Purpose
The purpose of this document is to define the conversion approach to create Work Order in S/4 HANA.
A Work Order in SAP PM is a technical and financial document used to plan, execute, and settle maintenance tasks on technical objects. It acts as a detailed instruction, outlining tasks, required resources, parts, and schedules, while tracking costs, technical history, and compliance.
Legacy Plant Maintenance Work order is using a diverse range of formats across the different systems. As per SyWay design, EAM Maintenance Work order will be standardized.
Conversion Scope
The scope of this document covers the approach for converting active Work Order from Legacy Source Systems into S/4HANA.
A work order in SAP is a formal document that authorises and tracks maintenance, repair, or production tasks within an organisation, containing essential details for effective task management. It is used to manage and document various tasks, including maintenance, repairs, and production activities. Key components of a work order include:
- Work Description: Specific details of the task to be carried out
- Equipment Details: Information about the asset or machinery requiring attention
- Resources: Assignment of personnel, tools, and materials needed for task completion
- Dates: Scheduled start and finish dates to manage timelines
- Costing: Estimates for labour, materials, and other expenditures linked to budget accounts
- Priority & Status: Indicates urgency and tracks progress (e.g., created, released, completed, closed)
- Operations: Step-by-step instructions or tasks within the work order.
The data from legacy system includes:
- All open Work Orders (AUFK-AUFNR) with System Status (JEST-STAT) = Created (CRTD) or Released (REL).
- Work Orders (AUFK-AUFNR) with System Status (JEST-STAT) = Technically Completed (TECO) and relevant open Purchase Order (EKKN-EBELN) as defined in CNV-9045 Open Purchase Orders
- Work Orders with Maintenance Plant (IFLOT-WERKS) existing in Value Mapping: Plant (Maintenance Plant = Yes).
- Work Orders assigned to active legacy Functional Locations (IFLOT-TPLR) ** (System Status TJ02T-TXT04 <> INAC) or Equipment (EQUI-EQUNR)
- Work Orders generated from Maintenance Plan with Basic Start Date (AFKO-GSTRP) <= Business Continuity Date
- A. Work Orders with no open PO, with Basic Start Date (AFKO-GSTRP) later than X Period prior of the Migration / "Go-Live" Date (OTH_Migration_Date Relevant Values A2D (using Object ID "9005" and Field Name = "AFKO-GSTRP") - OTH_Migration_Date Relevant Values A2D (using Object ID "9005" and Field Name = "AFKO-GSTRP_PERIOD"))
B. Work Orders with no open PO, with Basic End Date (AFKO-GLTRP) later than X Period prior of the Migration / "Go-Live" Date (OTH_Migration_Date Relevant Values A2D (using Object ID "9005" and Field Name = "AFKO-GLTRP") - OTH_Migration_Date Relevant Values A2D (using Object ID "9005" and Field Name = "AFKO-GLTRP_PERIOD"))
C. Work Orders with open PO, regardless of Basic Start (AFKO-GSTRP)/ Finish Date (AFKO-GLTRP)
The data from legacy system excludes:
- Work Orders with System Status (JEST-STAT) = Technically Completed (TECO) that do not meet Inclusion Criteria #2
- Work Orders with System Status (JEST-STAT) = Deletion Flag (DLFL) status
- Work Orders with System Status (JEST-STAT) = Closed (CLSD) status
- Work Orders with System Status (JEST-STAT) = Not Completed/ Do Not Execute (NCMP) status
- Standing Work Orders (Value Mapping: Work Order Type, where Target WO Type = 'YA05').
- Work Orders (AUFK-AUFNR) which are Sub-orders (AFKO-MAUFNR <> '')
- Work Orders with blank Basic End Date (AFKO-GLTRP)
- Work Orders with Order type maintained in Work Order Type Exclusion List (EXC-Work Order Type)
- Work Orders with System Status (JEST-STAT) <> (TECO/ DLFL/ CLSD/ NCMP) and with a User Status maintained in the User Status Exclusion List (EXC-Work Order User Status)
List of Tables to extract for this object is maintained here: Extract Table Register.
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
PF2, WP2 | Relevant Work Orders will be extracted from PF2 and WP2 | 70,000 | S/4HANA | 70,000 |
DCT | Work Orders for plants which do not have data existing from PF2 and WP2 | TBD | S/4HANA | TBD |
Additional Information
Multi-language Requirement
Work Order does not have multi language support. Work Order text will be migrated using EN logon.
Multi language is supported for Work Order Long Text. Login via a different language will have its Long Text displayed in the logon language if the language key is maintained in the Work Order.
Document Management
Refer to the KDD085 - Document Management in the SyWay Solution
Note: Documents attached to Equipment will be migrated as part of 9104-EAM Attachments.
Legal Requirement
Not Applicable
Special Requirements
Not Applicable
Target Design
The technical design of the target for this conversion approach.
1. Work Order Header
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| AUFK | AUFNR | AUFNR | Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AUFK | AUART | AUART | Order Type | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AUFK | KTEXT | KTEXT | Description | CHAR | 40 | Mandatory | Mandatory | Mandatory |
| AFIH | PRIOK | PRIOK | Priority | CHAR | 80 | Mandatory | Mandatory | Mandatory |
| AFKO | GSTRP | GSTRP | Basic Start Date | DATS | 8 | Mandatory | Mandatory | Mandatory |
| AFKO | GSUZP | GSUZP | Basic Start Time | TIMS | 6 | Mandatory | Mandatory | Mandatory |
| AFKO | GLTRP | GLTRP | Basic Finish Date | DATS | 8 | Mandatory | Mandatory | Mandatory |
| AFKO | GLUZP | GLUZP | Basic Finish Time | TIMS | 6 | Mandatory | Mandatory | Mandatory |
| IFLOT | TPLNR | TPLNR | Functional Location | CHAR | 30 | Mandatory | Mandatory | Mandatory |
| AFIH | EQUNR | EQUNR | Equipment | CHAR | 18 | Conditional | Conditional | Conditional |
| AFIH | BAUTL | BAUTL | Assembly | CHAR | 18 | Conditional | Conditional | Conditional |
| AFIH | QMNUM | QMNUM | Assigned Notification | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AFIH | REVNR | REVNR | Maintenance Event/ Revision | CHAR | 8 | Conditional | Conditional | Conditional |
| AFIH | ILART | ILART | Maintenance Activity Type | CHAR | 3 | Mandatory | Mandatory | Mandatory |
| CRHD | ARBPL | ARBPL | Work Center | CHAR | 8 | Mandatory | Mandatory | Mandatory |
| CRHD | WERKS | WERKS | Work Center Plant | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AFIH | IWERK | IWERK | Planning Plant | CHAR | 80 | Mandatory | Mandatory | Mandatory |
| AFIH | INGPR | INGPR | Planner Group | CHAR | 80 | Mandatory | Mandatory | Mandatory |
| AUFK | WERKS | WERKS | Maintenance Plant | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| ILOA | BEBER | BEBER | Plant Section | CHAR | 3 | Mandatory | Mandatory | Mandatory |
| ILOA | BUKRS | BUKRS | Company Code | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| ILOA | PROID | PROID | WBS Element (Acc Assignment) | CHAR | 8 | Conditional | Conditional | Conditional |
| ILOA | KOSTL | KOSTL | Cost Center | CHAR | 10 | Mandatory | Mandatory | Conditional |
2. Work Order Operation Data
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| AFVC | AUFNR | AUFNR | Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AFVC | VORNR | VORNR | Operation Number | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AFVC | LTXA1 | LTXA1 | Operation Description | CHAR | 40 | Mandatory | Mandatory | Mandatory |
| CRHD | ARBPL | ARBPL | Work Center | CHAR | 8 | Mandatory | Mandatory | Mandatory |
| CRHD | WERKS | WERKS | Work Center Plant | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AFVC | PERNR | PERNR | Person Responsible | CHAR | 8 | Conditional | Conditional | Conditional |
| AFVC | STEUS | STEUS | Control Key | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AFVC | SAKTO | SAKTO | Cost Element | CHAR | 10 | Conditional | Conditional | Conditional |
| AFVC | EKORG | EKORG | Purchasing Organisation | CHAR | 4 | Conditional | Conditional | Conditional |
| AFVC | EKGRP | EKGRP | Purchasing Group | CHAR | 3 | Conditional | Conditional | Conditional |
| AFVC | MATKL | MATKL | Material Group | CHAR | 9 | Conditional | Conditional | Conditional |
| AFVC | ANLZU | ANLZU | System Condition | CHAR | 1 | Conditional | Conditional | Conditional |
| AFVC | LARNT | LARNT | Activity Type | CHAR | 6 | Conditional | Conditional | Conditional |
| AFVV | ARBEI | ARBEI | Work | NUMC | 7 | Mandatory | Mandatory | Mandatory |
| AFVV | ARBEH | ARBEH | Work Unit | CHAR | 3 | Mandatory | Mandatory | Mandatory |
| AFVC | INDET | INDET | Calculation Key | CHAR | 1 | Mandatory | Mandatory | Mandatory |
| AFVV | DAUNO | DAUNO | Duration | NUMC | 5 | Mandatory | Mandatory | Mandatory |
| AFVV | DAUNE | DAUNE | Duration Unit | CHAR | 3 | Mandatory | Mandatory | Mandatory |
| AFVC | ANZZL | ANZZL | Required Capacities | NUMC | 3 | Mandatory | Mandatory | Mandatory |
| AFVV | EINSA | EINSA | Start Constraint | CHAR | 1 | Conditional | Conditional | Conditional |
| AFVV | NTANF | NTANF | Start Constraint Date | DATS | 8 | Conditional | Conditional | Conditional |
| AFVV | NTANZ | NTANZ | Start Constraint Time | TIMS | 6 | Conditional | Conditional | Conditional |
| AFVV | EINSE | EINSE | Finish Constraint | CHAR | 1 | Conditional | Conditional | Conditional |
| AFVV | NTEND | NTEND | Finish Constraint Date | DATS | 8 | Conditional | Conditional | Conditional |
| AFVV | NTENZ | NTENZ | Finish Constraint Time | TIMS | 6 | Conditional | Conditional | Conditional |
| AFVV | MGVRG | MGVRG | Operation Quantity | NUMC | 13 | Conditional | Conditional | Conditional |
| AFVV | MEINH | MEINH | Operation Quantity Unit | CHAR | 3 | Conditional | Conditional | Conditional |
| AFVC | PREIS | PREIS | Price | CHAR | 11 | Conditional | Conditional | Conditional |
| AFVC | WAERS | WAERS | Currency | CHAR | 5 | Conditional | Conditional | Conditional |
| AFVC | PEINH | PEINH | Price Unit | NUMC | 5 | Conditional | Conditional | Conditional |
| AFVC | LIFNR | LIFNR | Vendor | CHAR | 10 | Conditional | Conditional | Conditional |
| AFVC | WEMPF | WEMPF | Recipient | CHAR | 12 | Conditional | Conditional | Conditional |
| AFVC | BEDNR | BEDNR | Tracking Number | CHAR | 10 | Conditional | Conditional | Conditional |
| AFVC | SORTL | SORTL | Sort Term | CHAR | 10 | Conditional | Conditional | Conditional |
| AFVC | INFNR | INFNR | Purchasing Info Record | CHAR | 10 | Conditional | Conditional | Conditional |
| AFVC | AFNAM | AFNAM | Name of Requisitioner | CHAR | 12 | Conditional | Conditional | Conditional |
| AFVC | ABLAD | ABLAD | Unloading Point | CHAR | 25 | Conditional | Conditional | Conditional |
| AFVV | PLIFZ | PLIFZ | Planned Delivery Time - Day | NUMC | 3 | Conditional | Conditional | Conditional |
| IMTORDOPSOPR | MAINTORDOPERATION ISMRPRELEVANT | MAINTORDOPERATION ISMRPRELEVANT | Reservation Relevance / Generation of Purchase Requisition | CHAR | 1 | Conditional | Conditional | Conditional |
3. Work Order Operation Components
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| AFVC | AUFNR | AUFNR | Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AFVC | VORNR | VORNR | Operation Number | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| RESB | POSNR | POSNR | Item Number of Reservation | NUMC | 4 | Mandatory | Mandatory | Mandatory |
| RESB | MATNR | MATNR | Material | CHAR | 18 | Conditional | Conditional | Conditional |
| RESB | POTX1 | POTX1 | Description | CHAR | 40 | System | System | System |
| RESB | POSTP | POSTP | Item Category | CHAR | 1 | Mandatory | Mandatory | Mandatory |
| RESB | BDMNG | BDMNG | Requirement Quantity | NUMC | 13 | Mandatory | Mandatory | Mandatory |
| RESB | MEINS | MEINS | Unit | CHAR | 3 | Mandatory | Mandatory | Mandatory |
| RESB | NO_DISP | NO_DISP | Reservation Relevance / Generation of Purchase Requisition | CHAR | 1 | Conditional | Conditional | Conditional |
| RESB | WERKS | WERKS | Plant | CHAR | 4 | Conditional | Conditional | Conditional |
| RESB | BDTER | BDTER | Requirements Date | DATS | 8 | Conditional | Conditional | Conditional |
| RESB | LGORT | LGORT | Storage Location | CHAR | 4 | Conditional | Conditional | Conditional |
| RESB | CHARG | CHARG | Batch | CHAR | 10 | Conditional | Conditional | Conditional |
| RESB | GPREIS | GPREIS | Price | NUMC | 15 | Conditional | Conditional | Conditional |
| RESB | PEINH | PEINH | Price Unit | NUMC | 5 | Conditional | Conditional | Conditional |
| RESB | WAERS | WAERS | Currency | CHAR | 15 | Conditional | Conditional | Conditional |
| RSADD | EKORG | EKORG | Purchasing Organization | CHAR | 4 | Conditional | Conditional | Conditional |
| RESB | EKGRP | EKGRP | Purchasing Group | CHAR | 3 | Conditional | Conditional | Conditional |
| RESB | LIFNR | LIFNR | Supplier | CHAR | 10 | Conditional | Conditional | Conditional |
| RESB | INFNR | INFNR | Purchasing Info Record | CHAR | 10 | Conditional | Conditional | Conditional |
| RESB | MATKL | MATKL | Material Group | CHAR | 9 | Conditional | Conditional | Conditional |
| RESB | SAKNR | SAKNR | G/L Account | CHAR | 10 | Conditional | Conditional | Conditional |
| RESB | WEMPF | WEMPF | Goods Recipient | CHAR | 12 | Conditional | Conditional | Conditional |
| RESB | ABLAD | ABLAD | Unloading Point | CHAR | 25 | Conditional | Conditional | Conditional |
| RESB | STARTDATE | STARTDATE | Service Performance Start Date | DATS | 8 | Conditional | Conditional | Conditional |
| RESB | PERFORMANCE PERIODSTARTTIME | PERFORMANCE PERIODSTARTTIME | Service Performance Start Time (UTC) | TIMS | 6 | Conditional | Conditional | Conditional |
| RESB | ENDDATE | ENDDATE | Service Performance End Date | DATS | 8 | Conditional | Conditional | Conditional |
| RESB | PERFORMANCE PERIODENDTIME | PERFORMANCE PERIODENDTIME | Service Performance End Time (UTC) | TIMS | 6 | Conditional | Conditional | Conditional |
| RESB | SERVICE DURATION | SERVICE DURATION | Duration of Lean Service | NUMC | 5 | Conditional | Conditional | Conditional |
| RESB | SERVICE DURATIONUNIT | SERVICE DURATIONUNIT | Duration Unit for a Lean Service | CHAR | 3 | Conditional | Conditional | Conditional |
| ESUH | COMMITMENT | COMMITMENT | Expected Value | NUMC | 13 | Conditional | Conditional | Conditional |
| ESUH | SUMLIMIT | SUMLIMIT | Overall Limit | NUMC | 13 | Conditional | Conditional | Conditional |
4. Work Order Operation Relationships
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| AFVC | AUFNR | AUFNR | Predecessor Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AFVC | VORNR | VORNR | Predecessor Operation | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AFVC | AUFNR | AUFNR | Successor Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AFVC | VORNR | VORNR | Successor Operation | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AFAB | AOBAR | AOBAR | Type of Relationship | CHAR | 2 | Mandatory | Mandatory | Mandatory |
| AFAB | DAUER | DAUER | Time Interval | NUMC | 5 | Conditional | Conditional | Conditional |
| AFAB | ZEINH | ZEINH | Unit | CHAR | 3 | Conditional | Conditional | Conditional |
5. Work Order Object List
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| AUFK | AUFNR | AUFNR | Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| OBJK | OBZAE | OBZAE | Counter | CHAR | 10 | Mandatory | Mandatory | Mandatory |
| OBJK | SORTF | SORTF | Sort | CHAR | 20 | Conditional | Conditional | Conditional |
| IFLOT | TPLNR | TPLNR | Functional Location | CHAR | 30 | Mandatory | Mandatory | Mandatory |
| OBJK | EQUNR | EQUNR | Equipment | CHAR | 18 | Conditional | Conditional | Conditional |
| OBJK | MATNR | MATNR | Material | CHAR | 18 | Conditional | Conditional | Conditional |
| OBJK | QMNUM | QMNUM | Notification | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| OBJK | BAUTL | BAUTL | Assembly | CHAR | 18 | Conditional | Conditional | Conditional |
6. Work Order Confirmation
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| AUFK | AUFNR | AUFNR | Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AFVC | VORNR | VORNR | Operation | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| AFRU | ISMNW | ISMNW | Actual Work | NUMC | 7 | Mandatory | Mandatory | Mandatory |
| AFRU | AUERU | AUERU | Final Confirmation | CHAR | 1 | Conditional | Conditional | Conditional |
| AFRU | OFMNW | OFMNW | Remaining work | NUMC | 7 | Mandatory | Mandatory | Mandatory |
| AFRU | ISDD | ISDD | Work Start Date | DATS | 8 | Mandatory | Mandatory | Mandatory |
| AFRU | ISDZ | ISDZ | Work Start Time | TIMS | 6 | Mandatory | Mandatory | Mandatory |
| AFRU | IEDD | IEDD | Work Finish Date | DATS | 8 | Conditional | Conditional | Conditional |
| AFRU | IEDZ | IEDZ | Work Finish Time | TIMS | 6 | Conditional | Conditional | Conditional |
7. Work Order Operation Capacity Requirement
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| AFVC | AUFNR | AUFNR | Order Number | CHAR | 12 | Mandatory | Mandatory | Mandatory |
| AFVC | VORNR | VORNR | Operation Number | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| KBED | ARBID | ARBID | Work Centre ID | CHAR | 8 | Mandatory | Mandatory | Mandatory |
| KBED | SPLIT | SPLIT | Split Number | CHAR | 3 | Mandatory | Mandatory | Mandatory |
| KBED | PERNR | PERNR | Personnel Number | CHAR | 8 | Mandatory | Mandatory | Mandatory |
| KBEZ | ARBEI | ARBEI | Work | NUMC | 7 | Mandatory | Mandatory | Mandatory |
| KBEZ | ARBEH | ARBEH | Unit of Work | CHAR | 3 | Mandatory | Mandatory | Mandatory |
| KBEZ | DAUNO | DAUNO | Normal Duration | NUMC | 5 | Mandatory | Mandatory | Mandatory |
| KBEZ | DAUNE | DAUNE | Normal duration unit | CHAR | 3 | Mandatory | Mandatory | Mandatory |
8. Work Order Long Text Header
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| STXH | TDOBJECT | TDOBJECT | Texts: application object | CHAR | 10 | Mandatory | Mandatory | Mandatory |
| STXH | TDNAME | TDOBNAME | Name | CHAR | 70 | Mandatory | Mandatory | Mandatory |
| STXH | TDID | TDID | Text ID | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| STXH | TDSPRAS | SPRAS | Language Key | LANG | 1 | Mandatory | Mandatory | Mandatory |
9. Work Order Long Text Line
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| STXH | TDOBJECT | TDOBJECT | Texts: application object | CHAR | 10 | Mandatory | Mandatory | Mandatory |
| STXL | TDNAME | TDOBNAME | Name | CHAR | 70 | Mandatory | Mandatory | Mandatory |
| STXL | TDID | TDID | Text ID | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| STXL | TDSPRAS | SPRAS | Language Key | LANG | 1 | Mandatory | Mandatory | Mandatory |
| STXL | TDFORMAT | TDFORMAT | Tag column | CHAR | 1 | Mandatory | Mandatory | Mandatory |
| STXL | ROWCOUNT | ROWCOUNT | Row number | NUMC | 10 | Mandatory | Mandatory | Mandatory |
| STXL | TXLINE | TDLINE | Text Line | CHAR | 72 | Mandatory | Mandatory | Mandatory |
10. Work Order Operation Long Text Header
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| STXH | TDOBJECT | TDOBJECT | Texts: application object | CHAR | 10 | Mandatory | Mandatory | Mandatory |
| STXH | TDNAME | TDOBNAME | Name | CHAR | 70 | Mandatory | Mandatory | Mandatory |
| STXH | TDID | TDID | Text ID | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| STXH | TDSPRAS | SPRAS | Language Key | LANG | 1 | Mandatory | Mandatory | Mandatory |
11. Work Order Operation Long Text Line
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement YA01 (Reactive Maintenance) | Requirement YA02 (Proactive Maintenance) | Requirement YA03 (Project Order) |
|---|---|---|---|---|---|---|---|---|
| STXH | TDOBJECT | TDOBJECT | Texts: application object | CHAR | 10 | Mandatory | Mandatory | Mandatory |
| STXL | TDNAME | TDOBNAME | Name | CHAR | 70 | Mandatory | Mandatory | Mandatory |
| STXL | TDID | TDID | Text ID | CHAR | 4 | Mandatory | Mandatory | Mandatory |
| STXL | TDSPRAS | SPRAS | Language Key | LANG | 1 | Mandatory | Mandatory | Mandatory |
| STXL | TDFORMAT | TDFORMAT | Tag column | CHAR | 1 | Mandatory | Mandatory | Mandatory |
| STXL | ROWCOUNT | ROWCOUNT | Row number | NUMC | 10 | Mandatory | Mandatory | Mandatory |
| STXL | TXLINE | TDLINE | Text Line | CHAR | 72 | Mandatory | Mandatory | Mandatory |
Data Cleansing
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 9005-001 | C1 | Open Work Order older than 1 month (based on Creation Date) | Work Order (AFKO-AUFNR) based on the relevancy criteria and Creation date (AUFK-ERDAT) <= (Current Date - 30) | Order No, Order Type, Plant, Description, Creation Date | PF2, WP2 |
| 9005-002 | C1 | Open Priority Work Orders older than 2 weeks (based on Creation Date) | Work Order (AFKO-AUFNR) based on the relevancy criteria and Creation date (AUFK-ERDAT) <= (Current Date - 14) and Priority as list in the inclusion list (INC-Work Order Priority) | Order No, Order Type, Plant, Description, Operation/ Activity No, Creation Date | PF2, WP2 |
| 9005-003 | C1 | Open Work Order with Blank Order Description | Work Order (AFKO-AUFNR) based on the relevancy criteria and Blank Short Text (AUFK-KTEXT = '') | Order No, Order Type, Plant | PF2, WP2 |
| 9005-004 | C1 | Open Work Order Operation with Blank Control Key | Work Order (AFKO-AUFNR) based on the relevancy criteria and Blank Control Key (AFVC-STEUS = '') | Order No, Order Type, Plant, Description, Operation/ Activity No | PF2, WP2 |
| 9005-005 | C1 | Open Work Order with Blank Order Operation Description | Work Order (AFKO-AUFNR) based on the relevancy criteria and Blank Operation Short Text (AFVC-LTXA1 = '') | Order No, Order Type, Plant, Description, Operation/ Activity No | PF2, WP2 |
| 9005-006 | C2 | Open Work Orders with unmapped Maintenance Revision | Work Order (AFKO-AUFNR) based on the relevancy criteria and Maintenance Revision (AFIH-REVNR) missing in Maintenance Planning Bucket mapping. Note- Business to perform either of the below | Order No, Order Type, Plant, Description, Maintenance Revision | PF2, WP2 |
| 9005-007 | C3 | Info Report: Open Work Orders with Open Purchase Order | Work Order (AFKO-AUFNR) based on the relevancy criteria having Purchase Order (EKKN-AUFNR is not Blank) and Purchase Order (EKKN-EBELN) which are Open as defined in CNV-9045 Open Purchase Orders | Order No, Order Type, Plant, Description, Purchase Order No, Purchase Order Item | PF2, WP2 |
| 9005-008 | C3 | Info Report: Open Work Orders with Outstanding Reservation | Work Order (AFKO-AUFNR) based on the relevancy criteria having Reservation (RESB-AUFNR is not Blank) and the Reservation is not deleted (RESB-XLOEK = '' ) and not flagged as final issue (RESB-KZEAR = '') and having outstanding quantity (RESB-BDMNG > RESB-ENMNG) | Order No, Order Type, Plant, Description, Reservation No, Material No, Required Quantity, Withdrawal Quantity | PF2, WP2 |
| 9005-009 | C3 | Info Report: Work Order not in scope for migration (not relevant) | Work Order (AFKO-AUFNR) based on the relevancy criteria (Exclusion) Note: These Work Orders will not be not migrated | Order No, Order Type, Plant, Description | PF2, WP2 |
| 9005-010 | C3 | Info Report: Work Orders with Technically Completed (TECO) status that have external services assigned | Work Order (AFKO-AUFNR) based on the relevancy criteria (Exclusion) and having Purchase Order (EKKN-AUFNR is not Blank) and Purchase Order (EKKN-EBELN) which are Open as defined in CNV-9045 Open Purchase Orders and having Service Items (EKPO-PSTYP = '9') | Order No, Order Type, Plant, Description, Purchase Order, Purchase Order Item | PF2, WP2 |
| 9005-011 | C3 | Info Report: Open Work Orders with Functional Location and Assembly assigned and not Equipment | Work Order (AFKO-AUFNR) based on the relevancy criteria with (AFIH-ILOAN <>'') and (AFIH-EQUNR ='') and (AFIH-BAUTL <>'' and BAUTL not existing in Equipment Staging Mapping (OBJECT_ID)) | Order No, Order Type, Plant, Description, Functional Location, Assembly | PF2, WP2 |
| 9005-012 | C3 | Info Report: Open Work Orders without a Technical Object (Functional Location/ Equipment/ Assembly) assigned | Work Order (AFKO-AUFNR) based on the relevancy criteria with no Technical Object (Functional Location/ Equipment/ Assembly) assigned i,e (AFIH-ILOAN = '') and (AFIH-EQUNR = '') and (AFIH-BAUTL ='') Note: These Work Orders will not be not migrated | Order No, Order Type, Plant, Description | PF2, WP2 |
| 9005-013 | C3 | Info Report: Open Work Orders with blank Basic End Date | Work Order (AFKO-AUFNR) based on the relevancy criteria with Basic End Date (AFKO-GLTRP) = '00000000' Note: These Work Orders will not be not migrated | Order No, Order Type, Plant, Description, Basic Start Date, Basic End Date | PF2, WP2 |
| 9005-01 | C3 | Info Report: Open Work Orders maintained as Sub Orders | Work Order (AFKO-AUFNR) based on the relevancy criteria for which Superior Order exists (AFKO-MAUFNR is not Blank) Note: These Work Orders will not be not migrated | Order No, Order Type, Plant, Description | PF2, WP2 |
Note: List of Cleansing is maintained here: Conversion Specs Register (DCT & Cleansing Report)
Conversion Process
The high-level process is represented by the diagram below:
The following represents the high-level process for Source System Extraction:
The following represents the high-level process for DCT:
Collection will be done manually in the Data Collection Template for sites not on SAP- PF2 or WP2 systems
Data Privacy and Sensitivity
Not Applicable
Extraction
Extract data from a source into Advanced Data Migration and Management (ADMM). There are 2 possibilities:
- The data exists. connects to the source and loads the data into the repository. There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ADMM cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in the repository. This is to be conducted using DCT (Data Collection Template) in Advanced Data Migration and Management (ADMM).
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | SyWay Data Team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
| Not Applicable |
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.
Note: All rules specified below should be documented as a tooltip in the DC Page.
Format:
- Line 1: Mandatory / Conditional
- Line 2: Remaining text
1. Work Order Header Data Construction Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant (where Maintenance Plant = Yes) |
| zLegacyAUFNR | Legacy Order Number | Mandatory. |
| AUART | Order Type | Mandatory. Allowed values: YA01 Reactive Maintenance |
| KCHAR | Description | Mandatory. Populate with a meaningful Order Description. Ensure that it does not include any of below characters: ; Semi-colon |
| PRIOK | Priority | Mandatory. Needs to be selected from value list (T356). |
| GSTRP | Basic Start Date | Mandatory. Populate the Work Order planned start date in YYYYMMDD format. |
| GSUZP | Basic Start Time | Mandatory. Populate the Work Order planned start time in HHMMSS format. |
| GLTRP | Basic End Date | Mandatory. Populate the Work Order planned end date in HHMMSS format. |
| GLUZP | Basic End Time | Mandatory. Populate the Work Order planned end time in HHMMSS format. |
| TPLNR | Functional Location | Mandatory. Populate the Functional Location associated to the asset. Value must exist in Functional Location DCT. |
| EQUNR | Equipment | Conditional. Populate if the Asset being maintained is an Equipment. Otherwise, leave the field blank. Value must exist in Equipment DCT. |
| QMNUM | Assigned Notification | Mandatory. Populate the Notification number registering the issue. Value must exist in Notification DCT. |
| ILART | Maintenance Activity Type | Mandatory. Allowed Values: M01 INSPECT |
| PROID | WBS Element (Acc Assignment) | Conditional.
|
2. Work Order Operation Data Construction Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes |
| zLegacyAUFNR | Legacy Order Number | Mandatory. Key to link to Work Order. Must exist in Order Header DCT. |
| zLegacyVORNR | Legacy Operation Number | Mandatory. Sequence number that uniquely identifies an operation in the order. Populate in increments of 10 (e.g., 0010, 0020, 0030) for multiple operations. |
| LTXA1 | Operation Description | Mandatory. Populate with a meaningful description for the Work Order Operation. ; Semi-colon |
| PERNR | Person Responsible | Conditional Populate the Personnel Number of the person responsible/assigned to perform the operation. Must be a valid PERNR in HR master data (i.e exists in PA0001) |
| STEUS | Control Key | Mandatory. Populate appropriate Control Key based on the how the operation is to be processed (internal/external, etc.). Needs to be selected from Value List (T430) with pattern 'PMXX' |
| SAKTO | Cost Element | Conditional. Populate the Cost posting account for external services/materials depending on process. Needs to be selected from value list (CSKA) |
| EKORG | Purchasing Organisation | Conditional. Populate Purchasing org responsible for procurement activities. Needs to be selected from value list (T024E) |
| EKGRP | Purchasing Group | Conditional. Populate Buyer/group responsible for procurement. Needs to be selected from value list (T024) |
| MATKL | Material Group | Conditional. Populate Material Group for the required Materials/ Services. Needs to be selected from value list (T023) |
| ANLZU | System Condition | Conditional. Populate Condition of the System/ Asset during the maintenance activity. Needs to be selected from value list (T375M) |
| DAUNO | Duration | Mandatory. Populate duration to perform the activity. |
| ANZZL | Required Capacities | Mandatory. Populate the number of required capacities to perform the activity. Must be an integer value. Cannot be 0. |
| EINSA | Start Constraint | Conditional. Populate only if Start Constraint logic is used to be used for scheduling in target. Otherwise, leave the field blank. Allowed values: Select from the below list - Must start on |
| NTANF | Start Constraint Date | Conditional. Date on which the constrained start is required. Populate only if EINSA is populated. Otherwise, leave the field blank. Date Format DDMMYYYY. |
| NTANZ | Start Constraint Time | Conditional. Time for the constrained start Populate only if EINSA and NTANF is populated. Otherwise, leave the field blank. Time Format HHMMSS. |
| EINSE | Finish Constraint | Conditional. Populate only if Finish Constraint logic is to be used for scheduling in target. Otherwise, leave the field blank. Allowed values: Select from the below list - Must finish on |
| NTEND | Finish Constraint Date | Conditional. Date on which the constrained finish is required. Populate only if EINSE is populated. Valid Date. Otherwise, leave the field blank. Date Format DDMMYYYY. |
| NTENZ | Finish Constraint Time | Conditional. Time for the constrained finish. Populate only if EINSE and NTEND is populated. Valid Time. Otherwise, leave the field blank. Time Format HHMMSS. |
| MGVRG | Operation Quantity | Conditional. Populate only if the Operation is quantity-based (e.g., service quantity) in the target design. Otherwise, leave the field blank. Numeric value only. Cannot be 0. |
| MEINH | Unit | Conditional. Populate only if MGVRG is populated. Otherwise, leave the field blank. Needs to be selected from value list (T006) |
| PREIS | Price | Conditional. Populate price amount only if the Operation is externally procured / service-related. Otherwise, leave the field blank. Numeric value only. Cannot be negative. |
| PEINH | Price Unit | Conditional. Number of units to which the price refers. Populate only if PREIS is populated. Otherwise, leave the field blank. Must be an integer value. Cannot be 0. |
| LIFNR | Vendor | Conditional. Populate external vendor for the external service/ material if information exist. Otherwise, leave the field blank. Value must exist in Value Mapping: Vendor Number |
| WEMPF | Recipient | Conditional. Populate Goods recipient name for purchasing documents if information exists. Otherwise, leave the field blank. |
| BEDNR | Tracking Number | Conditional. Populate tracking number for PR/PO creation if information exists. Otherwise, leave the field blank. |
| SORTL | Sort Term | Conditional. Populate sort term for the procurement scenario if information exists. Otherwise, leave the field blank. |
| AFNAM | Name of Requisitioner | Conditional. Populate name of the Person requesting procurement if information exists. Otherwise, leave the field blank. |
| IMTORDOPSOPR | MAINTORDOPERATION ISMRPRELEVANT | Populate from the below value list as applicable.
|
3. Work Order Operation Components Data Construction Rules
| Field Name | Field Description | Rule | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes | |||||||||||||||
| zLegacyAUFNR | Legacy Order Number | Mandatory. Key to link to Work Order | |||||||||||||||
| zLegacyVORNR | Legacy Operation Number | Mandatory. Key to link to Work Order Operation. Key to link to Work Order. Must exist in Order Operation DCT. | |||||||||||||||
| POSNR | Item Number of Reservation | Mandatory. Sequence number that uniquely identifies Component assigned in the Order Operation. Populate in increments of 10 (e.g., 0010, 0020, 0030) for multiple Materials. | |||||||||||||||
| MATNR | Material | Conditional Populate with legacy Material number for the component line. Value must exist in Value Mapping: Material Master | |||||||||||||||
| POTX1 | Description | Conditional Populate with a meaningful description for the component line item.
| |||||||||||||||
| POSTP | Item Category | Mandatory. Populate a valid component item category from the below.
Note - If populating data for a lean service, the values could only be "N" (Non-stock) or "E" (Enhanced Limit). | |||||||||||||||
| BDMNG | Quantity | Mandatory. Populate Component quantity requested for the component line. | |||||||||||||||
| MEINS | Unit | Mandatory. Populate if BDMNG is populated. Needs to be selected from value list (T006) | |||||||||||||||
| NO_DISP | Reservation Relevance / Generation of Purchase Requisition | Mandatory. Populate from the below value list as applicable.
| |||||||||||||||
| WERKS | Plant | Conditional Populate the component plant. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes | |||||||||||||||
| BDTER | Requirements Date | Conditional Populate the date on which the requested quantity of material is required. If populating this field ensure the Manual Maintenance of Requirement Date is set as 'X' (Yes). Date Format DDMMYYYY. | |||||||||||||||
| KZMPF | Manual Reqmt Date Indicator | Conditional Populate Maintenance of Requirement Date Flag from the below list. '' = NO | |||||||||||||||
| LGORT | Storage Location | Conditional Populate legacy Storage Location from where stock is planned to be issued. Value must exist in Value Mapping: Storage Location | |||||||||||||||
| CHARG | Batch | Conditional Populate legacy batch if material is batch-managed. Otherwise, leave the field blank. Value must exist in Value Mapping: Batch Class 023 | |||||||||||||||
| GPREIS | Price | Conditional Populate price for the external component/service line as applicable. | |||||||||||||||
| PEINH | Price Unit | Conditional Populate Number of units to which the price refers. Example Populate only if GPREIS is populated. Otherwise, leave the field blank. Must be an integer value. Cannot be 0. | |||||||||||||||
| WAERS | Currency | Conditional Populate the currency key for the component price. Must be maintained if GPREIS is populated. Needs to be selected from value list (TCURC) | |||||||||||||||
| EKORG | Purchasing Organisation | Conditional. Populate Purchasing org responsible for procurement activities. Needs to be selected from value list (T024E) | |||||||||||||||
| EKGRP | Purchasing Group | Conditional. Populate Buyer/group responsible for procurement. Needs to be selected from value list (T024) | |||||||||||||||
| LIFNR | Supplier | Conditional. Populate external vendor for the service/ material if information exist. Otherwise, leave the field blank. Value must exist in Value Mapping: Vendor Number | |||||||||||||||
| INFNR | Purchasing Info Record | Conditional. Value must exist in Value Mapping: Purchasing Info Record Number | |||||||||||||||
| MATKL | Material Group | Conditional. Value must exist in Value Mapping: Material Group | |||||||||||||||
| SAKNR | G/L Account | Conditional Populate G/L account as required for account assignment. Value must exist in Value Mapping: GL Account | |||||||||||||||
| WEMPF | Goods Recipient | Conditional Populate Goods recipient name for purchasing documents if information exists. Otherwise, leave the field blank. | |||||||||||||||
| ABLAD | Unloading Point | Conditional Populate unloading point if information exists. Otherwise, leave the field blank. | |||||||||||||||
| STARTDATE | Service Performance Start Date | Conditional To be populated for Lean Service Component Only. Populate performance start date of the Lean Service item. Leave blank if KZMPF (Manual Reqmt Date Indicator) = '' Date Format DDMMYYYY. | |||||||||||||||
| PERFORMANCE PERIODSTARTTIME | Service Performance Start Time (UTC) | Conditional To be populated for Lean Service Component Only. Populate the start time of the lean service. Only populate if STARTDATE is maintained, else leave blank. Time Format HHMMSS. | |||||||||||||||
| ENDDATE | Service Performance End Date | Conditional To be populated for Lean Service Component Only. Populate performance start end of the Lean Service item. Leave blank if KZMPF (Manual Reqmt Date Indicator) = '' Date Format DDMMYYYY. | |||||||||||||||
| PERFORMANCE PERIODENDTIME | Service Performance End Time (UTC) | Conditional To be populated for Lean Service Component Only. Populate the end time of the lean service. Only populate if ENDDATE is maintained, else leave blank. Time Format HHMMSS. | |||||||||||||||
| SERVICE DURATION | Duration of Lean Service | Conditional To be populated for Lean Service Component Only. Populate the duration value of the Lean Service. Leave blank if Component is not a Lean Service. | |||||||||||||||
| SERVICE DURATIONUNIT | Duration Unit for a Lean Service | Conditional To be populated for Lean Service Component Only. Populate Lean Service duration unit (e.g., Hour, Day). Needs to be selected from value list (T006) | |||||||||||||||
| COMMITMENT | Expected Value | Conditional Populate expected value for the Lean Service. The value must be maintained, if the item category "E" (= Enhanced Limit) has been set for the item (lean service). Please make sure, that this value is less than or equal to the overall limit. | |||||||||||||||
| SUMLIMIT | Overall Limit | Conditional Populate maximum expenditure value for the Lean Service. The value must be maintained (mandatory), if the item category "E" (= Enhanced Limit) has been set for the item (lean service). Please ensure, that this value is greater than or equal to the expected value. |
4. Work Order Operation Relationships Data Construction Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes |
zLegacyAUFNR_PRE | Legacy Order Number (Predecessor) | Mandatory. Populate with the Predecessor order number to which the Predecessor operation belongs. |
| zLegacyVORNR_PRE | Predecessor Operation Number | Mandatory. Populate with the Predecessor operation number within the Predecessor order. |
| zLegacyAUFNR_SUC | Legacy Order Number (Successor) | Mandatory. Populate with the successor order number to which the successor operation belongs. |
| zLegacyVORNR_SUC | Successor Operation Number | Mandatory. Populate with the successor operation number within the successor order. |
| AOBAR | Type of Relationship | Mandatory. Populate relationship type between predecessor and successor operations as required the below list. FS - Finish-to-Start SS - Start-to-Start FF - Finish-to-Finish SF - Start-to-Finish |
| DAUER | Time Interval | Conditional. Populate lag/lead (positive/negative) duration value between operations. |
| ZEINH | Unit | Conditional. Populate duration unit (e.g., Hour, Day) only when DAUER has been populated. Allowed values from T006 to be populated |
5. Work Order Object List Data Construction Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes |
| zLegacyAUFNR | Legacy Order Number | Mandatory. Key to link to Work Order |
| OBZAE | Counter | Mandatory. Populate with a sequential counter per AUFNR representing each object list item (e.g., 0001, 0002…). |
| SORTF | Sort | Conditional Populate a sort key to control grouping of object list items (e.g., by object type, priority, hierarchy). Else leave blank. |
| TPLNR | Functional Location | Mandatory. Populate with the legacy Functional Location assigned to the order. Value must exist in Functional Location mapping. |
| EQUNR | Equipment | Conditional. Populate with the legacy Equipment assigned to the order. Value must exist in Equipment Mapping. |
6. Work Order Confirmation Data Construction Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes |
| zLegacyAUFNR | Legacy Order Number | Mandatory. Key to link to Work Order |
| zLegacyVORNR | Legacy Operation Number | Mandatory. Key to link to Work Order Operation |
| OFMNW | Remaining work | Mandatory. Populate remaining work still expected for the operation after this confirmation. If operation finally confirmed, set to 0 (or blank per design). |
| ISDD | Work Start Date | Mandatory. Populate the actual work start date for the confirmation. |
| ISDZ | Work Start Time | Mandatory. Populate actual work start time for the confirmation. |
| IEDD | Work Finish Date | Conditional. Populate the actual work finish date for the confirmation. |
| IEDZ | Work Finish Time | Conditional. Populate actual work finish time for the confirmation. |
7. Work Order Long Text Line Data Construction Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes |
| zLegacyAUFNR | Legacy Order Number | Mandatory. Key to link to Work Order |
| TDLINE_EN | Text Line (English) | Conditional User to populate Free Text in English Language as applicable |
| TDSPRAS_LC | Language Key (Local) | Conditional User to populate Language Key based language of the Country where the Maintenance Plant exists. Allowed values: |
| TDLINE_LC | Text Line (Local Language) | Conditional User to populate Free Text in language of the country in which each plant is located (French, Italian, Mandarin, Brazilian Portuguese, German or Spanish). |
8. Work Order Operation Long Text Line Data Construction Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | Plant | Mandatory. Populate the Plant to which the Work Order is associated. Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes |
| zLegacyAUFNR | Legacy Order Number | Mandatory. Key to link to Work Order |
| zLegacyVORNR | Legacy Operation Number | Mandatory. Key to link to Work Order Operation |
| TDLINE_EN | Text Line (English) | Conditional User to populate Free Text in English Language as applicable |
| TDSPRAS_LC | Language Key (Local) | Conditional User to populate Language Key based language of the Country where the Maintenance Plant exists. Allowed values: |
| TDLINE_LC | Text Line (Local Language) | Conditional User to populate Free Text in language of the country in which each plant is located (French, Italian, Mandarin, Brazilian Portuguese, German or Spanish). |
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Not Applicable |
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow ADMM to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in Advanced Data Migration and Management (ADMM)
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Obtain DCT Sign-off from Business. | SyWay Data Team |
2 | In dspMigrate, select the wave – S4/HANA – Plant Maintenance | Syniti |
3 | Go to Process Area Launch and Process the Object – Work Order | Syniti |
4 | Review and Validate Error and Preload Reports | Syniti |
5 | Execute the transformation to prepare the target tables | Syniti |
6 | Validate data from pre-load and error reports | Business/Data owner |
7 | Generate load files | Syniti |
Transformation Rules
Note: Unless otherwise specified, the transformation rules applies to YA01, YA02 and YA03 Order Types
1. Work Order Header Transformation Rule (ECC)
Exception: For Work Orders (AUFK-AUFNR) with System Status (JEST-STAT) = Technically Completed (TECO) and relevant open Purchase Order (EKKN-EBELN) as defined in CNV-9045 Open Purchase Orders only Work Order Header needs to be migrated.
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4 HANA | AUFK | AUFNR | Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | AUFK | AUART | Order Type | S/4 HANA | AUFK | AUART | Order Type | Derive as per Value Mapping: Work Order Type |
| 3 | PF2, WP2 | AUFK | KCHAR | Description | S/4 HANA | AUFK | KCHAR | Description | Direct Mapping If blank then default to Notification Description (QMEL-QMTXT) |
| 4 | PF2, WP2 | AFIH | PRIOK | Priority | S/4 HANA | AFIH | PRIOK | Priority | Direct Mapping |
| 5 | PF2, WP2 | AFKO | GSTRP | Basic Start Date | S/4 HANA | AFKO | GSTRP | Basic Start Date | Direct Mapping |
| 6 | PF2, WP2 | AFKO | GSUZP | Basic Start Time | S/4 HANA | AFKO | GSUZP | Basic Start Time | Direct Mapping |
| 7 | PF2, WP2 | AFKO | GLTRP | Basic End Date | S/4 HANA | AFKO | GLTRP | Basic End Date | Direct Mapping |
| 8 | PF2, WP2 | AFKO | GLUZP | Basic End Time | S/4 HANA | AFKO | GLUZP | Basic End Time | Direct Mapping |
| 9 | PF2, WP2 | IFLOT | TPLNR | Functional Location | S/4 HANA | IFLOT | TPLNR | Functional Location |
|
| 10 | PF2, WP2 | AFIH | EQUNR | Equipment | S/4 HANA | AFIH | EQUNR | Equipment |
|
| 11 | PF2, WP2 | IFLOT | TPLNR | Functional Location | S/4 HANA | AFIH | EQUNR | Equipment | Note: Transformation Rule for legacy EQUNR must run before this rule. This rule is for legacy Functional Locations which are converted to Equipment in S4
|
| 12 | PF2, WP2 | AFIH | BAUTL | Assembly | S/4HANA | AFIH | EQUNR | Equipment | Note: Transformation Rule for legacy EQUNR and legacy TPLNR to EQUNR must run before this rule. This rule is for legacy Assemblies which are converted to Equipment in S4
|
| 13 | PF2, WP2 | AFIH | QMNUM | Assigned Notification | S/4 HANA | AFIH | QMNUM | Assigned Notification | Derive as per Value Mapping: Notification |
| 14 | PF2, WP2 | AFIH | REVNR | Maintenance Event/ Revision | S/4 HANA | AFIH | REVNR | Maintenance Event/ Revision | Default to blank |
| 15 | PF2, WP2 | AFIH | ILART | Maintenance Activity Type | S/4 HANA | AFIH | ILART | Maintenance Activity Type | Derive as per Value Mapping: Maintenance Activity Type |
| 16 | - | - | - | - | S/4 HANA | CRHD | ARBPL | Work Center |
|
| 17 | - | - | - | - | S/4 HANA | CRHD | WERKS | Work Center Plant | Derive the CRHD-WERKS from the derived CRHD-ARBPL value |
| 18 | - | - | - | - | S/4 HANA | AFIH | IWERK | Planning Plant |
|
| 19 | - | - | - | - | S/4 HANA | AFIH | INGPR | Planner group |
|
| 20 | - | - | - | - | S/4 HANA | AUFK | WERKS | Maintenance Plant | Copy from IWERK (Planning Plant) |
| 21 | - | - | - | - | S/4 HANA | ILOA | BEBER | Plant Section |
|
| 22 | - | - | - | - | S/4 HANA | ILOA | BUKRS | Company Code |
|
| 23 | PF2, WP2 | ILOA | PROID | WBS Element (Acc Assignment) | S/4 HANA | ILOA | PROID | WBS Element (Acc Assignment) | If Legacy PROID exists in either of the below ADMM Deployment Prep reports with ILOA-PROID = Report-POSID, where Report-ZACTIVE_PROJECT_OPEN_CLOSED = 'OPEN' and Report-ZACTIVE= 'TRUE' -I2M_ECC_SAPWP2_WBS_REPORT then derive using Value Mapping : WBS Element Number. Else default to blank |
| 24 | - | - | - | - | S/4 HANA | ILOA | KOSTL | Cost Center | If Legacy PROID doesn't exists as per the rule mentioned above, then derive Cost Centre from -
|
2. Work Order Header Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4 HANA | AUFK | AUFNR | Order Number | System (Internal numbering) |
| 2 | DCT | AUFK | AUART | Order Type | S/4 HANA | AUFK | AUART | Order Type | Direct Mapping |
| 3 | DCT | AUFK | KCHAR | Description | S/4 HANA | AUFK | KCHAR | Description | Direct Mapping |
| 4 | DCT | AFIH | PRIOK | Priority | S/4 HANA | AFIH | PRIOK | Priority | Direct Mapping |
| 5 | DCT | AFKO | GSTRP | Basic Start Date | S/4 HANA | AFKO | GSTRP | Basic Start Date | Direct Mapping |
| 6 | DCT | AFKO | GSUZP | Basic Start Time | S/4 HANA | AFKO | GSUZP | Basic Start Time | Direct Mapping |
| 7 | DCT | AFKO | GLTRP | Basic End Date | S/4 HANA | AFKO | GLTRP | Basic End Date | Direct Mapping |
| 8 | DCT | AFKO | GLUZP | Basic End Time | S/4 HANA | AFKO | GLUZP | Basic End Time | Direct Mapping |
| 9 | DCT | IFLOT | TPLNR | Functional Location | S/4 HANA | IFLOT | TPLNR | Functional Location | Derive as per Value Mapping: Functional Location |
| 10 | DCT | AFIH | EQUNR | Equipment | S/4 HANA | AFIH | EQUNR | Equipment | Derive as per Value Mapping: Equipment |
| 11 | DCT | AFIH | QMNUM | Assigned Notification | S/4 HANA | AFIH | QMNUM | Assigned Notification | Derive as per Value Mapping: Notification |
| 12 | - | - | - | - | S/4 HANA | AFIH | REVNR | Maintenance Event/ Revision | Default to blank |
| 13 | - | - | - | - | S/4 HANA | AFIH | ILART | Maintenance Activity Type | Direct Mapping |
| 14 | - | - | - | - | S/4 HANA | CRHD | ARBPL | Work Center |
|
| 15 | - | - | - | - | S/4 HANA | CRHD | WERKS | Work Center Plant | Derive the S4 CRHD-WERKS from the derived S4 CRHD-ARBPL value |
| 16 | - | - | - | - | S/4 HANA | AFIH | IWERK | Planning Plant |
|
| 17 | - | - | - | - | S/4 HANA | AFIH | INGPR | Planner group |
|
| 18 | - | - | - | - | S/4 HANA | AUFK | WERKS | Maintenance Plant | Copy from IWERK (Planning Plant) |
| 19 | - | - | - | - | S/4 HANA | ILOA | BEBER | Plant Section |
|
| 20 | - | - | - | - | S/4 HANA | ILOA | BUKRS | Company Code |
|
| 21 | DCT | ILOA | PROID | WBS Element (Acc Assignment) | S/4 HANA | ILOA | PROID | WBS Element (Acc Assignment) | Direct mapping for Order Type (AUART) = 'YA03', Else Default to blank |
| 22 | - | ILOA | KOSTL | Cost Center | S/4 HANA | ILOA | KOSTL | Cost Center | If Legacy PROID doesn't exists as per the rule mentioned above, then derive Cost Centre from -
|
3. Work Order Operation Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4 HANA | AFVC | AUFNR | Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | AFVC | VORNR | Legacy Operation/Activity | S/4 HANA | AFVC | VORNR | Operation/Activity | DIrect Mapping |
| 3 | PF2, WP2 | AFVC | LTXA1 | Operation Description | S/4 HANA | AFVC | LTXA1 | Operation Description | DIrect Mapping |
| 4 | PF2, WP2 | CRHD | ARBPL | Work Center | S/4 HANA | CRHD | ARBPL | Work Center | Derive as per Value Mapping: Work Centre A2D |
| 5 | PF2, WP2 | CRHD | WERKS | Work Center Plant | S/4 HANA | CRHD | WERKS | Work Center Plant | Derive the S4 CRHD-WERKS from the derived S4 CRHD-ARBPL value |
| 6 | PF2, WP2 | AFVC | PERNR | Person Responsible | S/4 HANA | AFVC | PERNR | Person Responsible | Derive as per Value Mapping: Employee Personnel. |
| 7 | PF2, WP2 | AFVC | STEUS | Control Key | S/4 HANA | AFVC | STEUS | Control Key | Derive as per Value Mapping: Work Order Operation Control Type |
| 8 | PF2, WP2 | AFVC | SAKTO | Cost Element | S/4 HANA | AFVC | SAKTO | Cost Element | Derive as per Value Mapping: GL Account |
| 9 | PF2, WP2 | AFVC | EKORG | Purchasing Organization | S/4 HANA | AFVC | EKORG | Purchasing Organisation | Derive as per Value Mapping: Purchasing Organization |
| 10 | PF2, WP2 | AFVC | EKGRP | Purchasing Group | S/4 HANA | AFVC | EKGRP | Purchasing Group | Derive as per Value Mapping: Purchasing Group |
| 11 | PF2, WP2 | AFVC | MATKL | Material Group | S/4 HANA | AFVC | MATKL | Material Group | Derive as per Value Mapping: Material Group |
| 12 | PF2, WP2 | AFVC | ANLZU | System Condition | S/4 HANA | AFVC | ANLZU | System Condition | Derive as per Value Mapping: Work Order System Condition |
| 13 | PF2, WP2 | AFVC | LARNT | Activity Type | S/4 HANA | AFVC | LARNT | Activity Type | Derive Activity Type (CRCO-LSTAR) from Target Work Centre (CRHD-ARBPL) |
| 14 | PF2, WP2 | AFVV | ARBEI | Work | S/4 HANA | AFVV | ARBEI | Work | DIrect Mapping If ARBEH is in Minutes, convert ARBEI value to Hours |
| 15 | PF2, WP2 | AFVV | ARBEH | Work Unit | S/4 HANA | AFVV | ARBEH | Work Unit | Default to 'H' (Hours) |
| 16 | PF2, WP2 | AFVC | INDET | Calculation Key | S/4 HANA | AFVC | INDET | Calculation Key | Direct Mapping If Blank Default to “0 – Maintained Individually” |
| 17 | PF2, WP2 | AFVV | DAUNO | Duration | S/4 HANA | AFVV | DAUNO | Duration | DIrect Mapping If DAUNE is in Minutes, convert DAUNO value to Hours |
| 18 | PF2, WP2 | AFVV | DAUNE | Duration Unit | S/4 HANA | AFVV | DAUNE | Duration Unit | Default to 'H' (Hours) |
| 19 | PF2, WP2 | AFVC | ANZZL | Required Capacities | S/4 HANA | AFVC | ANZZL | Required Capacities | DIrect Mapping |
| 20 | PF2, WP2 | AFVV | EINSA | Start Constraint | S/4 HANA | AFVV | EINSA | Start Constraint | DIrect Mapping |
| 21 | PF2, WP2 | AFVV | NTANF | Start Constraint Date | S/4 HANA | AFVV | NTANF | Start Constraint Date | DIrect Mapping |
| 22 | PF2, WP2 | AFVV | NTANZ | Start Constraint Time | S/4 HANA | AFVV | NTANZ | Start Constraint Time | DIrect Mapping |
| 23 | PF2, WP2 | AFVV | EINSE | Finish Constraint | S/4 HANA | AFVV | EINSE | Finish Constraint | DIrect Mapping |
| 24 | PF2, WP2 | AFVV | NTEND | Finish Constraint Date | S/4 HANA | AFVV | NTEND | Finish Constraint Date | DIrect Mapping |
| 25 | PF2, WP2 | AFVV | NTENZ | Finish Constraint Time | S/4 HANA | AFVV | NTENZ | Finish Constraint Time | DIrect Mapping |
| 26 | PF2, WP2 | AFVV | MGVRG | Operation Quantity | S/4 HANA | AFVV | MGVRG | Operation Quantity | DIrect Mapping |
| 27 | PF2, WP2 | AFVV | MEINH | Operation Quantity Unit | S/4 HANA | AFVV | MEINH | Operation Quantity Unit | DIrect Mapping |
| 28 | PF2, WP2 | AFVC | PREIS | Price | S/4 HANA | AFVC | PREIS | Price | DIrect Mapping |
| 29 | PF2, WP2 | AFVC | WAERS | Currency | S/4 HANA | AFVC | WAERS | Currency | DIrect Mapping |
| 30 | PF2, WP2 | AFVC | PEINH | Price Unit | S/4 HANA | AFVC | PEINH | Price Unit | DIrect Mapping |
| 31 | PF2, WP2 | AFVC | LIFNR | Vendor | S/4 HANA | AFVC | LIFNR | Vendor | Derive as per Value Mapping: Vendor Number |
| 34 | PF2, WP2 | AFVC | WEMPF | Recipient | S/4 HANA | AFVC | WEMPF | Recipient | DIrect Mapping |
| 35 | PF2, WP2 | AFVC | BEDNR | Tracking Number | S/4 HANA | AFVC | BEDNR | Tracking Number | DIrect Mapping |
| 36 | PF2, WP2 | AFVC | SORTL | Sort Term | S/4 HANA | AFVC | SORTL | Sort Term | DIrect Mapping |
| 37 | PF2, WP2 | AFVC | INFNR | Purchasing Info Record | S/4 HANA | AFVC | INFNR | Purchasing Info Record | Derive as per Value Mapping: Purchasing Info Record Number |
| 38 | PF2, WP2 | AFVC | AFNAM | Name of Requisitioner | S/4 HANA | AFVC | AFNAM | Name of Requisitioner | DIrect Mapping |
| 39 | PF2, WP2 | AFVC | ABLAD | Unloading Point | S/4 HANA | AFVC | ABLAD | Unloading Point | DIrect Mapping |
| 40 | PF2, WP2 | AFVV | PLIFZ | Planned Delivery Time - Day | S/4 HANA | AFVV | PLIFZ | Planned Delivery Time - Day | DIrect Mapping |
| 41 | PF2, WP2 | AFVC | NO_DISP | Reservation Relevance / Generation of Purchase Requisition | S/4 HANA | IMTORDOPSOPR | MAINTORDOPERATION ISMRPRELEVANT | Reservation Relevance / Generation of Purchase Requisition | DIrect Mapping |
4. Work Order Operation Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | AFVC | zLegacyAUFNR | Legacy Order Number | S/4 HANA | AFVC | AUFNR | Order Number | DIrect Mapping |
| 2 | DCT | AFVC | zLegacyVORNR | Legacy Operation/Activity | S/4 HANA | AFVC | VORNR | Operation/Activity | DIrect Mapping |
| 3 | DCT | AFVC | LTXA1 | Operation Description | S/4 HANA | AFVC | LTXA1 | Operation Description | DIrect Mapping |
| 4 | DCT | CRHD | ARBPL | Work Center | S/4 HANA | CRHD | ARBPL | Work Center | DIrect Mapping |
| 5 | DCT | CRHD | WERKS | Work Center Plant | S/4 HANA | CRHD | WERKS | Work Center Plant | DIrect Mapping |
| 6 | DCT | AFVC | PERNR | Person Responsible | S/4 HANA | AFVC | PERNR | Person Responsible | DIrect Mapping |
| 7 | DCT | AFVC | STEUS | Control Key | S/4 HANA | AFVC | STEUS | Control Key | DIrect Mapping |
| 8 | DCT | AFVC | SAKTO | Cost Element | S/4 HANA | AFVC | SAKTO | Cost Element | DIrect Mapping |
| 9 | DCT | AFVC | EKORG | Purchasing Organization | S/4 HANA | AFVC | EKORG | Purchasing Organisation | DIrect Mapping |
| 10 | DCT | AFVC | EKGRP | Purchasing Group | S/4 HANA | AFVC | EKGRP | Purchasing Group | DIrect Mapping |
| 11 | DCT | AFVC | MATKL | Material Group | S/4 HANA | AFVC | MATKL | Material Group | DIrect Mapping |
| 12 | DCT | AFVC | ANLZU | System Condition | S/4 HANA | AFVC | ANLZU | System Condition | DIrect Mapping |
| 13 | DCT | AFVC | LARNT | Activity Type | S/4 HANA | AFVC | LARNT | Activity Type | DIrect Mapping |
| 14 | DCT | AFVV | ARBEI | Work | S/4 HANA | AFVV | ARBEI | Work | Derive Work = DAUNO X ANZZL |
| 15 | DCT | AFVV | ARBEH | Work Unit | S/4 HANA | AFVV | ARBEH | Work Unit | Default to 'H' (Hours) |
| 16 | DCT | AFVC | INDET | Calculation Key | S/4 HANA | AFVC | INDET | Calculation Key | Default to '2' (Calculate Work) |
| 17 | DCT | AFVV | DAUNO | Duration | S/4 HANA | AFVV | DAUNO | Duration | DIrect Mapping |
| 18 | DCT | AFVV | DAUNE | Duration Unit | S/4 HANA | AFVV | DAUNE | Duration Unit | Default to 'H' (Hours) |
| 19 | DCT | AFVC | ANZZL | Required Capacities | S/4 HANA | AFVC | ANZZL | Required Capacities | DIrect Mapping |
| 20 | DCT | AFVV | EINSA | Start Constraint | S/4 HANA | AFVV | EINSA | Start Constraint | DIrect Mapping |
| 21 | DCT | AFVV | NTANF | Start Constraint Date | S/4 HANA | AFVV | NTANF | Start Constraint Date | DIrect Mapping |
| 22 | DCT | AFVV | NTANZ | Start Constraint Time | S/4 HANA | AFVV | NTANZ | Start Constraint Time | DIrect Mapping |
| 23 | DCT | AFVV | EINSE | Finish Constraint | S/4 HANA | AFVV | EINSE | Finish Constraint | DIrect Mapping |
| 24 | DCT | AFVV | NTEND | Finish Constraint Date | S/4 HANA | AFVV | NTEND | Finish Constraint Date | DIrect Mapping |
| 25 | DCT | AFVV | NTENZ | Finish Constraint Time | S/4 HANA | AFVV | NTENZ | Finish Constraint Time | DIrect Mapping |
| 26 | DCT | AFVV | MGVRG | Operation Quantity | S/4 HANA | AFVV | MGVRG | Operation Quantity | DIrect Mapping |
| 27 | DCT | AFVV | MEINH | Operation Quantity Unit | S/4 HANA | AFVV | MEINH | Operation Quantity Unit | DIrect Mapping |
| 28 | DCT | AFVC | PREIS | Price | S/4 HANA | AFVC | PREIS | Price | DIrect Mapping |
| 29 | DCT | AFVC | WAERS | Currency | S/4 HANA | AFVC | WAERS | Currency | DIrect Mapping |
| 30 | DCT | AFVC | PEINH | Price Unit | S/4 HANA | AFVC | PEINH | Price Unit | DIrect Mapping |
| 31 | DCT | AFVC | LIFNR | Vendor | S/4 HANA | AFVC | LIFNR | Vendor | DIrect Mapping |
| 34 | DCT | AFVC | WEMPF | Recipient | S/4 HANA | AFVC | WEMPF | Recipient | DIrect Mapping |
| 35 | DCT | AFVC | BEDNR | Tracking Number | S/4 HANA | AFVC | BEDNR | Tracking Number | DIrect Mapping |
| 36 | DCT | AFVC | SORTL | Sort Term | S/4 HANA | AFVC | SORTL | Sort Term | DIrect Mapping |
| 37 | DCT | AFVC | INFNR | Purchasing Info Record | S/4 HANA | AFVC | INFNR | Purchasing Info Record | DIrect Mapping |
| 38 | DCT | AFVC | AFNAM | Name of Requisitioner | S/4 HANA | AFVC | AFNAM | Name of Requisitioner | DIrect Mapping |
| 39 | DCT | AFVC | ABLAD | Unloading Point | S/4 HANA | AFVC | ABLAD | Unloading Point | DIrect Mapping |
| 40 | DCT | AFVV | PLIFZ | Planned Delivery Time - Day | S/4 HANA | AFVV | PLIFZ | Planned Delivery Time - Day | DIrect Mapping |
| 41 | DCT | IMTORDOPSOPR | MAINTORDOPERATION ISMRPRELEVANT | Reservation Relevance / Generation of Purchase Requisition | S/4 HANA | IMTORDOPSOPR | MAINTORDOPERATION ISMRPRELEVANT | Reservation Relevance / Generation of Purchase Requisition | DIrect Mapping |
5. Work Order Operation Component Transformation Rule (ECC)
Criteria - Load all components except for the following scenario:
- Work Order Operation status is CNF, or
- Item Category = L, and Requirement Quantity =< Withdrawn Quantity, or
- Item Cateogry = N, and Requirement Quantity = PO Quantity or
- Item Category = L/N/T, and Final Issue is ticked
Note: External Services will be mapped to Lean Service Materials. Target Field marked with * are to be revisited post migration of Lean Services.
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4 HANA | AFVC | AUFNR | Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | AFVC | VORNR | Operation Number | S/4 HANA | AFVC | VORNR | Operation Number | DIrect Mapping |
| 3 | PF2, WP2 | RESB | POSNR | Item Number of Reservation | S/4 HANA | RESB | POSNR | Item Number of Reservation | DIrect Mapping |
| 4 | PF2, WP2 | RESB | MATNR | Material Number | S/4 HANA | RESB | MATNR* | Material | If not Blank, derive based on Value Mapping: Material Master |
| 5 | PF2, WP2 | RESB | POTX1 | Description | S/4 HANA | RESB | POTX1* | Description | Direct Mapping, If Material number is blank. This field is defaulted from the Material Master. Only load if Material Number is blank. If Material number is not blank, retrieve from Material table for reference only. |
| 6 | PF2, WP2 | RESB | POSTP | Item Category | S/4 HANA | RESB | POSTP* | Item Category | DIrect Mapping Validation to ensure – if legacy material number is blank, value must be “N” or “T” |
| 7 | PF2, WP2 | RESB | BDMNG | Requirement Quantity | S/4 HANA | RESB | BDMNG* | Requirement Quantity | If UOM does not allow decimal, then round the quantity (before processing /mapping / convert based on UOM factor) If Item Category = “L”
If Item Category = N”
Select MENGE from EKPO where AFVC.AUFNR = RESB.AUFNR and AFVC.VORNR = RESB.VORNR and RESB.RSNUM = EBAN.ARSNR and RESB.RSPOS = EBAN.ARSPS and RESB.XLOEK<> ‘X’ and EBAN.BANFN = EKPO.BANFN and EBAN.BNFPO = EKPO.BNFPO Error if negative |
| 8 | PF2, WP2 | RESB | MEINS | Unit | S/4 HANA | RESB | MEINS* | Unit | DIrect Mapping |
| 9 | PF2, WP2 | RESB | NO_DISP | Reservation Relevance / Generation of Purchase Requisition | S/4 HANA | RESB | NO_DISP | Reservation Relevance / Generation of Purchase Requisition | If PO exist, then set to 1 “Never” |
| 10 | PF2, WP2 | RESB | WERKS | Plant | S/4 HANA | RESB | WERKS* | Plant | If not blank, Derive based on Value Mapping: Plant |
| 11 | PF2, WP2 | RESB | BDTER | Requirements Date | S/4 HANA | RESB | BDTER | Requirements Date | Direct Mapping |
| 12 | PF2, WP2 | RESB | KZMPF | Manual Reqmt Date Indicator | S/4 HANA | RESB | KZMPF* | Manual Reqmt Date Indicator | Direct Mapping |
| 13 | PF2, WP2 | RESB | LGORT | Storage Location | S/4 HANA | RESB | LGORT | Storage Location | If not blank, Derive based on Value Mapping: Storage Location. Ensure material is extended to the storage location. |
| 14 | PF2, WP2 | RESB | CHARG | Batch | S/4 HANA | RESB | CHARG | Batch | Default to Blank |
| 15 | PF2, WP2 | RESB | GPREIS | Price | S/4 HANA | RESB | GPREIS* | Price | Only for Item Category = N, Transform based on the external number of the price Conversion of Price decimal using TCURX table IF CURRDEC=’0’, Price * 100, Not applicable if Item Category <> N |
| 16 | PF2, WP2 | RESB | PEINH | Price Unit | S/4 HANA | RESB | PEINH* | Price Unit | DIrect Mapping |
| 17 | PF2, WP2 | RESB | WAERS | Currency | S/4 HANA | RESB | WAERS* | Currency | Only for Item Category = N, Transform based on mapping table for Currency Code Error if cannot be mapped. Not applicable if Item Category <> N |
| 18 | PF2, WP2 | RSADD | EKORG | Purchasing Organization | S/4 HANA | RSADD | EKORG* | Purchasing Organization | If not blank, Derive based on Value Mapping: Purchasing Organization |
| 19 | PF2, WP2 | RESB | EKGRP | Purchasing Group | S/4 HANA | RESB | EKGRP* | Purchasing Group | If not blank, Derive based on Value Mapping: Purchasing Group |
| 20 | PF2, WP2 | RESB | LIFNR | Supplier | S/4 HANA | RESB | LIFNR | Supplier | If not blank, Derive based on Value Mapping: Vendor |
| 21 | PF2, WP2 | RESB | INFNR | Purchasing Info Record | S/4 HANA | RESB | INFNR | Purchasing Info Record | If not blank, Derive based on Value Mapping: Purchasing Info Record |
| 22 | PF2, WP2 | RESB | MATKL | Material Group | S/4 HANA | RESB | MATKL | Material Group | If not blank, Derive based on Value Mapping: Material Group |
| 23 | PF2, WP2 | RESB | SAKNR | G/L Account | S/4 HANA | RESB | SAKNR | G/L Account | If not blank, Derive based on Value Mapping: Material Group |
| 24 | PF2, WP2 | RESB | WEMPF | Goods Recipient | S/4 HANA | RESB | WEMPF | Goods Recipient | Direct Mapping |
| 25 | PF2, WP2 | RESB | ABLAD | Unloading Point | S/4 HANA | RESB | ABLAD | Unloading Point | Direct Mapping |
| 26 | - | - | - | - | S/4 HANA | RESB | STARTDATE* | Service Performance Start Date | Default to Blank |
| 27 | - | - | - | - | S/4 HANA | RESB | PERFORMANCE PERIODSTARTTIME* | Service Performance Start Time (UTC) | Default to Blank |
| 28 | - | - | - | - | S/4 HANA | RESB | ENDDATE* | Service Performance End Date | Default to Blank |
| 29 | - | - | - | - | S/4 HANA | RESB | PERFORMANCE PERIODENDTIME* | Service Performance End Time (UTC) | Default to Blank |
| 30 | - | - | - | - | S/4 HANA | RESB | SERVICEDURATION* | Duration of Lean Service | Default to Blank |
| 31 | - | - | - | - | S/4 HANA | RESB | SERVICEDURATIONUNIT* | Duration Unit for a Lean Service | Default to Blank |
| 32 | - | - | - | - | S/4 HANA | ESUH | COMMITMENT* | Expected Value | Default to Blank |
| 33 | - | - | - | - | S/4 HANA | ESUH | SUMLIMIT* | Overall Limit | Default to Blank |
5. Work Order Operation Component Transformation Rule (DCT)
Note: External Services will be mapped to Lean Service Materials. Target Field marked with * are to be revisited post migration of Lean Services.
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | AFVC | zLegacyAUFNR | Legacy Order Number | S/4 HANA | AFVC | AUFNR | Order Number | DIrect Mapping |
| 2 | DCT | AFVC | zLegacyVORNR | Legacy Operation Number | S/4 HANA | AFVC | VORNR | Operation Number | DIrect Mapping |
| 3 | DCT | RESB | POSNR | Item Number of Reservation | S/4 HANA | RESB | POSNR | Item Number of Reservation | DIrect Mapping |
| 4 | DCT | RESB | MATNR | Material Number | S/4 HANA | RESB | MATNR* | Material | DIrect Mapping |
| 5 | DCT | RESB | POTX1 | Description | S/4 HANA | RESB | POTX1* | Description | DIrect Mapping |
| 6 | DCT | RESB | POSTP | Item Category | S/4 HANA | RESB | POSTP* | Item Category | DIrect Mapping |
| 7 | DCT | RESB | BDMNG | Requirement Quantity | S/4 HANA | RESB | BDMNG* | Requirement Quantity | DIrect Mapping |
| 8 | DCT | RESB | MEINS | Unit | S/4 HANA | RESB | MEINS* | Unit | DIrect Mapping |
| 9 | DCT | RESB | NO_DISP | Reservation Relevance / Generation of Purchase Requisition | S/4 HANA | RESB | NO_DISP | Reservation Relevance / Generation of Purchase Requisition | DIrect Mapping |
| 10 | DCT | RESB | WERKS | Plant | S/4 HANA | RESB | WERKS* | Plant | DIrect Mapping |
| 11 | DCT | RESB | BDTER | Requirements Date | S/4 HANA | RESB | BDTER | Requirements Date | Direct Mapping |
| 12 | DCT | RESB | KZMPF | Manual Reqmt Date Indicator | S/4 HANA | RESB | KZMPF* | Manual Reqmt Date Indicator | Direct Mapping |
| 13 | DCT | RESB | LGORT | Storage Location | S/4 HANA | RESB | LGORT | Storage Location | DIrect Mapping |
| 14 | DCT | RESB | CHARG | Batch | S/4 HANA | RESB | CHARG | Batch | Default to Blank |
| 15 | DCT | RESB | GPREIS | Price | S/4 HANA | RESB | GPREIS* | Price | DIrect Mapping |
| 16 | DCT | RESB | PEINH | Price Unit | S/4 HANA | RESB | PEINH* | Price Unit | DIrect Mapping |
| 17 | DCT | RESB | WAERS | Currency | S/4 HANA | RESB | WAERS* | Currency | DIrect Mapping |
| 18 | DCT | RSADD | EKORG | Purchasing Organization | S/4 HANA | RSADD | EKORG* | Purchasing Organization | DIrect Mapping |
| 19 | DCT | RESB | EKGRP | Purchasing Group | S/4 HANA | RESB | EKGRP* | Purchasing Group | DIrect Mapping |
| 20 | DCT | RESB | LIFNR | Supplier | S/4 HANA | RESB | LIFNR | Supplier | DIrect Mapping |
| 21 | DCT | RESB | INFNR | Purchasing Info Record | S/4 HANA | RESB | INFNR | Purchasing Info Record | DIrect Mapping |
| 22 | DCT | RESB | MATKL | Material Group | S/4 HANA | RESB | MATKL | Material Group | DIrect Mapping |
| 23 | DCT | RESB | SAKNR | G/L Account | S/4 HANA | RESB | SAKNR | G/L Account | DIrect Mapping |
| 24 | DCT | RESB | WEMPF | Goods Recipient | S/4 HANA | RESB | WEMPF | Goods Recipient | Direct Mapping |
| 25 | DCT | RESB | ABLAD | Unloading Point | S/4 HANA | RESB | ABLAD | Unloading Point | Direct Mapping |
| 26 | DCT | - | - | - | S/4 HANA | RESB | STARTDATE* | Service Performance Start Date | Default to Blank |
| 27 | DCT | - | - | - | S/4 HANA | RESB | PERFORMANCE PERIODSTARTTIME* | Service Performance Start Time (UTC) | Default to Blank |
| 28 | DCT | - | - | - | S/4 HANA | RESB | ENDDATE* | Service Performance End Date | Default to Blank |
| 29 | DCT | - | - | - | S/4 HANA | RESB | PERFORMANCE PERIODENDTIME* | Service Performance End Time (UTC) | Default to Blank |
| 30 | DCT | - | - | - | S/4 HANA | RESB | SERVICEDURATION* | Duration of Lean Service | Default to Blank |
| 31 | DCT | - | - | - | S/4 HANA | RESB | SERVICEDURATIONUNIT* | Duration Unit for a Lean Service | Default to Blank |
| 32 | DCT | - | - | - | S/4 HANA | ESUH | COMMITMENT* | Expected Value | Default to Blank |
| 33 | DCT | - | - | - | S/4 HANA | ESUH | SUMLIMIT* | Overall Limit | Default to Blank |
6. Work Order Operation Relationships Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2, WP2 | AFVC | AUFNR | Predecessor Order Number | S/4 HANA | AFVC | AUFNR | Predecessor Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | AFVC | VORNR | Predecessor Order Operation | S/4 HANA | AFVC | VORNR | Predecessor Order Operation | Direct Mapping |
| 3 | PF2, WP2 | AFVC | AUFNR | Successor Order Number | S/4 HANA | AFVC | AUFNR | Successor Order Number | System (Internal numbering) |
| 4 | PF2, WP2 | AFVC | VORNR | Successor Order Operation | S/4 HANA | AFVC | VORNR | Successor Order Operation | Direct Mapping |
| 5 | PF2, WP2 | AFAB | AOBAR | Type of Relationship | S/4 HANA | AFAB | AOBAR | Type of Relationship | Direct Mapping |
| 6 | PF2, WP2 | AFAB | DAUER | Time Interval | S/4 HANA | AFAB | DAUER | Time Interval | Direct Mapping |
| 7 | PF2, WP2 | AFAB | ZEINH | Unit | S/4 HANA | AFAB | ZEINH | Unit | Direct Mapping |
7. Work Order Operation Relationships Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | AFVC | zLegacyAUFNR_PRE | Predecessor Order Number | S/4 HANA | AFVC | AUFNR | Predecessor Order Number | System (Internal numbering) |
| 2 | DCT | AFVC | VORNR_PRE | Predecessor Order Operation | S/4 HANA | AFVC | VORNR | Predecessor Order Operation | Direct Mapping |
| 3 | DCT | AFVC | zLegacyAUFNR_SUC | Successor Order Number | S/4 HANA | AFVC | AUFNR | Successor Order Number | System (Internal numbering) |
| 4 | DCT | AFVC | VORNR_SUC | Successor Order Operation | S/4 HANA | AFVC | VORNR | Successor Order Operation | Direct Mapping |
| 5 | DCT | AFAB | AOBAR | Type of Relationship | S/4 HANA | AFAB | AOBAR | Type of Relationship | Direct Mapping |
| 6 | DCT | AFAB | DAUER | Time Interval | S/4 HANA | AFAB | DAUER | Time Interval | Direct Mapping |
| 7 | DCT | AFAB | ZEINH | Unit | S/4 HANA | AFAB | ZEINH | Unit | Direct Mapping |
8. Work Order Object List Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4 HANA | AFVC | AUFNR | Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | OBJK | OBZAE | Counter | S/4 HANA | OBJK | OBZAE | Counter | DIrect Mapping |
| 3 | PF2, WP2 | OBJK | SORTF | Sort | S/4 HANA | OBJK | SORTF | Sort | DIrect Mapping |
| 4 | PF2, WP2 | IFLOT | TPLNR | Functional Location | S/4 HANA | IFLOT | TPLNR | Functional Location | If not blank, Use Value Mapping: Functional Location |
| 5 | PF2, WP2 | OBJK | EQUNR | Equipment | S/4 HANA | OBJK | EQUNR | Equipment | If not blank, Use Value Mapping: Equipment |
| 6 | PF2, WP2 | IFLOT | TPLNR | Functional Location | S/4 HANA | OBJK | EQUNR | Equipment | Note: Transformation Rule for legacy EQUNR must run before this rule. This rule is for legacy Functional Locations which are converted to Equipment in S4
|
| 7 | PF2, WP2 | OBJK | BAUTL | Assembly | S/4 HANA | OBJK | EQUNR | Equipment | Note: Transformation Rule for legacy EQUNR and legacy TPLNR to EQUNR must run before this rule. This rule is for legacy Assemblies which are converted to Equipment in S4
|
| 8 | PF2, WP2 | OBJK | MATNR | Material | S/4 HANA | OBJK | MATNR | Material | Derive as per Value Mapping: Material Master |
| 9 | PF2, WP2 | OBJK | QMNUM | Notification | S/4 HANA | OBJK | QMNUM | Notification | Derive as per Value Mapping: Notification |
9. Work Order Object List Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | AFVC | zLegacyAUFNR | Legacy Order Number | S/4 HANA | AFVC | AUFNR | Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | OBJK | OBZAE | Counter | S/4 HANA | OBJK | OBZAE | Counter | DIrect Mapping |
| 3 | PF2, WP2 | OBJK | SORTF | Sort | S/4 HANA | OBJK | SORTF | Sort | DIrect Mapping |
| 4 | PF2, WP2 | IFLOT | TPLNR | Functional Location | S/4 HANA | IFLOT | TPLNR | Functional Location | Derive as per Value Mapping: Functional Location |
| 5 | PF2, WP2 | OBJK | EQUNR | Equipment | S/4 HANA | OBJK | EQUNR | Equipment | Derive as per Value Mapping: Equipment |
| 6 | PF2, WP2 | OBJK | MATNR | Material | S/4 HANA | OBJK | MATNR | Material | Default to Blank |
| 7 | PF2, WP2 | OBJK | QMNUM | Notification | S/4 HANA | OBJK | QMNUM | Notification | Derive as per Value Mapping: Notification |
10. Work Order Confirmation Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4 HANA | AUFK | AUFNR | Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | AFVC | VORNR | Operation Number | S/4 HANA | AFVC | VORNR | Operation Number | DIrect Mapping |
| 3 | PF2, WP2 | AFRU | ISMNW | Actual Work | S/4 HANA | AFRU | ISMNW | Actual Work | Default to '0' |
| 4 | PF2, WP2 | AFRU | AUERU | Final Confirmation | S/4 HANA | AFRU | AUERU | Final Confirmation | If for a specific operation, final confirmation is 'X' in legacy, then pass 'X', else keep Blank |
| 5 | PF2, WP2 | AFRU | OFMNW | Remaining work | S/4 HANA | AFRU | OFMNW | Remaining work | Calculate what is the remaining work based on the planned hours (AFVC-ARBEI) – Total Actual work (AFRU-ISMNW) |
| 6 | PF2, WP2 | AFRU | ISDD | Work Start Date | S/4 HANA | AFRU | ISDD | Work Start Date | Default Current Date |
| 7 | PF2, WP2 | AFRU | ISDZ | Work Start Time | S/4 HANA | AFRU | ISDZ | Work Start Time | Default “000000” |
| 9 | PF2, WP2 | AFRU | IEDD | Work Finish Date | S/4 HANA | AFRU | IEDD | Work Finish Date | Default Current Date |
| 10 | PF2, WP2 | AFRU | IEDZ | Work Finish Time | S/4 HANA | AFRU | IEDZ | Work Finish Time | Default “000000” |
11. Work Order Confirmation Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | AFVC | zLegacyAUFNR | Legacy Order Number | S/4 HANA | AFVC | AUFNR | Order Number | DIrect Mapping |
| 2 | DCT | AFVC | zLegacyVORNR | Legacy Operation/Activity | S/4 HANA | AFVC | VORNR | Operation/Activity | DIrect Mapping |
| 3 | DCT | AFRU | ISMNW | Actual Work | S/4 HANA | AFRU | ISMNW | Actual Work | Default to '0' |
| 4 | DCT | AFRU | AUERU | Final Confirmation | S/4 HANA | AFRU | AUERU | Final Confirmation | If Remaining Work = '0' then pass 'X', else keep Blank |
| 5 | DCT | AFRU | OFMNW | Remaining work | S/4 HANA | AFRU | OFMNW | Remaining work | DIrect Mapping |
| 6 | DCT | AFRU | ISDD | Work Start Date | S/4 HANA | AFRU | ISDD | Work Start Date | Default Current Date |
| 7 | DCT | AFRU | ISDZ | Work Start Time | S/4 HANA | AFRU | ISDZ | Work Start Time | Default “000000” |
| 9 | DCT | AFRU | IEDD | Work Finish Date | S/4 HANA | AFRU | IEDD | Work Finish Date | Default Current Date |
| 10 | DCT | AFRU | IEDZ | Work Finish Time | S/4 HANA | AFRU | IEDZ | Work Finish Time | Default “000000” |
12. Work Order Operation Capacity Requirement Transformation Rule (ECC)
Work Order Operation Capacity Requirement is to be migrated only for work orders -
- within creation date (AUFK-ERDAT) later than X Period prior of the Migration / "Go-Live" Date (OTH_Migration_Date Relevant Values A2D (using Object ID "9005" and Field Name = "AUFK-ERDAT") - OTH_Migration_Date Relevant Values A2D (using Object ID "9005" and Field Name = "AUFK-ERDAT_PERIOD"))
- with entries existing in KBED
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4 HANA | AUFK | AUFNR | Order Number | System (Internal numbering) |
| 2 | PF2, WP2 | AFVC | VORNR | Operation Number | S/4 HANA | AFVC | VORNR | Operation Number | DIrect Mapping |
| 3 | PF2, WP2 | KBED | ARBID | Work Centre ID | S/4 HANA | KBED | ARBID | Work Centre ID | Use below logic :
|
| 4 | PF2, WP2 | KBED | SPLIT | Split Number | S/4 HANA | KBED | SPLIT | Split Number | DIrect Mapping |
| 5 | PF2, WP2 | KBED | PERNR | Personnel Number | S/4 HANA | KBED | PERNR | Personnel Number | Derive as per Value Mapping: Employee Personnel. |
| 6 | PF2, WP2 | KBEZ | ARBEI | Work | S/4 HANA | KBEZ | ARBEI | Work | DIrect Mapping |
| 7 | PF2, WP2 | KBEZ | ARBEH | Unit of Work | S/4 HANA | KBEZ | ARBEH | Unit of Work | DIrect Mapping |
| 8 | PF2, WP2 | KBEZ | DAUNO | Normal Duration | S/4 HANA | KBEZ | DAUNO | Normal Duration | DIrect Mapping |
| 9 | PF2, WP2 | KBEZ | DAUNE | Normal duration unit | S/4 HANA | KBEZ | DAUNE | Normal duration unit | DIrect Mapping |
13. Work Order Header Long Text Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | PF2, WP2 | AUFK | AUFNR | Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 12-digit work order number (e.g., '100000012345'), then TDNAME should be 10000000012345. |
| 3 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 4 | PF2, WP2 | STXH | TDSPRAS | Language Key | S/4HANA | STXH | TDSPRAS | Language Key | Derive Language Key (T001W-SPRAS) from Table T001W where S4 ARBPL-WERK (Plant for Work Center) = T001W-WERKS |
Note: Priority of Long Text to be given first to the Plant's default language followed by other language sorted by the language key.
14. Work Order Header Long Text Line Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | PF2, WP2 | AUFK | AUFNR | Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 12-digit work order number (e.g., '100000012345'), then TDNAME should be 10000000012345. |
| 3 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 4 | PF2, WP2 | STXH | TDSPRAS | Language Key | S/4HANA | STXH | TDSPRAS | Language Key | Derive Language Key (T001W-SPRAS) from Table T001W where S4 ARBPL-WERK (Plant for Work Center) = T001W-WERKS |
| 5 | PF2, WP2 | STXL | TDFORMAT | Tag column | S/4HANA | STXL | TDFORMAT | Tag column | Direct Mapping |
| 6 | PF2, WP2 | STXL | ROWCOUNT | Row number | S/4HANA | STXL | ROWCOUNT | Row number | Direct Mapping |
| 7 | PF2, WP2 | STXL | TXLINE | Text Line | S/4HANA | STXL | TXLINE | Text Line | Direct Mapping |
Note: Priority of Long Text to be given first to the Plant's default language followed by other language sorted by the language key.
15. Work Order Operation Long Text Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | PF2, WP2 | AFVC | AUFPL | Routing number of Operation in Order | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 10-digit AUFPL value (1001403027,), and the 8-digit APLZL value (00000002), then TDNAME should be 100100140302700000002. |
| 3 | PF2, WP2 | AFVC | APLZL | General counter for order | |||||
| 4 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'AVOT' | |
| 5 | PF2, WP2 | STXH | TDSPRAS | Language Key | S/4HANA | STXH | TDSPRAS | Language Key | Derive Language Key (T001W-SPRAS) from Table T001W where S4 ARBPL-WERK (Plant for Work Center) = T001W-WERKS |
Note: Priority of Long Text to be given first to the Plant's default language followed by other language sorted by the language key.
14. Work Order Header Long Text Line Transformation Rule (ECC)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | PF2, WP2 | AFVC | AUFPL | Routing number of Operation in Order | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 10-digit AUFPL value (1001403027,), and the 8-digit APLZL value (00000002), then TDNAME should be 100100140302700000002. |
| 3 | PF2, WP2 | AFVC | APLZL | General counter for order | |||||
| 3 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 4 | PF2, WP2 | STXH | TDSPRAS | Language Key | S/4HANA | STXH | TDSPRAS | Language Key | Derive Language Key (T001W-SPRAS) from Table T001W where S4 ARBPL-WERK (Plant for Work Center) = T001W-WERKS |
| 5 | PF2, WP2 | STXL | TDFORMAT | Tag column | S/4HANA | STXL | TDFORMAT | Tag column | Direct Mapping |
| 6 | PF2, WP2 | STXL | ROWCOUNT | Row number | S/4HANA | STXL | ROWCOUNT | Row number | Direct Mapping |
| 7 | PF2, WP2 | STXL | TXLINE | Text Line | S/4HANA | STXL | TXLINE | Text Line | Direct Mapping |
Note: Priority of Long Text to be given first to the Plant's default language followed by other language sorted by the language key.
15. Work Order Header Long Text Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 12-digit work order number (e.g., '100000012345'), then TDNAME should be 10000000012345. |
| 3 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 4 | DCT | STXH | TDSPRAS_EN | Language Key (English) | S/4HANA | STXH | TDSPRAS | Language Key | Default to 'E' |
UNION
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 12-digit work order number (e.g., '100000012345'), then TDNAME should be 10000000012345. |
| 3 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 4 | DCT | STXH | TDSPRAS_LC | Language Key (Local) | S/4HANA | STXH | TDSPRAS | Language Key | Direct Mapping |
16. Work Order Header Long Text Line Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 12-digit work order number (e.g., '100000012345'), then TDNAME should be 10000000012345. |
| 3 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 4 | DCT | STXH | TDSPRAS_EN | Language Key (English) | S/4HANA | STXH | TDSPRAS | Language Key | Default to 'E' |
| 5 | DCT | STXL | TDFORMAT | Tag column | S/4HANA | STXL | TDFORMAT | Tag column | Default to "*" |
| 7 | DCT | STXL | TDLINE_EN | Text Line (English) | S/4HANA | STXL | TXLINE | Text Line | Direct Mapping |
UNION
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 12-digit work order number (e.g., '100000012345'), then TDNAME should be 10000000012345. |
| 3 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 4 | DCT | STXH | TDSPRAS_LC | Language Key (Local) | S/4HANA | STXH | TDSPRAS | Language Key | Direct Mapping |
| 5 | DCT | STXL | TDFORMAT | Tag column | S/4HANA | STXL | TDFORMAT | Tag column | Default to "*" |
| 7 | DCT | STXL | TDLINE_LC | Text Line (Local Language) | S/4HANA | STXL | TXLINE | Text Line | Direct Mapping |
17. Work Order Operation Long Text Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 10-digit AUFPL value (1001403027,), and the 8-digit APLZL value (00000002), then TDNAME should be 100100140302700000002. |
| 3 | DCT | AFVC | zLegacyVORNR | Legacy Operation Number | |||||
| 4 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'AVOT' | |
| 5 | DCT | STXH | TDSPRAS_EN | Language Key (English) | S/4HANA | STXH | TDSPRAS | Language Key | Default to 'E' |
UNION
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 10-digit AUFPL value (1001403027,), and the 8-digit APLZL value (00000002), then TDNAME should be 100100140302700000002. |
| 3 | DCT | AFVC | zLegacyVORNR | Legacy Operation Number | |||||
| 4 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'AVOT' | |
| 5 | DCT | STXH | TDSPRAS_LC | Language Key (Local) | S/4HANA | STXH | TDSPRAS | Language Key | Direct Mapping |
18. Work Order Operation Long Text Line Transformation Rule (DCT)
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 10-digit AUFPL value (1001403027,), and the 8-digit APLZL value (00000002), then TDNAME should be 100100140302700000002. |
| 3 | DCT | AFVC | zLegacyVORNR | Legacy Operation Number | |||||
| 4 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 5 | DCT | STXH | TDSPRAS_EN | Language Key (English) | S/4HANA | STXH | TDSPRAS | Language Key | Default to 'E' |
| 5 | PF2, WP2 | STXL | TDFORMAT | Tag column | S/4HANA | STXL | TDFORMAT | Tag column | Default to "*" |
| 7 | PF2, WP2 | STXL | TDLINE_EN | Text Line (English) | S/4HANA | STXL | TXLINE | Text Line | Direct Mapping |
UNION
| Rule # | Source System | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | - | - | - | - | S/4HANA | STXH | TDOBJECT | Texts: Application object | Default to "AUFK" |
| 2 | DCT | AUFK | zLegacyAUFNR | Legacy Order Number | S/4HANA | STXH | TDNAME | Name | Concatenate - Client number (SAP System where data is being migrated) + E.g Client number (e.g., '100') followed by the 10-digit AUFPL value (1001403027,), and the 8-digit APLZL value (00000002), then TDNAME should be 100100140302700000002. |
| 3 | DCT | AFVC | zLegacyVORNR | Legacy Operation Number | |||||
| 4 | - | - | - | S/4HANA | STXH | TDID | Text ID | Default to 'KOPF' | |
| 5 | DCT | STXH | TDSPRAS_EN | Language Key (Local) | S/4HANA | STXH | TDSPRAS | Language Key | Default to 'E' |
| 5 | PF2, WP2 | STXL | TDFORMAT | Tag column | S/4HANA | STXL | TDFORMAT | Tag column | Default to "*" |
| 7 | PF2, WP2 | STXL | TDLINE_EN | Text Line (Local) | S/4HANA | STXL | TXLINE | Text Line | Direct Mapping |
List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
| Employee Personnel | Old Employee to Employee Business Partner |
| Equipment | Legacy/Staging to New Equipment |
| Functional Location | List of relevant Asset Functional Locations slated for migration, including the Target Technical Object. This will also be used for Old to New Functional Location Mapping |
| GL Account | Old to New GL Account |
| Maintenance Activity Type | Old to new Maintenance activity types |
| Material Group | MATKL: Old Material Group to New Material Group |
| Material Master | MATNR: Old to New Material No. |
| Notification | Old to new Notification |
| Plant | Old Plant to New Plant |
| Purchasing Group | EKGRP: Old Purchasing Group to New Purchasing Group |
| Purchasing Info Record Number | INFNR: Old Info Record number to New Info Record Number. |
| Purchasing Organization | EKORG: Old Purchasing Organization to New Purchasing Organization |
| Storage Location | Old to New Storage Location |
| Vendor Number | LIFNR: Old Vendor Code to New Vendor Code |
| WBS Element Number | POSID: Old WBS to new WBS mapping |
| Work Centre A2D (Old to New Mapping) | Old to new Work Centre A2D |
| Work Order | Old to New Work Order |
| Work Order Operation | Old to New Work Order Operation |
| Work Order Operation Control Type | Legacy to Target Work Order Operation Control Type |
| Work Order System Condition | Old to New WO System Condition |
| Work Order Type | Legacy to Target Work Order Type |
List of Transformation Mappings with additional details is maintained here: Transformation Mappings
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Ensure DCT tables completeness | SyWay Data Team |
| 2 | Ensure all Transformation mappings are up to date | SyWay Data Team |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Record Count | SyWay A2D Data Team to verify that the total number of relevant records from legacy systems and DCTs (if any) is equal to the total number of records in the Preload and Load Sheets. |
Verify Data Integrity | SyWay A2D Data Team to verify that the total number of Operations per Work Oder header extracted from legacy systems and DCTs (if any) should be equal to the total number of operations identified in the Preload and Load Sheets |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | SyWay A2D Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
Business
Completeness
| Task | Action |
|---|---|
Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from legacy systems and DCTs (if any) is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Obtain DCT Sign-off from Business | SyWay A2D Data Team |
| 2 | Syniti will provide load file | Syniti |
| 3 | Go to <Load Tool> | SyWay A2D Data Team/Syniti |
| 4 | Load 3 records for Work Order for function (IW31) to validate if data is loaded successfully without errors | SyWay A2D Data Team/Syniti |
| 5 | Proceed with full load if step 4 is validated | SyWay A2D Data Team/Syniti |
| 6 | Validate few records loaded by accessing standard transactions from S/4HNA E.g. IW39 | SyWay A2D Data Team/Syniti |
| 7 | Generate post load report if step 6 is validated | SyWay A2D Data Team/Syniti |
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
| 1 | Order Type |
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
9003 | Revision |
1030 | Work Centre |
1002 | Equipment |
1003 | Functional Location |
1026 | WBS - CAPEX, OPEX, Statistical |
1074 | Cost Centre |
1073 | Profit Centre |
3018 | Vendor |
2019 | Material |
1010 | Assembly |
1094 | Purchase Info Records (Including Pricing Conditions) |
1067 | GL Account Operational CoA (incl. secondary CE) |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Invalid Data | Invalid data (Based on master data) | Expedite whether the master data is available in the system |
Invalid Data | Invalid data (Based on non master data) | Review and analyses the errors. Take necessary action to correct the data if possible. |
Configuration | Invalid Order Type | Engage Functional team to expedite and fix the error in the system |
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Count | SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Reference Functional Location data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Business
Completeness
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Reference Functional Location data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Key Assumptions
- Data is in scope based on data design and any exception requested by business.
- Data cleansing has met the required percentage threshold for the specified mock cycle and all preparation activities have been completed
- No data enrichment is needed
- Based on discussion with the business - the User Status in legacy will not be migrated over to S4
- All Long Text will be migrated and defaulted to the language key of the plant
- Notification missing for legacy open Work Orders will be migrated and assigned to the respective target Work Orders. The Notification for this scenario will be migrated with header information copied from the Target Work Orders
See also