| Status | Revision in Progress |
|---|---|
| Owner | TEE-ext, Paul |
| Stakeholders |
Purpose
The purpose of this document is to define the conversion approach to create Safety Certificate Template in S/4 HANA.
SAP Safety Certificate Templates are standardized forms used in SAP S/4HANA to manage workplace safety requirements. They allow planners to define safety precautions, link certificates to work permits, and ensure compliance with plant safety regulations. Templates streamline certificate creation by providing reusable structures tailored to specific activities or plants
In Syensqo’s SAP S/4HANA landscape a work permit template provides a predesigned structure that can be used to create work permits in a consistent format. Creating work permits using a template allows you to simplify and streamline the work permit generation process.
The governance of this object shall be managed through tier 2.
Conversion Scope
The scope of this document covers the approach for creating Safety Certificate Template into S/4HANA following the Safety Certificate Template Master Data Design Standard.
All Data for Safety Certificate Template are fully construted in the DCT.
The data from legacy system includes:
- Not applicable
The data from legacy system excludes:
- Not applicable
Note: There are no tables to extract from the source systems
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| DCT | All Permit to Work data will be fully constructed, as it does not currently exist in the source systems and represents a new design in the to-be Syensqo landscape. | 300 | S/4 HANA | 300 |
Additional Information
Multi-language Requirement
Based on the plant the language will be localized.
Document Management
Not Applicable
Legal Requirement
Not Applicable
Special Requirements
Not Applicable
Target Design
The technical design of the target for this conversion approach.
1.General information
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| ISFTYCERTTMPL | SAFETYCERTIFICATEINTERNALID | J_OBJNR | Number | CHAR | 22 | Mandatory |
| ISFTYCERTTMPL | SFTYCERTDESC | WCESTXT | Description | CHAR | 40 | Mandatory |
| ISFTYCERTTMPL | MAINTENANCEPLANNINGPLANT | IWERK | Maintenance Planning Plant | CHAR | 4 | Mandatory |
| ISFTYCERTTMPL | SAFETYCERTIFICATETYPE | WCEUSAGE | Safety Certificate Template type | CHAR | 3 | Mandatory |
| ISFTYCERTTMPL | SFTYCERTVALIDFRMDATE | WCEDATEFR | Valid From | DATS | 8 | Mandatory |
| ISFTYCERTTMPL | SFTYCERTVALIDFRMTIME | WCETIMEFR | Valid-From Time | TIMS | 6 | Mandatory |
| ISFTYCERTTMPL | SFTYCERTVALIDTODATE | WCEDATETO | Valid to | DATS | 8 | Mandatory |
| ISFTYCERTTMPL | SFTYCERTVALIDTOTIME | WCETIMETO | Valid-To Time | TIMS | 6 | Mandatory |
| ISFTYCERTTMPL | WORKCENTER | PPH_ARBPL | Main Work Center | CHAR | 8 | Mandatory |
| ISFTYCERTTMPL | WORKCENTERPLANT | WERKS_D | Main Work Center Plant | CHAR | 4 | Mandatory |
2.Safety Precautions
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| PTWSFTYRQMTGRP | PTWSFTYRQMTGRP | PTWSFTYRQMTGRP | Safety Precautions Category | CHAR | 3 | Mandatory |
| PTWSFTYRQMTTXT | PTWSFTYRQMTTXT | PTWSFTYRQMTTXT | Safety Precautions Description | CHAR | 100 | Mandatory |
3.Approvals
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| ISFCMAPPROVAL | SFTYCERTIFICATESUBOBJECTTYPE | WCETYP | Approval type | CHAR | 10 | Mandatory |
| ISFCMAPPROVAL | SFTYCERTIFICATEAPPROVALSTATUS | PTWEWORKPERMITAPPROVALSTATUS | Approval status | CHAR | 1 | Mandatory |
Safety Certificate Template Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Permit to Work Template information follows the Master Data Standard document that is located here.
Data Cleansing
Safety Certificate Template not exist in the legacy system. Therefore, data cleansing is not applicable.
Data for the Safety Certificate Templat will be captured directly in the Data Collection Template (DCT) and any required refinement will be carried out during the data construction activity.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| Not Applicable |
Note: List of Cleansing is maintained here: Conversion Specs Register (DCT & Cleansing Report)
Conversion Process
The high-level process is represented by the diagram below:
Collection will be done manually in the Data Collection Template for the following scenarios:
- For all A2D In-scope Planning Plants.
Data Privacy and Sensitivity
Not ApplicableExtraction
Data extraction is not applicable, as no corresponding data exists in the legacy system.Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| Not Applicable |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
| Not Applicable |
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for Safety Certificate Template data with exception of some fields which require transformation as mentioned in the transformation rule.
Note: All rules specified below should be documented as a tooltip in the DC Page.
Format:
- Line 1: Mandatory / Conditional
- Line 2: Remaining text
1.General information DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| SAFETYCERTIFICATEINTERNALID | Number | Mandatory. Staging identifier used to uniquely define a Permit to Work Template. |
| SFTYCERTDESC | Description | Mandatory. Note: - Template will start with three letters, which will be a prefix for the type of safety certificate (e.g. CON for Confined Space, HOT for hot work, etc). This is followed by a running number. The prefix for the description must be aligned with the safety certificate template type setup in the configuration, e.g. the description of a confined space certificate can only be created for a confined space certificate template type. - AAA - Safety certificate - NNN should be running number - All Letters must be Uppercase - There should be no duplicate descriptions within the same plant. -Example: CON-001, CON-002, etc. |
| MAINTENANCEPLANNINGPLANT | Maintenance Planning Plant | Mandatory. Note: Manual input based on plant where safety certificate template is designed for |
| SAFETYCERTIFICATETYPE | Safety Certificate Template type | Mandatory. |
| SFTYCERTVALIDFRMDATE | Valid From | Mandatory. Must be current or future date. No date in past. Must be in DDMMYYYY format |
| SFTYCERTVALIDFRMTIME | Valid-From Time | Mandatory. Must be in HHMMSS format |
| SFTYCERTVALIDTODATE | Valid to | Mandatory. Must be a date in future and later than the Valid From date. Must be in DDMMYYYY format |
| SFTYCERTVALIDTOTIME | Valid-To Time | Mandatory. Must be in HHMMSS format |
| WORKCENTER | Main Work Center | Mandatory. |
| WORKCENTERPLANT | Main Work Center Plant | Mandatory. |
2.Safety Precautions DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| PTWSFTYRQMTGRP | Safety Precautions Category | Mandatory. |
| PTWSFTYRQMTTXT | Safety Precautions Description | Mandatory. |
3.Approvals DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| SFTYCERTIFICATESUBOBJECTTYPE | Approval type | Mandatory. Note: Must be a valid value as per Safety Certifcate type. Multiple Approval types may be assigned. |
| SFTYCERTIFICATEAPPROVALSTATUS | Approval status | Mandatory. Note: To use the permit template in the process the final status must be A - Approved |
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.