15 Jan 12, 2026 19:31 GANESAN-ext, Shivkumar
v. 14 Jan 12, 2026 14:28 GANESAN-ext, Shivkumar
v. 13 Jan 12, 2026 13:36 GANESAN-ext, Shivkumar
v. 12 Jan 09, 2026 15:57 GANESAN-ext, Shivkumar
v. 11 Jan 09, 2026 15:14 GANESAN-ext, Shivkumar
v. 10 Jan 09, 2026 10:05 GANESAN-ext, Shivkumar
v. 9 Jan 07, 2026 11:33 GANESAN-ext, Shivkumar
v. 8 Jan 07, 2026 11:14 GANESAN-ext, Shivkumar
v. 7 Dec 18, 2025 16:37 GANESAN-ext, Shivkumar

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels