You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 114 Next »

Status

  Update in progress

Owner
Stakeholders

Purpose

The purpose of this document is to define the conversion approach for Quota Arrangements to be uploaded into SAP S/4HANA as part of the Procurement Data Migration. Quota Arrangements are used to determine the distribution of procurement quantities across multiple sources of supply, providing control over vendor sourcing allocations. 


LINK TO MDS (Master Data Standard)



Conversion Scope

This conversion approach covers active and relevant Quota Arrangements maintained at the material, plant, and source (vendor or source list) level. Records from legacy ECC systems (e.g., PF2, WP2) will be extracted, validated, transformed, and loaded into the S/4HANA system.
Only quota entries linked to valid material (Relevancy for 2019) and vendor (Relevancy for 3007) combinations and with an active allocation percentage will be considered in scope. The load mechanism will be a DCT built from ECC extracts, and Business data input where needed.

Source lists associated with valid material, vendor, and plant combinations will be extracted into the DCT. The Business team will analyze this data and determine which source lists should be converted to QA.

The data extracted from legacy system includes:

  1. Quota arrangements header and Items records from systems PF2 and WP2 
  2. Source List records from systems PF2 and WP2

The data from legacy system excludes:

  1. Obsolete, deleted, or inactive quota records will be excluded.
  2. Quota arrangement for Material/Vendor/Plants not in scope will be out of scope for migration.


Relevancy Rules

  1. All materials contained against a Quota Arrangement must be valid and in scope based on Relevancy for 2019: Material basic View.
  2. All Vendors registered against a Quota Arrangement must be in scope based on (Relevancy for 3007: BP general), must be active and not blocked on any level.
  3. Quota Arrangements that are extended by default though, the material, to the following:
    1. Plants in scope
    2. Purchasing Orgs in scope
    3. Material Types in scope.
  4. Validity dates - Quota arrangements within a valid validity period will be migrated
  5. Quota - Quota's cannot be zero. Usually, when the Quota arrangement is zero it means that record is not used anymore.

The above rules also hold true for Source List extracts. Source lists will be validated by business in the following way:


  1. DCT template will be populated with initial Source List extract from both systems.
  2. DCT will be uploaded into the Syniti Knowledge Platform (SKP) (tool by Syniti, on a Construct page.
  3. Initial check to be done to verify that the data is valid, by data team.
  4. Additional fields will be added that are not for migration, to assist the business with decision making.
  5. Data available from Source list will be prepopulated in DCT and additional fields which are required for Quota Arrangement will be left blank for Business.
  6. An additional field indicator will be added when the Business can select the records for migration or leave unselected, which means the record will not progress.
  7. Data in DCT will be validated by Data team/Syniti and will be transformed using MDS rules to prepare for upload.



SOURCE SYSTEMS

SystemSystem Type
PF2ECC
WP2ECC


PROFILING


Total Records

SystemDescriptionRecord Count
PF2Header (EQUK)8

Item (EQUP)10

Source List (EORD)205782
WP2Header (EQUK)210

Item (EQUP)377

Source List (EORD)140999




Excluded Records

SystemDescriptionRecord Count
PF2Header (EQUK)2

Item (EQUP)6

Source List (EORD)66518
WP2Header (EQUK)190

Item (EQUP)339

Source List (EORD)3442

  

Potential records to Migrate

SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2Active records8 (HDR)S4/Hana

6 (HDR)

4 (Item)


Source List records



66518 (Item)

WP2Active records

Total 210

Validity period active: 20

S4/Hana

20 (HDR)

38 (Item)


Source List records



3442 (item)





Other Profiling (QA only)

SystemDescriptionRecord Count
PF2Validity date expired2
WP2Validity date expired186
PF2Vendor flagged for deletion/blocked1
WP2Vendor flagged for deletion175
PF2Materials flagged for deletion7
WP2Materials flagged for deletion70
PF2Vendor blank in Item record3
WP2Vendor blank in Item record44
PF2Zero Quota0
WP2Zero Quota46
PF2Quota = 10
WP2Quota = 14


Quota Arrangement Views to be migrated (if any)

N/A


Predecessor Objects

Material Master - Basic View (2019) → Materials - Additional data (2021) → Materials Purchasing View (2020) ----→ Indirectly to Quota Arrangements  

Business Partners - General (3007) → Business Partners (Vendor)- Intercompany (3027) →  Quota Arrangements (1098) 


Note: 

Material lot-sizing procedure should have the "Splitting quota arrangement" indicator set if you want to distribute the planned purchase requisition quantity across multiple sources of supply according to the defined quota arrangement during an MRP run. This is configured in the Materials Management Customizing under Consumption-Based Planning → Planning → Lot-Size Calculation → Define Lot-Sizing Procedure. 


Additional Information

Multi-language Requirement

Descriptions are not applicable for Quota Arrangement, but Plant and Purchasing Organization descriptions may be presented in English and logon language if available.

Document Management

N/A

Legal Requirement

N/A

Special Requirements

N/A



Target Design

Quota Arrangement will be loaded into SAP S/4HANA using standard structures:


The technical design of the target for this conversion approach.

HEADER FIELDS
TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUKMANDTMANDTClientCLNT3

Required

Key Field - Automatically updated

EQUKMATNRMATNRMaterial NumberCHAR18‑40*

Required

Key Field - Automatically updated

EQUKWERKSWERKS_DPlantCHAR4

Required

Key Field - Automatically updated

EQUKBDATUQUOBIQuota arrangement period valid untilDATS8

Required

Key Field - Automatically updated

EQUKVDATUQUOABQuota arrangement period valid fromDATS8

Required

EQUKQUNUMQUNUMNumber of quota arrangementCHAR10Automatic
EQUKERDATERDATDate on which record was createdDATS8Automatic
EQUKERNAMERNAMName of person who created the objectCHAR12Automatic
EQUKSCMNGSCMNGMinimum quantity for splitting quotaQUAN15.3

Conditional. Syensqo user need to specify the minimum quantity that a lot must have in order to be apportioned among several sources of supply in the planning run. 


Note: The allocation by quota using splitting quotas is only carried out via a requirement planning run. 

EQUKCHANGEDONTIMESTAMPLUTC timestamp when record was changedDEC21Automatic
ITEM FIELDS
TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUPMANDTMANDTClientCLNT3

Required

Key Field - Automatically updated

EQUPQUNUMQUNUMNumber of quota arrangementCHAR10

Required

Key Field - Automatically updated

EQUPQUPOSQUPOSQuota arrangement item numberNUMC3

Required

Key Field - Automatically updated

EQUPBESKZQBESKProcurement typeCHAR1

Required. Allowed procurement type will be based on material master data set-up. So if material master is set-up as External procurement, then user can only choose External procurement during quota arrangement creation.

Dropdown (Values: E - External, F - Internal)

EQUPSOBESSOBESSpecial procurement typeCHAR1

Conditional. If any special procurement such as consignment or subcontracting exist for a supplier, then choose relevant type in this field.

Dropdown (0-Std external procurement, 2-Consignment, 3-Subcontracting ,7-Stock trf, E-Standard In-House, P-Production in plant 2,9 - IS-OIL Stock tfr)

EQUPLIFNRELIFNVendor account numberCHAR10Required
EQUPBEWRKBEWRKPlant from which material is procuredCHAR4Not Required. Syensqo will not need quota arrangement for materials provided within internal production plants
EQUPQUOTEQUOTEQuotaDEC3Required in case of multiple suppliers exist for particular material. Quota will be used to identify portion of quantity to be procured from particular supplier.
EQUPQUBMGQUBASBase quantity of quota arrangement itemQUAN15.3

Conditional. Set quota base quantity if to avoid changes in the quantity to be allocated in case new source is added. If quota base quantity is not specified, then system will automatically allocate quantity to supplier(s).

EQUPQUMNGQUMNGAllocated quantity of quota arrangement itemQUAN15.3Conditional
EQUPMAXMGQUMAXMaximum quantity of quota arrangement itemQUAN15.3Conditional
EQUPVERIDVERIDProduction versionCHAR4Conditional
EQUPMAXLSMAXLSMaximum lot size per quota itemQUAN13.3Conditional
EQUPMINLSMINLSMinimum lot size per quota itemQUAN13.3Conditional
EQUPRDPRFRDPRFRounding profileCHAR4Conditional
EQUPKZEINKZEIMOnce‑only indicatorCHAR1Conditional
EQUPABRMGABRMGMaximum release quantity per periodQUAN13.3Conditional
EQUPABPERABPERPeriod related to release quantityCHAR1

Conditional

Dropdown (M-Month, W-Week, K- PP planning calendar)

EQUPABANZABANZNumber of periods for release quantityNUMC2Conditional
EQUPPREIHPREIHPriority for determination sequenceNUMC2Conditional
EQUPEMATNEMATNManufacturer part number's material numberCHAR18Conditional
EQUPPLIFZPLIFZPlanned delivery time in daysDEC3Conditional



Field Governance

Field Governance Rules


These governance rules apply to the individual fields within the data record.

Rule #Field LabelRule DescriptionValidation MethodConditional LogicCleansing Rule (Also see Data Cleansing section above)
1Quota arrangement numberThe Quota arrangement record number is 15 characters and is automatically generated in S4Upfront Automated

2MaterialThe material no is required to be specified by the user and is validated against relevant Material masters available in S/4 HANA.Upfront Automated

3PlantThe plant id is required to be specified by the user and is validated against relevant plants available in S/4 HANA.Upfront Automated

4Valid toThe date is updated as the date until the quota arrangement will be kept valid. This needs to be manually inputted.Upfront Automated
Validity periods must be investigated and possibly extended.
Format not aligned (31/12/9999 or 31/12/2999 or 31/12/2099)
5Valid fromThe date is updated as the date on which the record was created. Its automatically updated in database basis the record creation date in S/4 HANA.Upfront Automated
One valid from date was created on 30/06/2023, but the Valid-From date is 02/06/1983. There are 54 records where the Quota Valid-From date is earlier than the QA created date.
6Min. Qty for Splitting QuotaSyensqo user need to specify the minimum quantity that a lot must have in order to be apportioned among several sources of supply in the planning run.
Note: The allocation by quota using splitting quotas is only carried out via a requirement planning run.
Upfront manual/Default on the formNo fixed rule. User should populate depending on the quantity to be procured from supplier.
7Quota arrangement itemUniquely identifies the quota arrangement item within a quota arrangement period.Upfront manual/Default on the form

8Procurement TypeAt Syensqo, majority of the quota arrangement will be using External procurement as Planning Engine - Kinexis will identify internal procurement requirements.

Procurement type indicates procurement that is, in-house manufacture, i.e. "making in", or external procurement, i.e. "buying out" for the quota arrangement item.
Values available: - 1) External Procurement 2) Internal Procurement.
Allowed procurement type will be based on material master data set-up. So if material master is set-up as External procurement, then user can only choose External procurement during quota arrangement creation.
Upfront Automated

9Special procurementAt Syensqo, any special procurement exist for material in the quota arrangement against the supplier, then choose relevant type in this field.

This field value is optional and if not chosen, then it is considered to be Standard.
Values Available:-
1) For External Procurement - Standard, Consignment, Subcontracting, Stock Transfer
2) For Internal Procurement - In house Production, Production in plant
Upfront AutomatedOptional field - if not chosen, then value = STANDARD (1).
Otherwise either
1) For External Procurement - Standard, Consignment, Subcontracting, Stock Transfer
2) For Internal Procurement - In house Production, Production in plant

10SupplierThe Supplier is a business partner or organization that provides goods or services to your company.
At Syensqo, automatic validation of the supplier number will be carried out during creation of Quota Arrangement.
Upfront Automated
This is a required field, but the ECC data has some instances where the Supplier is blank. (e.g. Proc Type = E)
11Procurement PlantSyensqo will use procurement plant information in quota arrangement for materials sourced from internal production plants.
Key for the factory or branch of a company (that is, a company code), from which the material is to be procured. You can only enter one supplier number or one plant per quota arrangement item. In the case of process orders, this field should remain empty if the quota arrangement is being used to select a production version.
Upfront AutomatedFor materials sourced from internal production plants.
Key for the factory or branch of a company (that is, a company code), from which the material is to be procured. You can only enter one supplier number or one plant per quota arrangement item. In the case of process orders, this field should remain empty if the quota arrangement is being used to select a production version.
There are instances where no procurement plant is specified for an internal Procurement type (E) and Special procurement type (E)
12QuotaAt Syensqo, quota will be needed In case of multiple suppliers exist for particular material. Quota will be used to identify portion of quantity to be procured from particular supplier.Upfront AutomatedNo fixed rule. User should populate depending on the quantity to be procured from supplier.
13Quota Base QuantityAt Syensqo, set the quota base quantity manually or have it determined by the system.
This controls quantity for a quota arrangement.
The quota base quantity regulates the quota arrangement without having to change the quota if, for example, a new source is to be included in the arrangement.
Upfront manual/Default on the formNo fixed rule. User should populate depending on the quantity to be procured from supplier.
14Allocated QuantityNo inputs required. System will keep updating this field in real-time based on allocation.
Total quantity procured to date from the quota arrangement item source. This value is updated in planned orders, purchase requisitions, purchase orders, and scheduling agreement delivery schedule lines.
Upfront Automated

15Maximum quantity
At Syensqo, only provide if there is a need to restrict maximum quantity to be allocated using the quota arrangement to the particular supplier. Once this quantity is allocated, then quota arrangement will not suggest the source.
Upfront manual/Default on the form

16Production VersionSyensqo will use production versions (if applicable) in case of Internal procurement i.e. material sourced from Syensqo's plant and procurement type is maintained as Internal Procurement.
Key which determines the various production techniques according to which a material can be manufactured. The production version determines the following:
1)the BOM alternative for a BOM explosion
2)the task list type, the task list group and the task list group counter for allocation to task lists
3)lot-size restrictions for repetitive manufacturing
Upfront manual/Default on the formWhen procurement type is Internal, and the material is sourced from a Syensqo plant.
If applicable??? then a production version is used

17Maximum Lot SizeMaximum PO quantity that may be allocated to a source of supply per order proposal in the planning run. If the shortage (undercoverage) quantity exceeds the maximum lot size, the quota system is re-applied to the remaining quantity.
At Syensqo, lot size will only be used in case material to be purchased in specified lots from the respective supplier.
When material is subject to lot size purchasing and there is a need to provide upper limit of lot size during supplier allocation using quota arrangement. System will create multiple orders if quantity to be purchased is more than maximum lot size.
Note: This information will override information maintained in material master data
Upfront manual/Default on the formNo fixed rule. User should populate depending on the quantity to be procured from supplier.
18Minimum Lot SizeMinimum order quantity that may be allocated to a source of supply per order proposal in the planning run. If the shortage (undercoverage) quantity is less than the minimum lot size, the latter quantity will be allocated to the source instead of the former.
At Syensqo, lot size will only be used in case material to be purchased in specified lots from the respective supplier.
When material is subject to lot size purchasing and there is a need to have lower limit lot size during supplier allocation using quota arrangement, provide minimum lot size quantity. System will create procurement proposal for minimum lot size quantity if requirement quantity if smaller.
Note: This information will override information maintained in material master data
Upfront manual/Default on the formNo fixed rule. User should populate depending on the quantity to be procured from supplier.
19Rounding ProfileAt Syensqo, when rounding profile is specified, system will create procurement proposal based on the rounding profile.
Note: This will take preference over material master information.
Upfront manual/Default on the formIf available in Material master, will be defaulted to this value, otherwise, manual input by user if required.
20Indicator: "Once-Only"Specifies that a source may only be taken into account once in the apportionment of a lot.
This option will avoid situation where multiple procurement proposals will be generated by the system depending upon maximum lot size.
At Syensqo, please maintain if needed only when maximum lot size quantity is maintained.
Upfront manual/Default on the formOnly maintained when the maximum lot size is maintained, if needed.
21Max. Release QtyThe maximum release quantity defines the maximum available capacity of a source of supply.
At Syensqo, if supplier has provided limit on quantity capacity, then maintain the values.

The "maximum release quantity" defines the maximum quantity that a source of supply can make available/supply within a specified timeframe. The maximum release quantity is only taken into account in the planning run within MRP, not when purchase requisitions or planned orders are created manually.
Upfront manual/Default on the formif supplier has provided limit on quantity capacity, then maintain the values.
22Period for Release QuantityPeriod to Which the Release Quantity Relates.
At Syensqo, maintain this info if supplier provides the maximum release quantity for a certain period of time.
Upfront manual/Default on the formmaintain this infor if supplier provides the maximum release quantity for a certain period of time
23Number of PeriodsIn this field, you determine the number of periods for which the maximum release quantity is valid.
At Syensqo, when maximum release quantity and period for release quantity are maintained, then maintain number of periods.
Upfront manual/Default on the form when maximum release quantity and period for release quantity are maintained, then maintain number of periods.
24PriorityThis priority will define sequence of source of supply irrespective of quota rating and quota allocated quantity.
At Syensqo, maintain priorities based on preference of supplier to be allocated as a source using quota arrangement.
Upfront manual/Default on the formmaintain priorities based on preference of supplier to be allocated as a source using quota arrangement.
25MPN: MaterialMPN Material field (Manufacturer Part Number) in Quota Arrangements is relevant if using MPN material procurement — a setup where procurement manufacturer-specific parts under a manufacturer part profile (MPN profile).
At Syensqo, MPN material will only be used if quota to be managed at individual MPN material level. There is no need identified at Syensqo.
Upfront manual/Default on the formMPN material will only be used if quota to be managed at individual MPN material level. There is no need identified at Syensqo (RAVI)
26Planned delivery time in daysPlanned Delivery Time in Days field in the Quota Arrangement plays a key role in source determination and scheduling, particularly when you have multiple sources of supply for a material.
At Syensqo, maintain planned delivery time at Quota arrangement in case there is a need to override the delivery time maintained in vendor master.
Upfront manual/Default on the formmaintain planned delivery time at Quota arrangement in case there is a need to override the delivery time maintained in vendor master.








Validation Method
These validation method apply to the object overall. They relate to the creation, blocking or deletion, or duplicate checks that must be applied.
Method #Validation MethodDefinition
1Ongoing ManualManual checks only by MDO.
2Upfront AutomatedSAP validates upon entry.
3Ongoing AutomatedAutomated method to check data against standards and report KPIs
4HybridCombination of Automated activities and manual intervention in DSP
5Upfront manual/Default on the formManual check upon data entry



Data Cleansing

IDCriticalityError Message/Report DescriptionCleansing Report RuleOutputSource SystemCleansing Report Required?Responses from Functional on errors/additional cleansing
001MediumMaterial (MATNR) not in the approved Material Master scopeMaterial (MATNR) not in the approved Material Master scopeExclude the line itemPF2/WP2

002MediumMaterial flagged for deletionMARA–LVORM = X or MM03 deletion flag    Exclude the line itemPF2/WP2

003MediumVendor flagged for deletion or blocked for purchase or has a central posting block.

LFA1.LVORM = X and other - please see Vendor relevancy report.

LFA1.SPERM = X

LFA1.SPERR = X

Exclude or replace with valid alternatives. Business to receive these in a reportPF2/WP2NO

Vendor relevancy report:

004MediumWhere a Quota is Zero, it usually means that the QA has been closed.Quota quantity = 0Investigate, exclude or replace with valid quota.PF2/WP2YES

RESPONSE FROM JULIE WILLIAMS (PDM-398)

If they are complete then we don’t take them.  The actual data will change between now and go live.

Work based on data that is in date and valid.

005MediumValidity periods must be investigated and possibly extended.
Format not aligned (31/12/9999 or 31/12/2999 or 31/12/2099)
QA valid to date (EQUK.BDATU) = 31/12/9999Investigate and cleansePF2/WP2YES

RESPONSE FROM JULIE WILLIAMS (PDM-398)

All 3 are valid - we can’t force the users to use a set end date.  

We should take the date as it is in the system.  IF for some reason we are combining two, take the latest date.

006MediumOne valid from date was created on 30/06/2023, but the Valid-From date is 02/06/1983. There are 54 records where the Quota Valid-From date is earlier than the QA created date.EQUK.VDATU < EQUK.ERDATInvestigate and cleansePF2/WP2YES

RESPONSE FROM JULIE WILLIAMS (PDM-398)

Yes this is valid - you can set an earlier date when you create.  

We should take the dates as they are.

007MediumThis is a required field, but the ECC data has some instances where the Supplier is blank. (e.g. Proc Type = E)EQUP.LIFNR != BLANKInvestigate and cleansePF2/WP2  YES
008MediumMaterial lot-sizing procedure should have the "Splitting quota arrangement" indicator setMARC.AUFTL != BLANK for EQUK.WERKS/MATNR combination in Quota ArrangementInvestigate and cleansePF2/WP2YES
009MediumThere are instances where no procurement plant is specified for an internal Procurement type (E) and Special procurement type (E)

EQUP.BESKZ & EQUP.SOBES = "E" and EQUP.BEWRK IS NULL

Investigate and cleanse if required.PF2/WP2YES
010Medium

There is an opportunity for consolidation/deduplication as:

a. Some start and end dates are congruent

b. Some date ranges are contained within other records

WHERE EQUK.PLANT/EQUK.MATERIAL IS THE SAME

date diff between EQUK.VDATU, EQUK.BDATU for DIFFERENT QUOTA NUMBERS = 0.

OR

WHERE EQUK.PLANT/EQUK.MATERIAL IS THE SAME

EQUK.VDATU, EQUK.BDATU for DIFFERENT QUOTA NUMBERS falls within an existing range.

Investigate and cleanse if required.PF2/WP2YES

RESPONSE FROM JULIE WILLIAMS (PDM-398)

Overlapping dates are validity dates are valid - there may be different quantities in these different date ranges.
For congruent validity dates, I recommend these are flagged to the business at extraction to fix before conversion, to ensure they want to combine the quantities.

 

Deduplication/Rationalization


System WP2: There is an opportunity for the rationalization of records because many Material/Plant combinations found in the system have concurrent date ranges. For example below:

MaterialPlantValid toValid fromQuota arrangementCreated OnCreated ByMin. Qty for Splitting Quota

1034282144/20/201504/01/201596103/12/2015LHOLYOAK0

1034282143/31/201503/01/20159512/13/2015LHOLYOAK0

1034282142/28/201502/09/20159411/28/2015LHOLYOAK0

10342821412/31/201211/01/201289111/15/2012LHOLYOAK0

1034282149/30/201207/01/201287107/12/2012LHOLYOAK0

1034282146/30/20124/16/20128314/16/2012LHOLYOAK0

1034282149/30/201101/01/20117616/29/2011LHOLYOAK0


The above records can also be deduplicated/consolidated into

MaterialPlantValid toValid fromQuota arrangementCreated OnCreated ByMin. Qty for Splitting Quota
1034282144/20/201502/09/2015xxx03/12/2015LHOLYOAK0
10342821412/31/201211/01/2012xxx11/15/2012LHOLYOAK0
1034282149/30/201101/01/2011xxx6/29/2011LHOLYOAK0


There is an opportunity for consolidation/deduplication as:


Quota Arrangements

a. Some start and end dates are congruent and can be merged to for one record with a minimum and maximum validity period. This will also mean a possible merging of quantities.

b. Some date ranges are contained within other records.

Note on Above: Overlapping and congruent dates are deemed to be valid as they may be for different quantities. Its recommended to flag these to the business for their inut.


Source lists

a. Where the same Material/Plant/Vendor/Validity date combination exists - this needs to be indicated and referred to the Business for a decision. This combination will cause a time-out error.

b. Where the same Material/Plant/Validity date combination exists - this needs to be indicated and referred to the Business for a decision. The SAP system will not know which Vendor to assign the record to.

c. Functional team has confirmed that it is valid to have a QA for one vendor only.

Reports will be developed by Syniti to identify these for the business, and cleansing purposes for both Quota Arrangements as well as Source List records.


Count of QA Deduplication/Rationalization (WIP)

PF2: 0

WP2: 91

Source Lists: TBC


Report Frequency

TBC

 

Conversion Process

The high-level process is represented by the diagrams below:


DCT Conversion process.




Data Privacy and Sensitivity

N/A



Extraction

The applicable tables are extracted from the two source systems, as listed below, without any filtering or relevancy criteria. The Tables are staged in the SQL staging environment where reports can be run and ready for relevancy/filtering/cleansing actions.

The extraction tool will be Syniti ADMM and SKP.


Relevancy Criteria for Extraction

Extract Source List data (Valid) - not marked for deletion and validity is not expired.


Extraction Run Sheet (ACTUAL LOGIC) (DONE)

Req #Requirement DescriptionTeam Responsible
001Execute extraction of EQUK table from PF2 to staging environment - with no filteringSyniti Team
002Execute extraction of EQUK table from WP2 to staging environment - with no filteringSyniti Team
003Execute extraction of EQUP table from PF2 to staging environment - with no filteringSyniti Team
004Execute extraction of EQUP table from WP2 to staging environment - with no filteringSyniti Team
005Merge data from 2 systems into a Quota arrangement merged table.Syniti Team
006Execute extraction of EORD table from PF2 to staging environment - with no filteringSyniti Team
007Execute extraction of EORD table from WP2 to staging environment - with no filteringSyniti Team
008Merge data from 2 systems into a Source List merged table.Syniti Team
009Populate SKP Construct pageSyniti Team


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
N/A



















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Quota Arrangement data with exception of some fields which require transformation as mentioned in the transformation rule.

The DCT will consist of Source List records with Quota Arrangement records in a separate (non-editable) view. Fields are editable where business input is required.

Quota Arrangement - DCT Rules

Source TableField NameField DescriptionPopulated fromRuleTooltip Text
EQUKMATNRMaterial NumberEQUK.MATNR and EORD.MATNR and EKPO.MATNR (Contract)CopyMaterial Number
EQUKWERKSPlantEQUK.WERKS and EORD.WERKS and EKPO.WERKS (Contract)CopyPlant
EQUKBDATUQuota arrangement period valid untilEQUK.BDATU and EORD.BDATU and EKKO.KDATE (Contract)CopyEnd date of the Quota arrangement validity period
EQUKVDATUQuota arrangement period valid fromEQUK.VDATU and EORD.VDATU and EKKO.KDATB (Contract)Copy
EQUKQUNUMNumber of quota arrangementSystem GeneratedBlankSystem generated field (legacy data must be included for information)
EQUKERDATDate on which record was createdEQUK.ERDAT and EORD.ERDAT and EKKO.AEDATCopyCreate date of QA record.
EQUKERNAMName of person who created the objectEQUK.ERNAM and EORD.ERNAMCopyName of record creator.
EQUKSCMNGMinimum quantity for splitting quotaBusiness input
Minimum quantity for splitting quota.
EQUKCHANGEDONUTC timestamp when record was changedSystem GeneratedBlankSystem generated field
EQUPQUNUMNumber of quota arrangementSystem GeneratedBlankSystem generated field (legacy data must be included for information)
EQUPQUPOSQuota arrangement item numberSystem GeneratedBlankSystem generated field (legacy data must be included for information)
EQUPBESKZProcurement type

Populate according to rule.

Business input.

F = External procurement

E = Internal procurement

according to the supplier

Default value will be F.

Procurement type: 

F = External procurement

E = Internal procurement

EQUPSOBESSpecial procurement type

Can be populated with the EORD.EORTP (Source list category) but also to be adjusted by Business where they choose.

Business input.

Default value is 0 if not specifically chosen, depending on Procurement Type. For procurement type F = 0 is default. For Procurement type E = E is default.

EORTP (Options)

0 = Standard external procurement

2 = Consignment

Default value is 0 if not specifically chosen, depending on Procurement Type. For procurement type F = 0 is default. For Procurement type E = E is default.


Special procurement type:

0 = Standard external procurement

2 = Consignment

3 = Subcontracting

7 = Stock transfer

E = Standard in-house production

P = Production in plant 2

EQUPLIFNRVendor account numberEQUP.LIFNR and EORD.LIFNR and EKKO.LIFNR (Contract)CopyVendor account number

BEWRKEQUPPlant from which material is procuredEQUP.BEWRK and EORD.RESWK

Copy

Where the Special procurement type = E, the purchasing plant is needed, and/or a vendor and/or a Production version

Plant from which material is procured

EQUPQUOTEQuotaBusiness input
Input the desired quota amount.
EQUPQUBMGBase quantity of quota arrangement itemBusiness inputCan be defaulted to 0.00 for Source List recordsBase quantity of quota arrangement item
EQUPQUMNGAllocated quantity of quota arrangement itemBusiness input
Allocated quantity of quota arrangement item
EQUPMAXMGMaximum quantity of quota arrangement itemBusiness inputCan be defaulted to 0.00 for Source List recordsMaximum quantity of quota arrangement item
EQUPVERIDProduction versionEQUP.VERID and Business InputMDS states that PV is not used, but legacy contains PV values. Where the Special procurement key = E, a PV can be input. For Source list values there are no PV values.Production version: When applicable
EQUPMAXLSMaximum lot size per quota itemBusiness inputCan be defaulted to 0.00 for Source List recordsMaximum lot size per quota item
EQUPMINLSMinimum lot size per quota itemBusiness inputCan be defaulted to 0.00 for Source List recordsMinimum lot size per quota item
EQUPRDPRFRounding profileEQUP.RDPRF and Business input.Blank for Source list values/XREF: old to new rounding profileRounding profile
EQUPKZEINOnce‑only indicatorEQUP.KZEIN and Business input.Business Input
EQUPABRMGMaximum release quantity perEQUP.ABRMG and Business input.

Can be defaulted to 0.000 for Source List records

Maximum release quantity per
EQUPABPERPeriod related to release quantityEQUP.ABPER and Business input.Blank for Source list valuesPeriod related to release quantity
EQUPABANZNumber of periods for release quantityEQUP.ABANZ and Business input.Default to 00Number of periods for release quantity
EQUPPREIHPriority for determination sequenceEQUP.PREIH and Business input.Default to 00Priority for determination sequence
EQUPEMATNManufacturer part number's material numberEQUP.EMATN and Business input.Blank for Source list valuesManufacturer part number's material number
EQUPPLIFZPlanned delivery time in daysEORD.PLIFZ and Business input.Default to 0Planned delivery time in days
EORDInformation fieldAgreement Number

EORD.EBELN - linked to PO and agreement

This is for the business to use in decision making.Agreement Number: For information purposes only
EORDInformation fieldFixed VendorEORD.FLIFNThis is for the business to use in decision making.Fixed Vendor: For information purposes only

Decision Making field

Current logic

  1. One contract - No QA
  2. Rest - QA to be created.
  3. No Source List - TBC

Business cannot amend this field - only use it for a decision.

VALUES: QA / NO QA / TBC (see below for the full decision logic)



Information fieldTo Be Confirmed

Where no Source list exists for an in scope Material/Plant/Vendor combo.
A separate report will be generated for these - included in the CS register

VALUES: X or BLANK


Information fieldContract is available

Indicates whether a contract exists for the Material/Plant/Supplier combination.

VALUES: X or BLANK


Information fieldMaterial Out of Scope

Where the Material is out of scope - for the business' info

VALUES: X or BLANK


Information fieldSupplier Out of Scope

Where the Supplier is out of scope - for the business' info

VALUES: X or BLANK


Decision fieldApproved for Migration (Business decision field - updateable)

X (business can update this field)

Business verify that the record will be migrated


Information field

When a new record is added by the Business (or to the Source List/Contract in source

VALUES: X or BLANK


Comment/Info field

Info/Original Decision



This column will hold the original decision - so as not to lose what the original decision was in case of a change.

Additional Requirements

The way that quota arrangements will be used at Syensqo requires that Contracts will need to be defined before-hand. Contracts and PIR's need to be checked to see whether a Quota Arrangement is needed.

If there is only one contract/PIR, no QA is needed, otherwise if there is more than one, a QA is needed.

Contracts and PIR's will facilitate checking the number of Quota Arrangements to be created/migrated from the Source List data in ECC.


Conditions (Source List)Prepopulated Decision
If there is only 1 Supplier for the Source List Material/Plant then a Quota Arrangement is not required. The record must stay in the SKP report.No QA
If 1 Material/Plant/Supplier with multiple Validity dates then leave the record in the report. The Business needs to choose the record.No QA for the redundant date records. QA for the chosen record
For Material/Plant combination, there is more than 1 Supplier.QA


Conditions (Contract)Prepopulated Decision
Here, records can be added, where it is found that there the Material/Plant/Vendor combination does not exist. There are Validity end-dates for contracts. Some might be blank
The decision logic for Contracts also follows the logic for Source Lists above)
Check Contracts EKKO/EKPO table (BSTYP = K (contract),L(outline agreement)) and check if 1 material Plant combination has more than 1 contract/outline agreement then    
a) check that if material/plant/Vendor combination already exist in DCT then populate 'Contract flag' = X    Use Source List logic for the decision
b) check that if material/plant/Vendor combination does not exist in DCT then add new entry in DCT and mark 'Contract flag' = X    Use Source List logic for the decision
c) If Contract in Source list is Expired then we need report to capture those contracts and share with Business to Cleanse. An additional report is needed. TBC
d) If Supplier or Material is out-of-scope, for a Contract without a validity date. This needs to be in a report to go to business to add the validity date. TBC
"Report should be sorted by material/Plant/ vendor


Please see logic below for more info.

Logic for the business to populate Quota %

  1. i) If more than 1 row (vendors) and both are valid, then the business must give a give % split.
    ii) If one of 2 vendors is 'Primary' then assign 1st = 100% and 2nd= 0%


Extraction Dependencies

Extraction dependencies.

Item #Step DescriptionTeam Responsible
001Source system PF2 - availableSyniti
002Source system WP2 - availableSyniti
003SQL staging area availableSyniti
004SKP Construct page is available and data refreshed.Syniti



Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti ADMM.
  2. Prepare target-ready data in the structure and format that is required for loading the DCT via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation


Value Mappings Register Link (Jira#: PDM-508)

Configuration Mapping Register Link (Jira#: PDM-507)

Link to P2F config drive




Transformation Dependencies

List the steps that need to occur before transformation can commence


Item #Step DescriptionTeam Responsible
1Data has been extracted from sources systemsSyniti
2Data mergedSyniti
3Configuration should be completed - (Config documents should be complete)Syniti
4XREF tables are readyData Team/Syniti



Transformation Run Sheet

Item #Step DescriptionTeam Responsible
1Verify that cross reference tables are availableSyniti/Data Team
2Verify that value mappings tables are availableData Team/Syniti
3Verify that data is extracted and merged.Data Team/Syniti
4Transformation jobs are ready for execution.Syniti

Material lot-sizing procedure should have the "Splitting quota arrangement" indicator set if you want to distribute the planned purchase requisition quantity across multiple sources of supply according to the defined quota arrangement during an MRP run.

This is configured in the Materials Management Customizing under Consumption-Based Planning → Planning → Lot-Size Calculation → Define Lot-Sizing Procedure.

Data Team



Transformation Rules - Source to Target Mapping

HEADER
Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation LogicMapping Rule

PF2/WP2EQUKMANDTClientS4HEQUKMANDTClient
None - Automated

PF2/WP2EQUK/EORDMATNRMaterial NumberS4HEQUKMATNRMaterial NumberXREF - Old to New Material No

Quota Arrangement

Copy/XREF

Source List

Copy/XREF


PF2/WP2EQUK/EORDWERKSPlantS4HEQUKWERKSPlantXREF - Old to New Plant

Quota Arrangement

Copy/XREF

Source List

Copy/XREF


PF2/WP2EQUK/EORDBDATUValid end dateS4HEQUKBDATUValid end date

Quota Arrangement

Copy 

Source List

EORD.BDATU


PF2/WP2EQUK/EORDVDATUValid from dateS4HEQUKVDATUValid from date


Quota Arrangement

Copy 

Source List

EORD.VDATU


PF2/WP2EQUK/EORDQUNUMNumber of quota arrangementS4HEQUKQUNUMNumber of quota arrangement
Automated

PF2/WP2EQUK/EORDERDATDate on which record was createdS4HEQUKERDATDate on which record was created

Quota Arrangement

Copy 

Source List

EORD.ERDAT


PF2/WP2EQUK/EORDERNAMName of person who created the objectS4HEQUKERNAMName of person who created the object

Quota Arrangement

Copy 

Source List

None - Automated


PF2/WP2EQUK/EORDSCMNGMinimum quantity for splitting quotaS4HEQUKSCMNGMinimum quantity for splitting quota

Quota Arrangement

Copy 

Source List

Business Input

Material lot-sizing procedure should have the "Splitting quota arrangement" indicator set if you want to distribute the planned purchase requisition quantity across multiple sources of supply according to the defined quota arrangement during an MRP run.

This is configured in the Materials Management Customizing under Consumption-Based Planning → Planning → Lot-Size Calculation → Define Lot-Sizing Procedure.


PF2/WP2EQUK/EORDCHANGEDONUTC timestamp when record was changedS4HEQUKCHANGEDONUTC timestamp when record was changed
None - Automated
ITEM
Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation LogicMapping Rule

PF2/WP2EQUPMANDTClientS4HEQUPMANDTClient
None - Automated

PF2/WP2EQUP/EORDQUNUMNumber of quota arrangementS4HEQUPQUNUMNumber of quota arrangement
None - Automated

PF2/WP2EQUP/EORDQUPOSQuota arrangement item numberS4HEQUPQUPOSQuota arrangement item number
None - Automated

PF2/WP2EQUPBESKZProcurement typeS4HEQUPBESKZProcurement type

Current Quota Arrangement data

Copy 

Current Source List

F = External procurement

E = Internal procurement

according to the supplier

Default value will be F.


PF2/WP2EQUP/EORDSOBES/EORTPSpecial procurement typeS4HEQUPSOBESSpecial procurement type

Quota Arrangement

Copy 

Source List

Default value is 0 if not specifically chosen, depending on Procurement Type. For procurement type F = 0 is default. For Procurement type E = E is default.

SOBES (options)

0 = Standard external procurement

2 = Consignment

3 = Subcontracting

7 = Stock transfer

E = Standard in-house production

P = Production in plant 2

EORTP (Options)

0 = Standard external procurement

2 = Consignment


PF2/WP2EQUP/EORDLIFNRVendor account numberS4HEQUPLIFNRVendor account numberXREF old to new Supplier

Quota Arrangement

Copy/XREF

Source List

Copy/XREF


PF2/WP2EQUPBEWRKPlant from which material is procuredS4HEQUPBEWRKPlant from which material is procuredXREF old to new Plant

Quota Arrangement

Copy/XREF

Source List

Copy/XREF


PF2/WP2EQUPQUOTEQuotaS4HEQUPQUOTEQuota

Quota Arrangement

Copy

Source List

Business Input


PF2/WP2EQUPQUBMGBase quantity of quota arrangement itemS4HEQUPQUBMGBase quantity of quota arrangement item

Quota Arrangement

Copy

Source List

Can be defaulted to 0.00 for Source List records


PF2/WP2EQUPQUMNGAllocated quantity of quota arrangement itemS4HEQUPQUMNGAllocated quantity of quota arrangement item

Quota Arrangement

Copy

Source List

Business Input


PF2/WP2EQUPMAXMGMaximum quantity of quota arrangement itemS4HEQUPMAXMGMaximum quantity of quota arrangement item

Quota Arrangement

Copy

Source List

Can be defaulted to 0.00 for Source List records


PF2/WP2EQUPVERIDProduction versionS4HEQUPVERIDProduction versionXREF: old to new production version id (when applicable)

Quota Arrangement

Copy/XREF

Source List

Where the Special procurement type = E, the purchasing plant is needed, and/or a vendor and/or a Production version


PF2/WP2EQUPMAXLSMaximum lot size per quota itemS4HEQUPMAXLSMaximum lot size per quota item

Quota Arrangement

Copy

Source List

Can be defaulted to 0.00 for Source List records


PF2/WP2EQUPMINLSMinimum lot size per quota itemS4HEQUPMINLSMinimum lot size per quota item

Quota Arrangement

Copy

Source List

Can be defaulted to 0.00 for Source List records


PF2/WP2EQUPRDPRFRounding profileS4HEQUPRDPRFRounding profile

Quota Arrangement

Copy/XREF

Source List

Blank for Source list values


PF2/WP2EQUPKZEINOnce‑only indicatorS4HEQUPKZEINOnce‑only indicator

Quota Arrangement

Copy

Source List

Blank for Source list values

PF2/WP2EQUPABRMGMaximum release quantity per periodS4HEQUPABRMGMaximum release quantity per period

Quota Arrangement

Copy

Source List

Can be defaulted to 0.00 for Source List records


PF2/WP2EQUPABPERPeriod related to release quantityS4HEQUPABPERPeriod related to release quantity

Quota Arrangement

Copy

Source List

Blank for Source list values


PF2/WP2EQUPABANZNumber of periods for release quantityS4HEQUPABANZNumber of periods for release quantity

Quota Arrangement

Copy

Source List

Default to 00


PF2/WP2EQUPPREIHPriority for determination sequenceS4HEQUPPREIHPriority for determination sequence

Quota Arrangement

Copy

Source List

Default to 00


PF2/WP2EQUPEMATNManufacturer part number's material numberS4HEQUPEMATNManufacturer part number's material number

Quota Arrangement

Copy

Source List

Blank for Source list values


PF2/WP2EQUPPLIFZPlanned delivery time in daysS4HEQUPPLIFZPlanned delivery time in days

Quota Arrangement

Copy

Source List

Default to 0

 

MAPPING TABLES

Mapping Table NameMapping Table Description
MaterialXREF
PlantXREF
SupplierXREF
Production versionXREF
Procurement PlantXREF
Rounding profileXREF
Special Procurement TypeDropdown/XREF


Transformation Dependencies

Item #Step DescriptionTeam Responsible
1PV - Production version settings and data is migrated into the target system (if PV's are being used)Data Team/Syniti
2Materials - Check that settings and data is migrated into the target systemData Team/Syniti
3Supplier - Check that settings and data is migrated into the target systemData Team/Syniti
4

Material lot-sizing procedure should have the "Splitting quota arrangement" indicator set if you want to distribute the planned purchase requisition quantity across multiple sources of supply according to the defined quota arrangement during an MRP run.

Data Team/Functional



Pre-Load Validation

Project Team

Completeness

TaskAction

Verify count

The number of records presented after relevancy checks and validation needs to be correct compared to the staged data in dspMigrate

Completeness check

All fields required as per mapping template rules must be completed. Validity reports checking each field in Syniti must be built.


Accuracy

TaskAction

Conversion accuracy

Data team to verify that the data staged in the preload tables are correct in terms of the mapping rules. This will be done via Syniti DSP reports.

Valid to datesCheck valid to dates are migrated correctly
Valid from datesCheck valid from dates are migrated correctly
Valid to and from datesVerify date formats YYYYMMDD

Business

Completeness

TaskAction

Count and Completeness check

All fields required as per mapping template rules must be completed. Validity reports checking each field in ADMM must be built to help check.


Accuracy

TaskAction

Conversion accuracy

Business team to verify that the data staged in the preload tables are correct in terms of the mapping rules. This will be done via Syniti ADMM reports/SAP reports

Valid to datesCheck valid to dates are migrated correctly
Valid from datesCheck valid from dates are migrated correctly
Valid to and from datesVerify date formats YYYYMMDD


Load

The load process includes:

  1. This load will take place either via DCT template upload or a Migration Cockpit upload program.
  2. Staging Tables or Source Files will be handled by Syniti.


Load will occur in mock and production phases, with logs captured and reviewed for consistency, completeness, and errors.


Load Run Sheet


Item #Step DescriptionTeam Responsible
1Verify data extractedData Team/Functional - S2P
2Verify data mergedData Team/Functional - S2P
3Verify XREF's are readyData Team/Functional - S2P
4Verify reference data is in the systemData Team/Functional - S2P
5Verify Config is in the systemData Team/Functional - S2P
6Verify other necessary data has been loaded int he system (Plant, Material, Vendor, Company Code...)Data Team/Functional - S2P
7Release - Load signoff and go-ahead by Functional/Data OwnerFunctional/Data Owner - S2P
8Approval to stage/Pre-stage stepsFunctional/Data Owner - S2P
9Cross references/Value mappings imported into environmentSyniti
10Extraction from sourceSyniti
11Extraction from S4 where neededSyniti
12Stage data for transformationsSyniti
13Run transformsSyniti
14Create DCT template for upload and populate the SKP Construct pageSyniti
15Provide access to Business to view the Construct page Syniti
16Populate required data in SKP Construct pageData Team/Syniti
17Execute pre-load reportSyniti
18Validate preload report - releaseSyniti
19Prepare and simulateSyniti
20Pre-load verification and approval to loadFunctional/Data Owner - S2P
21

Load to S4

Syniti
22Complete Jira steps, Volumes and TimingsAll - where applicable
23Execute post-load reportSyniti
24Post-load report verification/validationData Team/Functional/Data Owner - S2P
25Object load completion approvalData Owner - S2P




  

Load Phase and Dependencies

Configuration

Item #Configuration ItemTeam Responsible
1Number ranges configured (QUNUM) Functional/Data
2Procurement Type (BESKZ)Functional/Data
3Special Procurement Type (EQUP.SOBES) (SOBES & SOBSL fields are from SAP table T460AFunctional/Data

4Period to which the release quantity relates (ABPER)Functional/Data
5Check value mappings are availableData
6MM - Purchase info record settings and data is migrated into the target system (MARA)Data
7PV - Production version settings and data is migrated into the target system (if PV's are being used) (MKAL)Data
8Supplier - Check that data is migrated into the target system (LFA1)Data
9Rounding Profile is loaded (RDPR)Functional/Data
10Plants - Check that this is loaded in target system (WERKS) - T001WData
11Material lot-sizing procedure should have the "Splitting quota arrangement" indicator set if you want to distribute the planned purchase requisition quantity across multiple sources of supply according to the defined quota arrangement during an MRP run.Functional/Data


Conversion Objects

Object #Preceding Object Conversion Approach
1Purchase Info Record/Pricing Conditions (1094)
2Material Master - Basic View (2019)
3Materials - Additional data (2021)
4Materials Purchasing View (2020)
5Business Partners - General (3007)
6Business Partners (Vendor)- Intercompany (3027)
7Purchase Contracts (9040)??


Error Handling

Error TypeError DescriptionAction Taken
DataVendor blocked for the material in the Source List - no source determinedEither exclude the Quota record, or unblock the Vendor
ConfigQuota number ranges not correctInternal numbering must be set.
DataIncorrect quota arrangement valuesFix incorrect data or missing entries
DataMissing quota base quantitiesFix incorrect data or missing entries
DataIncorrect allocated quantitiesFix incorrect data or missing entries
DataMissing material master purchasing view settings.Fix incorrect data or missing entries
LoadCannot use LSMW with a simple BDC recording for a multi-line item scenario

Ensure the LSMW is built correctly, using a BAPI

DataInvalid datesFix incorrect data or missing entries
DataInvalid data formatsFix incorrect data or missing entries
Pre-reqMissing Value mappingsAdd missing value mappings and retry
DataDuplicatesFix incorrect data or missing entries
DataTransformation missesBuild transformation and retry.
LoadAuthorization errorsApply for the applicable authorization permission and retry
LoadTechnical load failures - If using MC - Simulation errors, etcInvestigate error and rectify. Retry simulation and/or load


Exceptions

What exceptions and actions for them will occur.

Error TypeError DescriptionAction Taken
TBC








Post-Load Validation

Project Team


POST-LOAD STEP

Item #Step DescriptionTeam Responsible
1Execute post-load reportDeveloper - Syniti or Data Specialist - S2P
2Post-load report verification/validationData Specialist/Functional/Data Owner - S2P
3Object load completion approvalData Owner - S2P




Completeness

TaskAction

Verify count

The number of records presented in the preload needs to be compared to the postload. – Syniti report

Field by field checkCompare source data to target data.

Accuracy

TaskAction

Conversion accuracy

Data team to verify that the data staged in the preload tables are correct in terms of the mapping rules. This will be done via Syniti reports/SAP reports

Valid to datesCheck valid to dates are migrated correctly
Valid from datesCheck valid from dates are migrated correctly
Valid to and from datesVerify date formats YYYYMMDD
Quota quantityVerify the quota quantities are correctly migrated

Business

Completeness

TaskAction

Verify count

The number of records presented in the preload needs to be compared to the postload. – Syniti report

Missing dataCheck missing data which was supposed to be loaded
ReconciliationParticipate in Post-load walkthroughs

Accuracy

TaskAction

Conversion accuracy

Business team to verify that the data staged in the preload tables are correct in terms of the mapping rules. This will be done via Syniti reports/SAP reports

Load failuresValue presented for load must be in the system
Valid to datesCheck valid to dates are migrated correctly
Valid from datesCheck valid from dates are migrated correctly
Valid to and from datesVerify date formats YYYYMMDD
Quota quantityVerify the quota quantities are correctly migrated




Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.

Additional Info

Data Governance Rules (from MDS)

These governance rules apply to the object overall. They relate to the creation, blocking or deletion, or duplicate checks that must be applied.
Rule #ActivityRule descriptionValidation Method
1Create1) When Syensqo has multiple suppliers providing the same key supplies, Quota Arrangements should be utilized to automate the distribution of work, eliminating the need for manual intervention. This approach minimizes the risk of excessive dependence on a single vulnerable supplier. Quota arrangements are manually created within the S/4 Hana system.
2) A distinct quota arrangement must be established for each specific combination of material and plant.
3) The quota arrangement could be based on contract and / or purchase info records created with supplier.
4) When purchase requisitions are created manually or automatically for these materials, the system selects a supplier according to the predefined quota arrangement. This arrangement is valid for a specific time period and, once expired, will no longer be used to determine the source.

2CreateQuota arrangements are always created against material and plant combination
4ChangeQuota arrangements can be changed via S/4 Hana system adopted at Syensqo.

Scenarios at Syensqo which trigger updating of Quota arrangement master data:
1) New supplier is identified for the material which needs to be added in the Quota arrangement
2) Contract with the supplier against particular material is renewed for new validity period. Quota arrangement needs to be aligned with the new validity period.
3) Contract with the supplier against particular material is expired and/or new contract is created with separate supplier. Quota arrangement needs to be updated to add new supplier and period.
4) Purchase Info Record with the supplier against particular material is renewed for new validity period. Quota arrangement needs to be aligned with the new validity period.
5) Purchase Info Record with the supplier against particular material is expired and/or new Purchase info record is created with separate supplier. Quota arrangement needs to be updated to add new supplier and period.

5DeletionIf the quota arrangement is no longer required, the quota arrangement validity period can be reduced to past data and allocated quantity/quota can be reduced to zero via the S/4 HANA system adopted at Syensqo.

See also

Change log

Version Published Changed By Comment
CURRENT (v. 114) Apr 29, 2026 06:54 SICONOLFI-ext, Michael
v. 142 Apr 22, 2026 13:17 SICONOLFI-ext, Michael
v. 141 Apr 20, 2026 13:07 SICONOLFI-ext, Michael
v. 140 Mar 13, 2026 07:13 SICONOLFI-ext, Michael
v. 139 Mar 13, 2026 06:48 MADHOK-ext, Jasleen
v. 138 Mar 12, 2026 19:26 MADHOK-ext, Jasleen
v. 137 Mar 12, 2026 18:56 MADHOK-ext, Jasleen
v. 136 Mar 12, 2026 18:49 MADHOK-ext, Jasleen
v. 135 Mar 12, 2026 18:43 MADHOK-ext, Jasleen
v. 134 Mar 12, 2026 12:56 SICONOLFI-ext, Michael

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels