You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Current »

Status

  Revision in Progress

OwnerCASTRO MONCAYO-ext, Jose Luis 
Stakeholders

Purpose

The purpose of this document is to define the conversion approach to create in S/4 HANA.


Conversion Scope

Material Master - PPDS Views are now used to make some of the Planning activities in both systems (PF2 & WP2). Most of the materials used in the planning process have these views updated, as they contain relevant information about the planning process. The aim is to get the conversion into S4 HANA in a standard way, so it can be used in the new planning processes already defined by the functional team and validated with the business.

While PF2 and WP2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design. As this is a new view a complete new DCT will be needed, as NO migration data on Scope.

We need to create a NEW Layout to fill in for the new data per material / Plant combination

The data from legacy system may include:

  1. As per materials, the rule for this view will follow the rules for the CNV-2019 CNV-2019 Materials - Basic Data View 

  2. All materials with Procurement E, MRP Type X0 and has a record in MKAL should be suitable for having the PPDS view.
  3. As per definition, NO planning process in S4 HANA, however, materials should be Scheduled in PPDS, but for this process NO relevant data in the Material Master. Just Configuration Values in Customizing. The Values to create PPDS view are 2 field only. We can evaluate to populate them after the Material/Plant combination is already done, so we can have the total records to be included here.

The data from legacy system excludes:

  1. All materials flagged for deletion
  2. Any blocked or obsolete materials
  3. Any inactive materials that are out of scope



The data from legacy system includes:

  1. PF2 (ROW & CN)
  2. WP2 (ROW & CN)

The data from legacy system excludes:

  1. This Conversion Specification does not include the WPX system (CUI Objects).
List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2All planning materials15,000S4 HANATBD
WP2All Planning materials30,000S4 HANATBD

N/A







Additional Information

Multi-language Requirement

System Multi-language standard definition

Document Management

N/A

Legal Requirement

N/A

Special Requirements

N/A

N/A




Target Design

Fields in Scope for PPDS view

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
MARAMATNRMATNRMaterial NumberCHAR18R
T001WWERKSWERKSPlant IDCHAR4R
MARAMEINSMEINSUnit of measure in which stock of the material is managed.UNIT3R
MARAPPSKZPPSKZIndicator for Advanced PlanningCHAR1C
MARCSCM_RRP_TYPE

/SAPAPO/PPS_PLANNING_TYPE

PP Planning ProcedureCHAR1C


Data Cleansing

No Data to clean as this is a new view in the Materials

IDCriticalityError Message/Report DescriptionRuleOutputSource System


N/A






















Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible













Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created forCNV-2006 Materials PPDS view data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule / Tooltip
MATNRMaterial NumberNumber ID that identifies a material in the system
WERKSPlant IDNumber ID that identifies a organizational unit where manufacturing activities are carried out
MEINSUnit of measure in which stock of the material is managed.Base Unit of Measure
PPSKZIndicator for Advanced PlanningSupports advanced live Cache-based planning and scheduling. Only an X is a valid value.
SCM_RRP_TYPEPP Planning Procedure

Defines for each planning-relevant event that can occur for a location product, which action is executed by Production Planning and Detailed Scheduling (PP/DS) in SAP S/4 HANA if this event occurs.

Value 2 or 4 are valid

Extraction Dependencies

No extraction of DATA as this is a new view in the Material Master

Item #Step DescriptionTeam Responsible

N/A










Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible
1Prepare Load files with the necessary rules and including the value mapping. Sinity / MFG Team
2Create the DCT file according to the Loading template in Sinity tool, else with the "Migrate your Data" tool in S4/HANASinity / MFG Team
3Validate the loading with the Business as per GBU reportsMFG Data Team




Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
CNV-1N/AMARAMATNRMaterial NumberS4 HANAMARAMATNRMaterial NumberCOPY - MARA-MATNR
CNV-2N/AT001WWERKSPlant IDS4 HANAT001WWERKSPlant IDCOPY T001W-WERKS
CNV-3N/AMARAMEINSUnit of measure in which stock of the material is managed.S4 HANAMARAMEINSUnit of measure in which stock of the material is managed.COPY MARA-MEINS
CNV-4N/AMARAPPSKZIndicator for Advanced PlanningS4 HANAMARAPPSKZIndicator for Advanced PlanningDCT
CNV-6N/AMARCSCM_RRP_TYPEPP Planning ProcedureS4 HANAMARCSCM_RRP_TYPEPP Planning ProcedureDCT


Transformation Mapping

N/A
Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1DCT is built and testedSinity/Data Team
2Data Transformation load files need to be validated by the business at GBU levelBusiness Data Owners
3All Value mapping tables needs to be finishedSinity/MFG Data Team
4All Data dependencies has to be finished. Any delay can bring delays on thisAll


Pre-Load Validation

Project Team

Completeness

TaskAction
Business Validates the load fileSend the Load file to the Business Representatives for all plants, so the can validate the data
Mock 1 test needs to happen before1st Mock load (manual) can occur first and before the load can occur
Count before and afterReview the items as count before the load in the Transformation files and check it after

Accuracy

TaskAction
Record ErrorsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.

Business

Completeness

TaskAction
To check Data Accuracy checking count of records to load and loadedBusiness Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets.
Count before and afterReview the items as count before the load in the Transformation files and check it after



Accuracy

TaskAction
Data owners to grant that the records in the load files are okay and according with the rules and mappingsTo check and validate the load files with all the transformation and mapping rules, to be signed off.





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible
1Go to load file and pick 5 data registers, load manually without any tool. See what happens. If all okay, proceed with the next step.MFG Data Team
2Go to load file and pick 10 records and load them with the tool. No action if the previous step has fallen. If not, then continue to load 10 records with the tool. Check if everything went okay.MFG Data Team
3Proceed with the full load if steps one and two were succeed. MFG Data Team
4Validate few records loaded by accessing standard transactions from S/4HNA eg. MM03MFG Data Team

Generate post load report if step 5 is validatedMFG Data Team


Load Phase and Dependencies

Configuration

Item #Configuration Item
1- Pre CutoverPlant Planning Parameters
2- Pre CutoverPlant & Storage location parameters
3 - Pre CutoverMaterial Types configuration
4 - Pre CutoverValuation Class Configuration
5 - Pre CutoverMRP Groups Configuration
6- Pre cutoverMRP Controllers Configuration
7- Pre CutoverAvailability check Configuration
8- Pre CutoverPurchasing Groups Configuration
9- Pre CutoverAll configurations and Setup of PPDS embedded solution 

Conversion Objects

Object #Preceding Object Conversion Approach
2019 Materials - Basic View
2020 Materials - Purchasing View
2010Materials - General Plant Data / S. Location Data

Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction
Check Data Records countCount and check how many records were loaded vs. Records in the load file (Each mock has it's own data record count)





Accuracy

TaskAction
Check Data loading tool logCheck whether after the loading process, any logs from the tool, to verify them and take actions





Business

Completeness

TaskAction
Check Data load register countDownload Post Load Reports from The Tool and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.





Accuracy

TaskAction
Check Error log from the loading toolCheck whether after the loading process, any logs from the tool, to verify them and take actions





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 6) Feb 24, 2026 08:32 CASTRO MONCAYO-ext, Jose Luis
v. 6 Nov 27, 2025 10:04 CASTRO MONCAYO-ext, Jose Luis
v. 5 Nov 18, 2025 15:42 CASTRO MONCAYO-ext, Jose Luis
v. 4 Nov 14, 2025 11:33 CASTRO MONCAYO-ext, Jose Luis
v. 3 Oct 30, 2025 09:54 CASTRO MONCAYO-ext, Jose Luis
v. 2 Oct 30, 2025 09:25 CASTRO MONCAYO-ext, Jose Luis
v. 1 Aug 04, 2025 23:26 CASTRO MONCAYO-ext, Jose Luis

  • No labels