| Status | Update in progress |
|---|---|
| Owner | |
| Stakeholders |
Purpose
The purpose of this document is to define the conversion approach to create 1056 - Resources in S/4 HANA.
Resources are used to identify the production lines, equipment and all the machines related to the production execution process. Resources are the main data to be used to design the Master Recipes for all the Syensqo plants.
Conversion Scope
The scope of this document covers the approach for converting active 1056- Resources from Legacy Source Systems into S/4HANA following the Resource Master Data Design Standard.
Stand alone rules
The data from legacy system includes:
- Active Resources as of > four (4) years with history and/or included in active Recipes / Process Orders
- Resources W/O Deletion Flag
- Resources that will be migrated to the To-Be Plant Mapping (Take in consideration the To-Be definition of Plants
The data from legacy system excludes:
- Inactive Resources with more than Four (4) years.
- Resources marked for deletion
- Resources belonging to Deleted plants (New plant Definition according with the To-Be Plant mapping)
Relevancy rule
- Material/Plant with history and include active process orders - Materials defined via Status at global and Plant level (MARC/MARA)
- Defined materials which are recognised as active and contain 4 years process order history, these are then checked against active BOMS to define Master Recipe at Plant level
- Master Recipes defined as per the Material Master containing 4 years Process order History, define the Resource by Plant
Material Plant Active with Four years Process order History
defines Active BOMS by Plant
defines Active Master Recipe by Plant
Defines the Resource by Plant.
Plant Merging
Plants will be defined accordingly as some plants will be merged into one plant. Plants will be defined as NEW plant codes and be transformed via a transformation table, which will be contained in Syniti.
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
PF2, WP2 | Resources will be extracted from PF2 and WP2 | PF2 - 6096 WP2 - 9077 | S/4 HANA | PF2 - 6096 WP2 - 9077 |
Additional Information
Multi-language Requirement
English , French, Mandarin, Spanish, German, Italian, Brazilian Portuguese
Document Management
Legal Requirement
N/A
Special Requirements
N/a
N/a
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement | MDS Field Mapping in Scope | Field Value in MDS | |
|---|---|---|---|---|---|---|---|---|---|
| 1 | CRHD | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | In Scope | |
| 2 | CRHD | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 3 | CRHD | ARBPL | ARBPL | Work Center | CHAR | 8 | R | TBD | |
| 4 | CRHD | WERKS | WERKS_D | Plant | CHAR | 4 | R | TBD | |
| 5 | CRHD | VERWE | AP_VERWE | Work Center Category | CHAR | 4 | R | 0008 Processing Unit | |
| 6 | CRHD | PLANV | AP_PLANV | Key for task list usage | CHAR | 3 | R | 0008 Master Recipe + Process Order | |
| 7 | CRHD | STAND | AP_STAND | Work center location | CHAR | 10 | C | MFG Execution Config Register | |
| 8 | CRHD | VERAN | AP_VERAN | Person Responsible for the Work Center | CHAR | 3 | C | Copy from Legacy | |
| 9 | CRHD | VGWTS | VORGSCHL | Standard Value Key | CHAR | 4 | R | SAP9 | |
| 10 | CRHD | VGM01 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | Value taken from STD Value Key SAP9 - value entered should be 2 | |
| 11 | CRHD | VGM02 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | Value taken from STD Value Key SAP9 - value entered should be 2 | |
| 12 | CRHD | VGM03 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | Value taken from STD Value Key SAP9 - value entered should be 2 | |
| 13 | CRHD | VGM04 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | Value taken from STD Value Key SAP9 - value entered should be 2 | |
| 14 | CRHD | VGM05 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | NU | ||
| 15 | CRHD | VGM06 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | NU | ||
| 16 | CRHD | ZGR01 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 17 | CRHD | ZGR02 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 18 | CRHD | ZGR03 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 19 | CRHD | ZGR04 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 20 | CRHD | ZGR05 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 21 | CRHD | ZGR06 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 22 | CRHD | PRVBE | PRVBE | Production Supply Area | CHAR | 10 | C | ||
| 23 | CRHD | RGEKZ | RGEKZAP | Indicator: Backflushing | CHAR | 1 | C | ||
| 24 | CRHD | STEUS | STEUS | Control Key | CHAR | 4 | R | ||
| 25 | CRHD | VGE01 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | Value taken from STD Value Key SAP9 | |
| 26 | CRHD | VGE02 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | Value taken from STD Value Key SAP9 | |
| 27 | CRHD | VGE03 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | Value taken from STD Value Key SAP9 | |
| 28 | CRHD | VGE04 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | Value taken from STD Value Key SAP9 | |
| 29 | CRHD | VGE05 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | NU | ||
| 30 | CRHD | VGE06 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | NU | ||
| 31 | CRHD | FORT1 | AP_FORM_T1 | Formula for setup time | CHAR | 6 | C | ||
| 32 | CRHD | FORT2 | AP_FORM_T2 | Formula for the duration of processing time | CHAR | 6 | R | ||
| 33 | CRHD | FORT3 | AP_FORM_T3 | Formula for teardown time | CHAR | 6 | C | ||
| 34 | CRHD | FORTN | AP_FORM_TN | Formula for the duration of other types of int. processing | CHAR | 6 | NU | ||
| 35 | CRTX | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | ||
| 36 | CRTX | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 37 | CRTX | SPRAS | SPRAS | Language | CHAR | 1 | R | ||
| 38 | CRTX | KTEXT | CR_KTEXT | Short description | CHAR | 40 | R | ||
| 39 | CRCA | OBJTY | CR_OBJTY | Object Type | CHAR | 2 | S | ||
| 40 | CRCA | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 41 | CRCA | CANUM | CR_CAPNUM | Capacity allocation number | CHAR | 6 | S | TBD | |
| 42 | CRCA | FORK1 | AP_FORM_K1 | Formula for Setup Capacity Requirements | CHAR | 6 | R | ||
| 43 | CRCA | FORK2 | AP_FORM_K2 | Formula for Processing Capacity Requirements | CHAR | 6 | R | ||
| 44 | CRCA | FORK3 | AP_FORM_K3 | Formula for Teardown Capacity Requirements | CHAR | 6 | NU | ||
| 45 | CRCA | FORKN | AP_FORM_KN | Formula for Other Capacity Requirements | CHAR | 6 | NU | ||
| 46 | CRCA | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 47 | KAKT | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 48 | KAKT | SPRAS | SPRAS | Language | CHAR | 1 | R | ||
| 49 | KAKT | KTEXT | CR_KTEXT | Capacity Text | CHAR | 40 | R | ||
| 50 | CRCO | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | ||
| 51 | CRCO | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 52 | CRCO | LASET | #N/A | Activity Type Set | CHAR | 6 | S | ||
| 53 | CRCO | ENDDA | ENDDATUM | End Date | DATS | 8 | R | 31/12/9999 | |
| 54 | CRCO | BEGDA | BEGDATUM | Start Date | DATS | 8 | R | ||
| 55 | CRCO | KOKRS | KOKRS | CO Area | CHAR | 4 | R | ||
| 56 | CRCO | KOSTL | KOSTL | Cost Center | CHAR | 10 | R | ||
| 57 | CRCO | LSTAR1 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 58 | CRCO | LEINH1 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 59 | CRCO | FORML1 | FORML | Formula key for costing | CHAR | 6 | R | Value taken from STD Value Key SAP9 | |
| 60 | CRCO | LSTAR2 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 61 | CRCO | LEINH2 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 62 | CRCO | FORML2 | FORML | Formula key for costing | CHAR | 6 | R | Value taken from STD Value Key SAP9 | |
| 63 | CRCO | LSTAR3 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 64 | CRCO | LEINH3 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 65 | CRCO | FORML3 | FORML | Formula key for costing | CHAR | 6 | R | Value taken from STD Value Key SAP9 | |
| 66 | CRCO | LSTAR4 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 67 | CRCO | LEINH4 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 68 | CRCO | FORML4 | FORML | Formula key for costing | CHAR | 6 | R | Value taken from STD Value Key SAP9 | |
| 69 | CRCO | LSTAR5 | LSTAR | Activity Type | CHAR | 6 | NU | ||
| 70 | CRCO | LEINH5 | LEINH | Activity Unit | UNIT | 3 | NU | ||
| 71 | CRCO | FORML5 | FORML | Formula key for costing | CHAR | 6 | NU | ||
| 72 | CRCO | LSTAR6 | LSTAR | Activity Type | CHAR | 6 | NU | ||
| 73 | CRCO | LEINH6 | LEINH | Activity Unit | UNIT | 3 | NU | ||
| 74 | CRCO | FORML6 | FORML | Formula key for costing | CHAR | 6 | NU | ||
| 75 | CRCO | LANUM | CR_LANUM | Activity type number within a set | NUMC | 4 | NU | ||
| 76 | KAKO | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 77 | KAKO | AZMAX | KAPANZAHL | No. Ind. Capacities | INT2 | 5 | NU | ||
| 78 | KAKO | AZNOR | KAPANZAHL | No. Ind. Capacities | INT2 | 5 | R | ||
| 79 | KAKO | BASNE | KAPBASNEN | Denominator base cap | DEC | 5 | S | ||
| 80 | KAKO | BASZL | KAPBASZHL | Numerator base cap. | DEC | 5 | S | ||
| 81 | KAKO | BEGZT | KAPBEGZT | Start Time | INT4 | 10 | R | ||
| 82 | KAKO | ENDZT | KAPENDZT | End Time | INT4 | 10 | R | ||
| 83 | KAKO | KALID | CR_WFCID | Factory Calendar | CHAR | 2 | C | ||
| 84 | KAKO | KAPAR | KAPART | Capacity category | CHAR | 3 | R | ||
| 85 | KAKO | MEINS | KAPBASIS | Capacity Base Unit | UNIT | 3 | R | ||
| 86 | KAKO | MOSID | SCHGRUP | Shift Grouping | CHAR | 2 | C | ||
| 87 | KAKO | NAME | KAPNAME | Capacity | CHAR | 8 | NU | ||
| 88 | KAKO | NGRAD | NUTZGRAD | Capacity Utilization | NUMC | 3 | R | ||
| 89 | KAKO | PAUSE | KAPPAUSE | Break Duration | INT4 | 10 | R | ||
| 90 | KAKO | PLANR | KAPPLANER | Capacity Responsible Planner | CHAR | 3 | R | ||
| 91 | KAKO | POOLK | KAP_KZPOOL | Pooled Capacity Indicator | CHAR | 1 | C | ||
| 92 | KAKO | REFAN | KAPREFANZN | Number (ref. cap.) | INT1 | 3 | C | Not used because it is only used if you are going to do a new creation once we are live | |
| 93 | KAKO | REFAZ | KAPREFANZZ | Number (capacity) | INT1 | 3 | C | Not used because it is only used if you are going to do a new creation once we are live | |
| 94 | KAKO | REFID | KAPID | Capacity ID | NUMC | 8 | C | Not used because it is only used if you are going to do a new creation once we are live | |
| 95 | KAKO | SUPPK | KAP_SUPPLY | Avail. cap. limits | CHAR | 1 | C (if not entered, 100% will be the default) | ||
| 96 | KAKO | VERSA | KAPVERSAKT | Active Version | NUMC | 2 | R | ||
| 97 | KAKO | WERKS | WERKS_D | Plant | CHAR | 4 | NU | ||
| 98 | KAKO | KAPIE | KAPID | Capacity ID | NUMC | 8 | NU | ||
| 99 | KAKO | KAPTER | KAP_KZTER | Relevant to Finite Scheduling | CHAR | 1 | C | ||
| 100 | KAKO | KAPAVO | KAP_KZAVO | Can be used by several operations | CHAR | 1 | C | ||
| 101 | KAKO | UEBERLAST | UEBERLAST | Overload (%) | NUMC | 3 | C | ||
| 102 | KAKO | KAPLPL | KAP_KZLPL | No Long-Term Planning | CHAR | 1 | C | ||
| 103 | KAKO | KAPEH | CR_KAPEH | Capacity Unit | UNIT | 3 | NU | ||
| 104 | KAKO | MEHR | KAP_MEHR | Has Individual Capacities | CHAR | 1 | NU | ||
| 105 | KAKO | ANG_UNIT | KAPAZIT_VM_UNIT | Av. cap. unit | UNIT | 3 | C | NU - CFC9 manages it through APO without the need to update manually the fields are not required for ADM | |
| 106 | KAKO | ANG_MIN | KAPAZIT_VM_MIN | Minimum capacity | QUAN | 13 | C | NU - CFC9 manages it through APO without the need to update manually the fields are not required for ADM | |
| 107 | KAKO | ANG_MAX | KAPAZIT_VM_MAX | Max. capacity | QUAN | 13 | C | NU - CFC9 manages it through APO without the need to update manually the fields are not required for ADM |
Data Cleansing
Business will perform data cleansing in the current ECC system. This means ECC will serve as the single source of truth for Manufacturing Data prior to the migration to S/4HANA.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 1056-1 | C1 | Resource is not used for the last 4 years | All Resources not used for the last 4 years, won't be migrated | Active Resources during the last 4 years | PF2 /WP2 |
| 1056-2 | C1 | Resource is flagged for deletion | All Resources flagged for deletion won't be migrated | Resources with NO flag for deletion | PF2/WP2 |
| 1056-3 | C1 | Resources in Plants that are Out of Scope | Resources created in Plants Out of Scope won't be migrated | Resources valid in Active plants (To Be mapping) | PF2/WP2 |
| 1056-4 | C1 | Resources with No formulas for capacity, scheduling or costing | Resources with missing capacity, Scheduling and costing formulas won't be migrated | Only Resources with all formulas will be migrated | PF2/WP2 |
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into . There are 2 possibilities:
- The data exists. connects to the source and loads the data into . There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | SyWay Data Team |
| 2 | Google Sheet/ MS Excel/ SQL report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. | SyWay Data Team |
| 3 | Sinity will extract data and convert it into SQL data base ad share with the team | Sinity team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT1 - 1056 Resource Header Page
Field Name | Field description | Rule | Mappings |
| CRHD-KAPID | Capacity ID | ID to identify the capacity header | System Generated Field |
| Data Type: Numeric | |||
| Length: 8 | |||
| CRHD-ARBPL | Work Center | Represents a machine, group of machines, production line or a person assigned to an operation | Value Mapping from A to B for Resource ID by plant |
| Data Type: Character | |||
| Length: 8 | |||
| CRHD-WERKS | Plant | Key uniquely identifying a plant | Map from Old Plants to New Plants |
| Data Type: Character | |||
| Length: 4 | |||
| CRHD-VERWE | Work Center Category | Key differentiating resources according to their category (e.g. resource network, process unit) | Default Value - 0008 |
| Data Type: Character | |||
| Length: 4 | |||
| CRHD-PLANV | Key for task list usage | Controls which type of tasks list are allowed to use this resource | Copy from DCT |
| Data Type: Character | |||
| Length: 3 | |||
| CRHD-STAND | Work center location | Represents the physical location of the resource | Copy from DCT |
| Data Type: Character | |||
| Length: 10 | |||
| CRHD-VERAN | Person Responsible for the Work Center | The person or group of people who are responsible for the maintenance of the resource - Useful for Reporting purposes | Copy from DCT |
| Data Type: Character | |||
| Length: 3 | |||
| CRHD-VGWTS | Standard Value Key | The system uses standard values as parameters with origin "standard value" in formulas to calculate execution time, capacity requirements and costs | Default Value - SAP9 |
| Data Type: Character | |||
| Length: 4 | |||
| CRHD-VGM01 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) | Default Value - 2 |
| Data Type: Character | |||
| Length: 1 | |||
| CRHD-VGM02 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) | Default Value - 2 |
| Data Type: Character | |||
| Length: 1 | |||
| CRHD-VGM03 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) | Default Value - 2 |
| Data Type: Character | |||
| Length: 1 | |||
| CRHD-VGM04 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) | Default Value - 2 |
| Data Type: Character | |||
| Length: 1 | |||
| CRHD-PRVBE | Production Supply Area | Serves as a place for interim storage on the shop floor and is used to make material directly available for production purposes | Because the warehouse can support holding stock that belongs to more than one plant, the PP PSA is replicated to EWM by adding the plant number preceded by a "/" to be able to tell in the warehouse to which plant the original PSA belongs. - Value Mapping |
| Will be used for EWM flows | |||
| Data Type: Character | |||
| Length: 10 | |||
| CRHD-RGEKZ | Indicator: Backflushing | Indicates that material components allocated to the operation are backflushed | Copy from DCT |
| Data Type: Character | |||
| Length: 1 | |||
| CRHD-STEUS | Control Key | Determines which business transactions should be executed for the object that belongs to the task list or order (for example scheduling or costing). | Copy from DCT |
| Data Type: Character | |||
| Length: 4 | |||
| CRHD-VGE01 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value | Value automatically to be taken from VGWTS - STD value key |
| Data Type: Unit | |||
| Length: 3 | |||
| CRHD-VGE02 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value | Value automatically to be taken from VGWTS - STD value key |
| Data Type: Unit | |||
| Length: 3 | |||
| CRHD-VGE03 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value | Value automatically to be taken from VGWTS - STD value key |
| Data Type: Unit | |||
| Length: 3 | |||
| CRHD-VGE04 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value | Value automatically to be taken from VGWTS - STD value key |
| Data Type: Unit | |||
| Length: 3 | |||
| CRHD-FORT1 | Formula for setup time | Formula used in scheduling to calculate the setup time of an operation | Default Value - SAP001 |
| Data Type: Character | |||
| Length: 6 | |||
| CRHD-FORT2 | Formula for the duration of processing time | Formula used in scheduling to determine the operation processing time | Default Value - SAP002 |
| Data Type: Character | |||
| Length: 6 | |||
| CRHD-FORT3 | Formula for teardown time | Formula used in scheduling to determine teardown time in an operation | Default Value - SAP010 |
| Data Type: Character | |||
| Length: 6 | |||
DCT2 - 1056 Resource Description |
|
|
|
Field Name | Field description | Rule | Mappings |
| CRHD-ARBPL | Work Center | Represents a machine, group of machines, production line or a person assigned to an operation | Value Mapping from A to B for Resource ID by plant |
| Data Type: Character | |||
| Length: 8 | |||
| CRTX-KTEXT | Short description | Contains a brief description of the resource | Copy from DCT |
| Data Type: Character | |||
| Length: 40 | |||
| CRTX-SPRAS | Language | Language | Copy from DCT |
| Data Type: Character | |||
| Length: 1 | |||
DCT3 - 1056 Resource Cost Center |
|
|
|
Field Name | Field description | Rule | Mappings |
| CRHD-ARBPL | Work Center | Represents a machine, group of machines, production line or a person assigned to an operation | Value Mapping from A to B for Resource ID by plant |
| Data Type: Character | |||
| Length: 8 | |||
| CRCO-ENDDA | End Date | date that identifies the end of the validity period | Default Value - 31/12/9999 |
| Data Type: Date Field | |||
| Length: 8 DD/MM/YYYY | |||
| CRCO-BEGDA | Start Date | date that identifies the start of a validity period | Copy from DCT |
| Data Type: Date Field | |||
| Length: 8 DD/MM/YYYY | |||
| CRCO-LASET | Activity Type Set | Activity Type Set | System Generated Field |
| Data Type: Character | |||
| Length: 6 | |||
| CRCO-KOKRS | CO Area | An organizational unit within an enterprise for which a complete cost accounting can be performed within a closed system | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| Data Type: Character | |||
| Length: 4 | |||
| CRCO-KOSTL | Cost Center | Represents a delimited location where costs occur | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| Data Type: Character | |||
| Length: 10 | |||
| CRCO-LSTAR | Activity Type | Activity types describe the activity produced by a cost center and are measured in units of time or quantity | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| Data Type: Character | |||
| Length: 6 | |||
| CRCO-LEINH | Activity Unit | The activity unit is either the time or quantity unit used to post the consumed activity quantities | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| Data Type: Unit | |||
| Length: 3 | |||
| CRCO-FORML | Formula key for costing | Refers to the formula used for Calculation of costs of a work center's activity type | for LANUM 001 Then -> Default Value - SAP001 |
| Data Type: Character | |||
| Length: 6 | |||
| CRCO-LANUM | Activity type number within a set | Activity type number within a set | NU not used (Value to be entered into the DCT) |
| Data Type: NUMC | |||
| Length: 4 | |||
DCT4 - 1056 Resource Capacity Header Segment |
|
|
|
Field Name | Field description | Rule | Mappings |
| CRHD-ARBPL | Work Center | Represents a machine, group of machines, production line or a person assigned to an operation | Value Mapping from A to B for Resource ID by plant |
| Data Type: Character | |||
| Length: 8 | |||
| KAKO-KAPID | Capacity ID | ID to identify the capacity header | System Generated Field |
| Data Type: Numeric | |||
| Length: 8 | |||
| KAKO-AZNOR | No. Ind. Capacities | Number of individual capacities | Copy from DCT |
| Data Type: Decimal | |||
| Length: 5 | |||
| KAKO-BEGZT | Start Time | Start time in seconds (internal) | Copy from DCT |
| Data Type: Integer 4 | |||
| Length: 10 | |||
| KAKO-ENDZT | End Time | Finish time in seconds (internal) | Copy from DCT |
| Data Type: Integer 4 | |||
| Length: 10 | |||
| KAKO-KALID | Factory Calendar | Factory calendar ID | The calendar used is the one assigned to the plant or it's a calendar defined in the same country - Factory Calendar under TM team to define the values, Value Mapping table from A to B Copy from DCT |
| Data Type: Character | |||
| Length: 2 | |||
| KAKO-KAPAR | Capacity category | Capacity category | Copy from DCT |
| Data Type: Character | |||
| Length: 3 | |||
| KAKO-KAPAVO | Can be used by several operations | Indicator: Several operations can use capacity | Default Value - X |
| Data Type: Character | |||
| Length: 1 | |||
| KAKO-KAPLPL | No Long-Term Planning | Indicator: Capacity excluded from long-term planning | Default Value - X |
| Data Type: Character | |||
| Length: 1 | |||
| KAKO-KAPTER | Relevant to Finite Scheduling | Indicator: Capacity relevant to finite scheduling | Default Value - X |
| Data Type: Character | |||
| Length: 1 | |||
| KAKO-MEINS | Capacity Base Unit | Base Unit of Measurement for Capacity | Copy from DCT |
| Data Type: Unit | |||
| Length: 3 | |||
| KAKO-MOSID | Shift Grouping | Grouping for Shift Definitions and Shift Sequences | Copy from DCT |
| Data Type: Character | |||
| Length: 2 | |||
| KAKO-NGRAD | Capacity Utilization | Capacity utilization rate (percent) | Copy from DCT |
| Data Type: Numeric | |||
| Length: 3 | |||
| KAKO-PAUSE | Break Duration | Cumulative break time in seconds (internal) | Copy from DCT |
| Data Type: Integer 4 | |||
| Length: 10 | |||
| KAKO-PLANR | Capacity Responsible Planner | Capacity planner group | Copy from DCT |
| Data Type: Character | |||
| Length: 3 | |||
| KAKO-SUPPK | Avail. cap. limits | Available capacity limits | Copy from DCT |
| Data Type: Character | |||
| Length: 1 | |||
| KAKO-UEBERLAST | Overload (%) | Overload Capacity | Copy from DCT |
| Data Type: Numeric | |||
| Length: 3 | |||
| KAKO-VERSA | Active Version | Active version of available capacity | Copy from DCT |
| Data Type: Numeric | |||
| Length: 2 | |||
DCT5 - 1056 Resource Description |
|
|
|
Field Name | Field description | Rule | Mappings |
| KAKT-KAPID | Capacity ID | ID to identify the capacity header | System Generated Field |
| Data Type: Numeric | |||
| Length: 8 | |||
| KAKT-SPRAS | Language | Language of the text displayed | Copy from DCT |
| Data Type: Character | |||
| Length: 1 | |||
| KAKT-KTEXT | Capacity Text | Description of Capacity | Copy from DCT |
| Data Type: Character | |||
| Length: 40 | |||
DCT5 - 1056 Resource Capacity Allocation |
|
|
|
Field Name | Field description | Rule | Mappings |
| CRCA-KAPID | Capacity ID | ID to identify the capacity header | System Generated Field |
| Data Type: Numeric | |||
| Length: 8 | |||
| CRCA-CANUM | Capacity allocation number | Capacity allocation number | System Generated Field |
| Data Type: Character | |||
| Length: 6 | |||
| CRCA-FORK1 | Formula for Setup Capacity Requirements | Formula for Setup Capacity Requirements | |
| Data Type: Character | |||
| Length: 6 | |||
| CRCA-FORK2 | Formula for Processing Capacity Requirements | Formula for Processing Capacity Requirements | |
| Data Type: Character | |||
| Length: 6 |
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Source System Availability
| Syensqo IT |
| 2 | Data Structure
| Syniti |
| 3 | Referential Integrity
| Syniti |
| 4 | Extraction Methodology
| Syniti |
| 5 | Performance and Scalability Considerations
| Syniti |
| 6 | Security and Compliance
| Syniti |
| 7 | Data cleansing of legacy Resource - If standardization within the DCT begins using relevant data from PF2 and WP2 before the cleansing is finalized, it is understood that the business will take due diligence to ensure any subsequent delta cleansing is verified and aligned within the DCT. | Business |
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Obtain DCT Sign-off from Business | SyWay Data Team |
| 2 | <Add steps from Syniti Migrate here> | SyWay Data Team |
| 3 | Review and Validate Error and Preload Reports | SyWay Data Team |
| 4 | Generate Load Files | SyWay Data Team |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2/WP2 | CRHD | OBJTY | Object type | S4 HANA | CRHD | OBJTY | Object type | System Generated Field |
| 2 | PF2/WP2 | CRHD | OBJID | Object ID | S4 HANA | CRHD | OBJID | Object ID | System Generated Field |
| 3 | PF2/WP2 | CRHD | ARBPL | Resource ID | S4 HANA | CRHD | ARBPL | Resource ID | Value Mapping from A to B for Resource ID by plant |
| 4 | PF2/WP2 | CRHD | WERKS | Plant | S4 HANA | CRHD | WERKS | Plant | Map from Old Plants to New Plants |
| 5 | PF2/WP2 | CRHD | VERWE | Work Center Category | S4 HANA | CRHD | VERWE | Work Center Category | VALUE 0008 |
| 6 | PF2/WP2 | CRHD | PLANV | Key for task list usage | S4 HANA | CRHD | PLANV | Key for task list usage | Value Direct from the current system |
| 7 | PF2/WP2 | CRHD | STAND | Work Center location | S4 HANA | CRHD | STAND | Work Center location | Copy from Legacy |
| 8 | PF2/WP2 | CRHD | VERAN | Person Responsible for the Work Center | S4 HANA | CRHD | VERAN | Copy from Legacy | |
| 9 | PF2/WP2 | CRHD | VGWTS | Standard Value Key | S4 HANA | CRHD | VGWTS | Standard Value Key | Follow Mfg Execution Config book (one standard value key for all resources / all GBUs) Value - SAP9 |
| 10 | PF2/WP2 | CRHD | VGM01 | Rule for standard value maintenance | S4 HANA | CRHD | VGM01 | Rule for standard value maintenance | Value automatically to be taken from VGWTS - STD value key (Value entered should be 2) |
| 11 | PF2/WP2 | CRHD | VGM02 | Rule for standard value maintenance | S4 HANA | CRHD | VGM02 | Rule for standard value maintenance | Value automatically to be taken from VGWTS - STD value key (Value entered should be 2) |
| 12 | PF2/WP2 | CRHD | VGM03 | Rule for standard value maintenance | S4 HANA | CRHD | VGM03 | Rule for standard value maintenance | Value automatically to be taken from VGWTS - STD value key (Value entered should be 2) |
| 13 | PF2/WP2 | CRHD | VGM04 | Rule for standard value maintenance | S4 HANA | CRHD | VGM04 | Rule for standard value maintenance | Value automatically to be taken from VGWTS - STD value key (Value entered should be 2) |
| 14 | PF2/WP2 | CRHD | PRVBE | Production Supply Area | S4 HANA | CRHD | PRVBE | Production Supply Area | Business Rule Because the warehouse can support holding stock that belongs to more than one plant, the PP PSA is replicated to EWM by adding the plant number preceded by a "/" to be able to tell in the warehouse to which plant the original PSA belongs. - Value Mapping |
| 15 | PF2/WP2 | CRHD | RGEKZ | Indicator: Backflushing | S4 HANA | CRHD | RGEKZ | Indicator: Backflushing | Business Rule If all components used at a machine/line should be automatically issued at confirmation - Copy from Legacy |
| 16 | PF2/WP2 | CRHD | STEUS | Control Key | S4 HANA | CRHD | STEUS | Control Key | Mandatory Direct from the current system |
| 17 | PF2/WP2 | CRHD | VGE01 | Unit of measure for the standard value | S4 HANA | CRHD | VGE01 | Unit of measure for the standard value | NU - Value automatically to be taken from VGWTS - STD value key |
| 18 | PF2/WP2 | CRHD | VGE02 | Unit of measure for the standard value | S4 HANA | CRHD | VGE02 | Unit of measure for the standard value | NU - Value automatically to be taken from VGWTS - STD value key |
| 19 | PF2/WP2 | CRHD | VGE03 | Unit of measure for the standard value | S4 HANA | CRHD | VGE03 | Unit of measure for the standard value | NU - Value automatically to be taken from VGWTS - STD value key |
| 20 | PF2/WP2 | CRHD | VGE04 | Unit of measure for the standard value | S4 HANA | CRHD | VGE04 | Unit of measure for the standard value | NU - Value automatically to be taken from VGWTS - STD value key |
| 21 | PF2/WP2 | CRHD | FORT1 | Formula for setup time | S4 HANA | CRHD | FORT1 | Formula for setup time | Standard Formula SAP001 |
| 22 | PF2/WP2 | CRHD | FORT2 | Formula for the duration of processing time | S4 HANA | CRHD | FORT2 | Formula for the duration of processing time | Standard Formula SAP002 |
| 23 | PF2/WP2 | CRHD | FORT3 | Formula for teardown time | S4 HANA | CRHD | FORT3 | Formula for teardown time | Standard Formula SAP010 |
| 24 | PF2/WP2 | CRTX | OBJTY | Object type | S4 HANA | CRTX | OBJTY | Object type | System Generated Field |
| 25 | PF2/WP2 | CRTX | OBJID | Object ID | S4 HANA | CRTX | OBJID | Object ID | System Generated Field |
| 26 | PF2/WP2 | CRTX | SPRAS | Language | S4 HANA | CRTX | SPRAS | Language | Value direct from the current SAP system, Languages will need to be configured, mostly set as EN (Language which the Resource is maintained) |
| 27 | PF2/WP2 | CRTX | KTEXT | Short description | S4 HANA | CRTX | KTEXT | Short description | Copy from Legacy |
| 28 | PF2/WP2 | CRCA | OBJTY | Object Type | S4 HANA | CRCA | OBJTY | Object Type | System Generated Field |
| 29 | PF2/WP2 | CRCA | OBJID | Object ID | S4 HANA | CRCA | OBJID | Object ID | System Generated Field |
| 30 | PF2/WP2 | CRCA | CANUM | Capacity allocation number | S4 HANA | CRCA | CANUM | Capacity allocation number | System Generated Field |
| 31 | PF2/WP2 | CRCA | KAPID | Capacity ID | S4 HANA | CRCA | KAPID | Capacity ID | System Generated Field |
| 32 | PF2/WP2 | CRCA | FORK1 | Formula for Processing Capacity Requirements | S4 HANA | CRCA | FORK1 | Formula for Processing Capacity Requirements | |
| 33 | PF2/WP2 | CRCA | FORK2 | Formula for Teardown Capacity Requirements | S4 HANA | CRCA | FORK2 | Formula for Teardown Capacity Requirements | |
34 | PF2/WP2 | KAKT | KAPID | Capacity ID | S4 HANA | KAKT | KAPID | Capacity ID | System Generated Field |
| 35 | PF2/WP2 | KAKT | SPRAS | Language | S4 HANA | KAKT | SPRAS | Language | Value direct from the current SAP system, Languages will need to be configured, mostly set as EN (Language which the Capacity is maintained) |
| 36 | PF2/WP2 | KAKT | KTEXT | Capacity Text | S4 HANA | KAKT | KTEXT | Capacity Text | Copy From Legacy |
| 37 | PF2/WP2 | CRCO | OBJTY | Object type | S4 HANA | CRCO | OBJTY | Object type | System Generated Field |
| 38 | PF2/WP2 | CRCO | OBJID | Object ID | S4 HANA | CRCO | OBJID | Object ID | System Generated Field |
| 39 | PF2/WP2 | CRCO | LASET | Activity Type Set | S4 HANA | CRCO | LASET | Activity Type Set | System Generated Field |
| 40 | PF2/WP2 | CRCO | ENDDA | End Date | S4 HANA | CRCO | ENDDA | End Date | End date has value set to 31/12/9999 |
| 41 | PF2/WP2 | CRCO | BEGDA | Start Date | S4 HANA | CRCO | BEGDA | Start Date | Date value setting DD.MM.YYYY Copy from current system |
| 42 | PF2/WP2 | CRCO | KOKRS | CO Area | S4 HANA | CRCO | KOKRS | CO Area | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 43 | PF2/WP2 | CRCO | KOSTL | Cost Center | S4 HANA | CRCO | KOSTL | Cost Center | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 44 | PF2/WP2 | CRCO | LSTAR1 | Activity Type | S4 HANA | CRCO | LSTAR1 | Activity Type | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 45 | PF2/WP2 | CRCO | LEINH1 | Activity Unit | S4 HANA | CRCO | LEINH1 | Activity Unit | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 46 | PF2/WP2 | CRCO | FORML1 | Formula key for costing | S4 HANA | CRCO | FORML1 | Formula key for costing | NU - Value automatically to be taken from VGWTS - STD value Value - SAP001 |
| 47 | PF2/WP2 | CRCO | LSTAR2 | Activity Type | S4 HANA | CRCO | LSTAR2 | Activity Type | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 48 | PF2/WP2 | CRCO | LEINH2 | Activity Unit | S4 HANA | CRCO | LEINH2 | Activity Unit | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 49 | PF2/WP2 | CRCO | FORML2 | Formula key for costing | S4 HANA | CRCO | FORML2 | Formula key for costing | NU - Value automatically to be taken from VGWTS - STD value Value - SAP002 |
| 50 | PF2/WP2 | CRCO | LSTAR3 | Activity Type | S4 HANA | CRCO | LSTAR3 | Activity Type | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 51 | PF2/WP2 | CRCO | LEINH3 | Activity Unit | S4 HANA | CRCO | LEINH3 | Activity Unit | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 52 | PF2/WP2 | CRCO | FORML3 | Formula key for costing | S4 HANA | CRCO | FORML3 | Formula key for costing | NU - Value automatically to be taken from VGWTS - STD value Value - SAP003 |
| 53 | PF2/WP2 | CRCO | LSTAR4 | Activity Type | S4 HANA | CRCO | LSTAR4 | Activity Type | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 54 | PF2/WP2 | CRCO | LEINH4 | Activity Unit | S4 HANA | CRCO | LEINH4 | Activity Unit | This is Part of DCT in the Cost centre Conversion Spec - Value Mapping |
| 55 | PF2/WP2 | CRCO | FORML4 | Formula key for costing | S4 HANA | CRCO | FORML4 | Formula key for costing | NU - Value automatically to be taken from VGWTS - STD value Value - SAP010 |
| 56 | PF2/WP2 | KAKO | KAPID | Capacity ID | S4 HANA | KAKO | KAPID | Capacity ID | System Generated |
| 57 | PF2/WP2 | KAKO | AZNOR | No. Ind. Capacities | S4 HANA | KAKO | AZNOR | No. Ind. Capacities | Copy From ECC |
| 58 | PF2/WP2 | KAKO | BASNE | Denominator base cap | S4 HANA | KAKO | BASNE | Denominator base cap | System Generated |
| 59 | PF2/WP2 | KAKO | BASZL | Numerator base cap. | S4 HANA | KAKO | BASZL | Numerator base cap. | System Generated |
| 60 | PF2/WP2 | KAKO | BEGZT | Start Time | S4 HANA | KAKO | BEGZT | Start Time | Copy From ECC |
| 61 | PF2/WP2 | KAKO | ENDZT | End Time | S4 HANA | KAKO | ENDZT | End Time | Copy From ECC |
| 62 | PF2/WP2 | KAKO | KALID | Factory Calendar | S4 HANA | KAKO | KALID | Factory Calendar | Conditional : Business Rule Assign the correct Factory Calendar to the resource. If left blank, the system will use directly the plant factory calendar by default The calendar used is the one assigned to the plant or it's a calendar defined in the same country - Factory Calendar under TM team to define the values, Value Mapping table from A to B |
| 63 | PF2/WP2 | KAKO | KAPAR | Capacity category | S4 HANA | KAKO | KAPAR | Capacity category | Copy From ECC |
| 64 | PF2/WP2 | KAKO | MEINS | Capacity Base Unit | S4 HANA | KAKO | MEINS | Capacity Base Unit | Copy From ECC |
| 65 | PF2/WP2 | KAKO | MOSID | Shift Grouping | S4 HANA | KAKO | MOSID | Shift Grouping | Copy values by plant from Legacy |
| 66 | PF2/WP2 | KAKO | NGRAD | Capacity Utilization | S4 HANA | KAKO | NGRAD | Capacity Utilization | Copy From ECC |
| 67 | PF2/WP2 | KAKO | PAUSE | Break Duration | S4 HANA | KAKO | PAUSE | Break Duration | Copy From ECC |
| 68 | PF2/WP2 | KAKO | PLANR | Capacity Responsible Planner | S4 HANA | KAKO | PLANR | Capacity Responsible Planner | Copy From ECC |
| 69 | PF2/WP2 | KAKO | POOLK | Pooled Capacity Indicator | S4 HANA | KAKO | POOLK | Pooled Capacity Indicator | System Generated |
| 70 | PF2/WP2 | KAKO | SUPPK | Avail. cap. limits | S4 HANA | KAKO | SUPPK | Avail. cap. limits | Conditional: Business Rule If not entered 100% capacity will be used by default in the system - Copy from ECC |
| 71 | PF2/WP2 | KAKO | VERSA | Active Version | S4 HANA | KAKO | VERSA | Active Version | Copy From ECC |
| 72 | PF2/WP2 | KAKO | KAPTER | Relevant to Finite Scheduling | S4 HANA | KAKO | KAPTER | Relevant to Finite Scheduling | Always set to X |
| 73 | PF2/WP2 | KAKO | KAPAVO | Can be used by several operations | S4 HANA | KAKO | KAPAVO | Can be used by several operations | Always set to X |
| 74 | PF2/WP2 | KAKO | UEBERLAST | Overload (%) | S4 HANA | KAKO | UEBERLAST | Overload (%) | Copy from ECC |
| 75 | PF2/WP2 | KAKO | KAPLPL | No Long-Term Planning | S4 HANA | KAKO | KAPLPL | No Long-Term Planning | Always set to X |
| 76 | PF2/WP2 | KAKO | ANG_UNIT | Av. cap. unit | S4 HANA | KAKO | ANG_UNIT | Av. cap. unit | NU - CFC9 manages it through APO without the need to update manually the fields are not required for ADM |
| 77 | PF2/WP2 | KAKO | ANG_MIN | Minimum capacity | S4 HANA | KAKO | ANG_MIN | Minimum capacity | NU -CFC9 manages it through APO without the need to update manually the fields are not required for ADM |
| 78 | PF2/WP2 | KAKO | ANG_MAX | Max. capacity | S4 HANA | KAKO | ANG_MAX | Max. capacity | NU -CFC9 manages it through APO without the need to update manually the fields are not required for ADM |
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
| Work Centre | Mapping of legacy Work Center to new Work Centers to target system value |
| Plant | Mapping of legacy Plants to new Plants to target system value |
| Standard Value Key | Mapping of legacy Standard Value Key to new Standard Value Key to target system value |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Ensure DCT tables completeness | SyWay Data Team |
2 | Value Mappings are according to the latest design - <List of Value Mappings> | SyWay Data Team |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
| Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | SyWay Data Team to verify that all fields below meet pass the checks:
|
| Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
Business
Completeness
| Task | Action |
|---|---|
| Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Go to <Load Tool> | SyWay Data Team |
| 2 | Load 3 records for < > to validate if data is loaded successfully without errors | SyWay Data Team |
| 3 | Proceed with full load if steps 2 and 3 are validated | SyWay Data Team |
| 4 | Validate few records loaded by accessing standard transactions from S/4HNA eg. CS04 | SyWay Data Team |
| 5 | Generate post load report if step 5 is validated | SyWay Data Team |
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
| 1 | T001W-Plants/Branches |
| 2 | TC30-Work Centre Category |
| 3 | TC23-Key for use of the work center in the task lists |
| 4 | T499S-Work Centre Location |
| 5 | TC24-Person responsible for the work center |
| 6 | TC21-Standard Value Key |
| 7 | PVKT-Production Supply Area |
| 8 | T430-Control Key |
| 9 | T006-Units of Measurement |
| 10 | TC26-Capacity Category |
| 11 | TKA01-Controlling Areas |
| 12 | OP54-Formula key for costing |
| 13 | TFACD-Factory Calendar |
| 14 | TC39A-Shifting Group |
| 15 | TC27-Capacity Responsible Planner |
| 16 | TC36-Active Version |
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| 1071 | Activity Type |
| 1074 | Cost Centre |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
| 1 | Work Centre has not been created in a Plant | Ensure the Work centre mapping is correct and or create the Work centre if it is valid |
| 2 | Configuration is missing | Verify that all configuration exists and reprocess when they are available (See configuration in Spec) |
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
| Verify Count | SyWay P2F Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
| Validation Reports |
Accuracy
| Task | Action |
|---|---|
| Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Business
Completeness
| Task | Action |
|---|---|
| Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | Verify that the Resource data in target S/4 HANA were loaded correctly via DSP Migrate post load reports or standard reports from S/4 HANA. |
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.
See also
Change log
Workflow history
| Title | Last Updated By | Updated | Status | |
|---|---|---|---|---|
| There are no pages at the moment. | ||||