Introduction

This Data Design and Flow Specification (DDFS) defines the end-to-end data flow required to deliver the A2D (Acquire to Decommission) analytics capability within the SyWay programme. It covers the full DSP layered architecture from S/4HANA source extraction through to SAP Analytics Cloud (SAC) analytical models.


This DDFS covers the following Jira requirements:

  • ERP-888 – Maintenance and Asset Management Cost Dashboard (PARKED)
  • ERP-1012 – Asset Availability Dashboard (Planned vs Unplanned Downtime)
  • ERP-1013 – Reliability Engineering Dashboard (MTBF, Top 10 Bad Actors)
  • ERP-1092 – Maintenance Planning Dashboard
  • ERP-1093 – Maintenance Scheduling Dashboard
  • ERP-1096 – Maintenance Execution Dashboard (MTTR, Overdue%, Technician Productivity)
  • ERP-1098 – Asset Information Dashboard (Preventive Maintenance Strategy, Data Compliance)
  • ERP-1104 – MRO Dashboard (CROSS-REFERENCE to P2F DDFS — no new A2D objects)
  • ERP-1156 – Cross-Instance Material Visibility – MRO Spares (CROSS-REFERENCE to P2F DDFS — DAE/ITAR review mandatory)


Scope Note: ERP-1104 and ERP-1156

Both ERP-1104 (MRO Dashboard) and ERP-1156 (Cross-Instance Material Visibility) are listed under the A2D workstream but consume inventory objects already defined in the P2F DDFS (ERP-1041). These requirements are documented here for completeness but no new DSP objects are required in the A2D stream.


Data Flow Diagram

Source System Extractors


The following source extractors feed the A2D data flow. All S/4HANA extractors are wrapped custom CDS views (Z_I_...) or standard VDM wrappers deployed in the SSAL_S4Hx space. The APM extractor is a placeholder pending APM integration definition.


Code

System

Extractor / CDS View

Key Base Tables

Supports ERPs

Notes

XE_PMNotif

S4H

Z_I_PMNotifMaintenanceData

QMEL / QMIH / ILOA

ERP-1012, ERP-1013, ERP-1092, ERP-1096

Existing custom Z-extractor.

XE_MOTech

S4H

I_MaintOrderTechObjCube

IFLOT, ILOA, AUFK, AFKO, AFIH, CRHD, EQUZ, EQUI + others

ERP-1012, ERP-1013, ERP-1092, ERP-1093, ERP-1096, ERP-1098

Standard VDM cube. Wrapper required.

XE_CostCube

S4H

I_MaintOrderActualCostDataCube

SCAL_TT_DATE, EQUZ, EQUI, SKA1 + others

ERP-888, ERP-1013

Standard VDM cost cube. Wrapper required.

XE_MaintOps

S4H

I_MaintOrderOperation_DEX

Operation-level DEX

ERP-1092, ERP-1093, ERP-1096

Standard DEX view. Wrapper required.

XE_EqBOM

S4H

Z_I_EquipmentBomLink

EQST

ERP-1098

Custom Z-extractor.

XE_MaintPlan

S4H

I_MaintenancePlan

MPLA / T399W

ERP-1098

Standard view. Wrapper required.

XE_APMRecom

APM

Z_apm_tbd

APM system (TBD)

ERP-1013

BLOCKED — APM extractor not defined.

Inbound Layer


The Inbound Layer (Layer 1) receives delta-loaded records from source extractors. No field transformations are applied at this layer. Standard technical fields (load date/time, source system) are retained as delivered. Objects reside in the SSAL_S4Hx space (S/4 HANA sourced) and SSAL_APM space (APM sourced).


Code

Object Name (Tech)

Source Extractor

Notes

1TXL_PMNotif

1TL_S4Hx_I_PMNotifMaintenanceData

Z_I_PMNotifMaintenanceData (XE_PMNotif)

Initial + delta load.

1TXL_MOTech

1TL_S4Hx_I_MaintOrderTechObCube

I_MaintOrderTechObjCube (XE_MOTech)

Standard VDM wrapper. Delta load.

1TXL_CostCube

1TL_S4Hx_I_MaintOrderActualCostCube

I_MaintOrderActualCostDataCube (XE_CostCube)

Standard VDM wrapper. Delta load.

1TXL_MaintOps

1TL_S4Hx_I_MaintOrderOperation

I_MaintOrderOperation_DEX (XE_MaintOps)

DEX export. Delta load.

1TXL_EqBOM

1TL_S4Hx_I_EquipmentBomLink

Z_I_EquipmentBomLink (XE_EqBOM)

Custom Z-extractor.

1TXL_MaintPlan

1TL_S4Hx_I_MaintenancePlan

I_MaintenancePlan (XE_MaintPlan)

Standard view wrapper.

1TXL_Recom (SSAL_APM)

TBD

Z_apm_tbd (XE_APMRecom)

BLOCKED — APM extractor not defined.

Harmonisation Layer

2TL_S4HARM_I_PMNotifMaintenanceData (2TL_PMNotif)

Type: TL — Table / Load object

Source: 1TL_S4Hx_I_PMNotifMaintenanceData (1TXL_PMNotif)

Purpose: Delta load of PM notification maintenance data. Sets composite key.

Keys:

  • MaintenanceNotification
  • NotificationItem

Supports: ERP-1012, ERP-1013, ERP-1092, ERP-1096


2TF_S4HARM_I_PMNotifMaintenanceData

Type: TF — Transformation Flow

Source: 1TL_S4Hx_I_PMNotifMaintenanceData (1TXL_PMNotif)

Purpose: No transformations. Pass-through only.


2VR_S4HARM_I_PMNotifMaintenanceData (2VR_PMNotif)

Type: VR — Harmonisation View

Source: 2TL_S4HARM_I_PMNotifMaintenanceData

Purpose: View on harmonised PM notification maintenance data. Interface object for Propagation Layer.

Filter: MaintenanceNotification IS NOT NULL

Projection:

  • MaintenanceNotification
  • NotificationItem
  • Equipment
  • FunctionalLocation
  • RelevantFunctionalLocation
  • MaintenancePlant
  • MaintenancePlannerGroup
  • MaintenanceActivityType
  • NotificationType
  • MaintPriority
  • MaintenanceObjectIsDown
  • MaintObjectDowntimeDuration
  • MaintObjDowntimeDurationUnit
  • MalfunctionStartDate
  • MalfunctionStartTime
  • MalfunctionEndDate
  • MalfunctionEndTime
  • CreationDate
  • CreationTime
  • AvailyBeforeMalfunctionPercent
  • AvailyAfterMalfunctionPercent
  • AvailyAfterConclusionPercent
  • SystConditionBeforeMalfunction
  • SystConditionAfterMalfunction
  • SystConditionAfterCompletion
  • CompanyCode
  • (amber) DamageCode — new for ERP-1013 failure reason analysis
  • (amber) ObjectPartCode — new for ERP-1013
  • (amber) CauseCode — new for ERP-1013
  • (amber) ABCIndicator — confirmed on I_MaintOrderTechObjCube; join to 2VR_MOTech on MaintenanceNotification key required for PMNotif-based filters (G-15)

Formula / Aggregation: None — harmonisation only

Notes: DamageCode, ObjectPartCode, CauseCode added for ERP-1013. ABCIndicator join pattern documented in G-15.

2TL_S4HARM_I_MaintOrderTechObCube (2TL_MOTech)

Type: TL — Table / Load object

Source: 1TL_S4Hx_I_MaintOrderTechObCube (1TXL_MOTech)

Purpose: Delta load of maintenance order / technical object data. Sets composite key.

Keys:

  • MaintenanceOrder

Supports: ERP-1012, ERP-1092, ERP-1093, ERP-1096, ERP-1098


2TF_S4HARM_I_MaintOrderTechObCube

Type: TF — Transformation Flow

Source: 1TL_S4Hx_I_MaintOrderTechObCube (1TXL_MOTech)

Purpose: No transformations. Pass-through only.


2VR_S4HARM_I_MaintOrderTechObCube (2VR_MOTech)

Type: VR — Harmonisation View

Source: 2TL_S4HARM_I_MaintOrderTechObCube

Purpose: View on harmonised maintenance order / technical object data. Interface object for Propagation Layer.

Filter: MaintenanceOrder IS NOT NULL AND MaintenanceOrder <> ''

Projection:

  • MaintenanceOrder
  • Equipment
  • FunctionalLocation
  • MaintenancePlant
  • MaintenancePlannerGroup
  • PlantSection
  • MainWorkCenter
  • WorkCenterInternalID
  • MaintenanceOrderType
  • MaintenanceActivityType
  • MaintenancePlan
  • TaskListGroup
  • TaskListGroupCounter
  • TaskListType
  • OrderUserStatus
  • ScheduledBasicStartDate
  • ScheduledBasicStartTime
  • ScheduledBasicEndDate
  • ScheduledBasicEndTime
  • ScheduledBasicStartDateTime
  • ScheduledBasicEndDateTime
  • ActualStartDate
  • ConfirmedEndDate
  • CompanyCode
  • WBSElementInternalID

Formula / Aggregation: None — harmonisation only


2TL_S4HARM_I_MaintOrderActualCostCube (2TL_CostCube)

Type: TL — Table / Load object

Source: 1TL_S4Hx_I_MaintOrderActualCostCube (1TXL_CostCube)

Purpose: Delta load of maintenance order actual cost postings. Sets composite key.

Keys:

  • MaintenanceOrder
  • AccountingDocument
  • FiscalYear
  • AccountingDocumentItem

Supports: ERP-888, ERP-1013


2TF_S4HARM_I_MaintOrderActualCostCube

Type: TF — Transformation Flow

Source: 1TL_S4Hx_I_MaintOrderActualCostCube (1TXL_CostCube)

Purpose: No transformations. Pass-through only.


2VR_S4HARM_I_MaintOrderActualCostCube (2VR_CostCube)

Type: VR — Harmonisation View

Source: 2TL_S4HARM_I_MaintOrderActualCostCube

Purpose: View on harmonised maintenance order actual cost data.

Filter: MaintenanceOrder IS NOT NULL AND MaintenanceOrder <> ''

Projection:

  • MaintenanceOrder
  • AccountingDocument
  • FiscalYear
  • AccountingDocumentItem
  • CompanyCode
  • CompanyCodeCurrency
  • AmountInCompanyCodeCurrency
  • GlobalCurrency
  • AmountInGlobalCurrency
  • TransactionCurrency
  • AmountInTransactionCurrency
  • GLAccount
  • CostElementGroup
  • MaintenanceOrderType
  • MaintenanceActivityType
  • MaintenanceOrderIsPlanned
  • Plant
  • PlantSection
  • Equipment
  • FunctionalLocation
  • MaintenancePlant
  • MaintenancePlannerGroup
  • MainWorkCenterInternalID
  • MaintOrdMainWorkCenter
  • MaintOrdMainWorkCenterPlant
  • CostCenter
  • ControllingArea
  • PostingDate
  • PostingMonth
  • FiscalPeriod

Formula / Aggregation: None — harmonisation only

Notes: WBSElementInternalID is NOT on I_MaintOrderActualCostDataCube — removed from this projection. ActivityType confirmed present directly on cost cube; no join to MOTech required for cost type split.


2TL_S4HARM_I_MaintOrderOperation (2TL_MaintOps)

Type: TL — Table / Load object

Source: 1TL_S4Hx_I_MaintOrderOperation (1TXL_MaintOps)

Purpose: Delta load of maintenance order operation records. Sets composite key.

Keys:

  • MaintenanceOrder
  • MaintenanceOrderOperation

Supports: ERP-1092, ERP-1093, ERP-1096


2TF_S4HARM_I_MaintOrderOperation

Type: TF — Transformation Flow

Source: 1TL_S4Hx_I_MaintOrderOperation (1TXL_MaintOps)

Purpose: No transformations. Pass-through only.


2VR_S4HARM_I_MaintOrderOperation (2VR_MaintOps)

Type: VR — Harmonisation View

Source: 2TL_S4HARM_I_MaintOrderOperation

Purpose: View on harmonised maintenance order operation data.

Filter: MaintenanceOrder IS NOT NULL AND MaintenanceOrderOperation IS NOT NULL

Projection:

  • MaintenanceOrder
  • MaintenanceOrderOperation
  • Plant
  • WorkCenter
  • WorkCenterPlant
  • WorkCenterInternalID
  • MaintenancePlannerGroup
  • MaintenanceOrderType
  • MaintenanceActivityType
  • OperationPlannedWork
  • OperationPlannedWorkUnit
  • ConfirmationTotalQuantity
  • ConfirmationTotalQuantityUnit
  • MaintOrdOperationWorkDuration
  • OplTStSchedldExecEndDte
  • LatestAcceptableCompletionDate
  • MaintOrdProcessPhaseCode
  • ConfirmedEndDate
  • ConfirmedEndTime
  • Equipment
  • FunctionalLocation
  • MaintOrdMainWorkCenter
  • MaintOrdMainWorkCenterPlant

Formula / Aggregation: None — harmonisation only


2TL_S4HARM_I_EquipmentBomLink (2TL_EqBOM)

Type: TL — Table / Load object

Source: 1TL_S4Hx_I_EquipmentBomLink (1TXL_EqBOM)

Purpose: Delta load of equipment BOM link data. Sets composite key.

Keys:

  • Equipment
  • BillOfMaterial
  • BillOfMaterialCategory
  • BillOfMaterialVariant

Supports: ERP-1098


Type: TF — Transformation Flow

Source: 1TL_S4Hx_I_EquipmentBomLink (1TXL_EqBOM)

Purpose: No transformations. Pass-through only.


2VR_S4HARM_I_EquipmentBomLink (2VR_EqBOM)

Type: VR — Harmonisation View

Source: 2TL_S4HARM_I_EquipmentBomLink

Purpose: View on harmonised equipment BOM link data.

Filter: Equipment IS NOT NULL AND Equipment <> ''

Projection:

  • Equipment
  • BillOfMaterial
  • BillOfMaterialCategory
  • BillOfMaterialVariant
  • BillOfMaterialVariantUsage
  • Plant

Formula / Aggregation: None — harmonisation only


2VD_S4HARM_Equipment (2VD_Equip)

Type: VD — Dimension View

Source: I_Equipment (standard VDM — no TL/TF required)

Purpose: Equipment master data dimension. Provides Equipment description, object type, plant, and manufacturer for lookups across Analytical Models.

Filter: None

Projection: All standard fields from I_Equipment required by AM dimension usage.

Formula / Aggregation: None

Notes: No Replication Flow required. Sourced directly from standard VDM view.


2TL_S4HARM_I_MaintenancePlan (2TL_MaintPlan)

Type: TL — Table / Load object

Source: 1TL_S4Hx_I_MaintenancePlan (1TXL_MaintPlan)

Purpose: Delta load of maintenance plan data (MPLA / T399W). Sets key.

Keys:

  • MaintenancePlan

Supports: ERP-1098 — Active Preventive Maintenance Strategy KPI


2TF_S4HARM_I_MaintenancePlan

Type: TF — Transformation Flow

Source: 1TL_S4Hx_I_MaintenancePlan (1TXL_MaintPlan)

Purpose: No transformations. Pass-through only.


2VR_S4HARM_I_MaintenancePlan (2VR_MaintPlan)

Type: VR — Harmonisation View

Source: 2TL_S4HARM_I_MaintenancePlan

Purpose: View on harmonised maintenance plan data.

Filter: MaintenancePlan IS NOT NULL AND MaintenancePlan <> ''

Projection:

  • MaintenancePlan
  • MaintenancePlanDesc
  • MaintenanceStrategy
  • MaintenancePlanCategory
  • FunctionalLocation
  • Equipment
  • SchedulingStartDate
  • SchedulingStartTime
  • SchedulingEndDate
  • MaintPlanIsLockedAgainstCalls
  • CallHorizonInDays
  • SchedulingDuration
  • SchedulingDurationUnit
  • Plant
  • AuthorizationGroup

Formula / Aggregation: None — harmonisation only

Notes: PlantSection (BEBER) and MaintenancePlannerGroup (INGRP) are NOT on I_MaintenancePlan. These are resolved by join to 2VR_MOTech in the Propagation Layer (3VF_A2DAMM_MaintenancePlan) — see Section 6.7.


2TL_S4HARM_xxxxxx (2TL_Recom) — BLOCKED

Type: TL — Table / Load object

Source: 1TXL_Recom (SSAL_APM) — Z_apm_tbd

Purpose: BLOCKED. APM recommendation data load. Object names and source TBD pending APM integration analysis.

Notes: G-05. Contact: Gokhan Yilmazturk.


Note: The following two objects have been removed as the related KPIs have been deleted from ERP-1013.

2VR_S4HARM_xxxxxx (2VR_Recom) — BLOCKED

Type: VR — Harmonisation View

Source: 2TL_S4HARM_xxxxxx

Purpose: BLOCKED. APM recommendation view. Filter, projection and formula TBD.

Filter: BLOCKED

Projection: BLOCKED

Formula / Aggregation: BLOCKED

Notes: G-05.


WBS / Planned Cost (Placeholder)

Type: PLACEHOLDER

Source: CO / PS — source TBD

Purpose: WBS planned cost input for ERP-888 budget comparison KPI. No standard SAP PM CDS view exposes WBS planned values.

Filter: TBD

Projection: TBD

Formula / Aggregation: TBD

Notes: G-02. Source options: CO/PS extractor, SAC planning model (4MP_ARV), or manual input table.


Propagation Layer


3VR_A2DAMM_PMNotif (3VR_PMNotif)

Type: VR — Projection View

Source: 2VR_PMNotif

Purpose: Projects notification grain for downstream consumption. One row per notification. Includes breakdown flags, downtime duration, malfunction dates, priority, DamageCode, ObjectPartCode, and CauseCode.

Filter: None additional — inherits from 2VR_PMNotif

Projection: All fields from 2VR_PMNotif

Formula / Aggregation: None

Supports: ERP-1012, ERP-1013, ERP-1092, ERP-1096


3VR_A2DAMM_MOTech (3VR_MOTech)

Type: VR — Projection View

Source: 2VR_MOTech

Purpose: Projects order-centric grain. Includes scheduled dates, planner group, plant section, task list, order type, and MaintenanceActivityType.

Filter: None additional — inherits from 2VR_MOTech

Projection: All fields from 2VR_MOTech

Formula / Aggregation: None

Supports: ERP-1012, ERP-1013, ERP-1092, ERP-1093, ERP-1096, ERP-1098


3VR_A2DAMM_UnplannedDowntime (3VR_UnplanDT)

Type: VR — Projection / Calculation View

Source: 2VR_PMNotif

Purpose: Unplanned downtime projection. Filters notifications flagged as breakdown and derives downtime in hours.

Filter: MaintenanceObjectIsDown = 'X'

Projection: Equipment, FunctionalLocation, MaintenancePlant, PlannerGroup, StartDateTime, EndDateTime, DowntimeHours, PlannedVsUnplanned, SourceType

Formula / Aggregation:

  • PlannedVsUnplanned = 'UNPLANNED'
  • SourceType = 'NOTIF'
  • DowntimeHours = MaintObjectDowntimeDuration / 3600
  • StartDateTime = MalfunctionStartDate + MalfunctionStartTime
  • EndDateTime = MalfunctionEndDate + MalfunctionEndTime
  • FunctionalLocation sourced from RelevantFunctionalLocation

Notes: Input to union in 3VF_DTFact.


3VR_A2DAMM_PlannedDowntime (3VR_PlanDT)

Type: VR — Projection / Calculation View

Source: 2VR_MOTech

Purpose: Planned downtime projection. Derives downtime window from scheduled order dates.

Filter: MaintenanceOrderType IN planned types

Projection: Equipment, FunctionalLocation, MaintenancePlant, PlannerGroup, StartDateTime, EndDateTime, DowntimeHours, PlannedVsUnplanned, SourceType

Formula / Aggregation:

  • PlannedVsUnplanned = 'PLANNED'
  • SourceType = 'ORDER'
  • DowntimeHours = (ScheduledBasicEndDateTime - ScheduledBasicStartDateTime) / 3600

Notes: Input to union in 3VF_DTFact.


3VF_A2DAMM_DowntimeFact (3VF_DTFact)

Type: VF — Union / Calculation View

Source: UNION: 3VR_UnplanDT + 3VR_PlanDT

Purpose: Unified downtime fact combining planned and unplanned downtime. No pre-aggregation — grain retained at event level.

Filter: None

Projection: Common union schema: Equipment, FunctionalLocation, MaintenancePlant, PlannerGroup, StartDateTime, EndDateTime, DowntimeHours, PlannedVsUnplanned, SourceType

Formula / Aggregation: Union — accept default union field mappings. No additional derivations.

Supports: ERP-1012


Union Detail

Two projections align schemas before the union:

  • Unplanned: SourceType='NOTIF', PlannedVsUnplanned='UNPLANNED', DowntimeHours = MaintObjectDowntimeDuration/3600, FunctionalLocation from RelevantFunctionalLocation.
  • Planned: SourceType='ORDER', PlannedVsUnplanned='PLANNED', DowntimeHours = (ScheduledBasicEndDateTime - ScheduledBasicStartDateTime)/3600.

Common union fields: Equipment, FunctionalLocation, MaintenancePlant, PlannerGroup, StartDateTime, EndDateTime, DowntimeHours, PlannedVsUnplanned, SourceType.


3VF_A2DAMM_PMNotifFact (3VF_PMNotif)

Type: VF — Calculation View

Source: 3VR_PMNotif

Purpose: Formula view on notification data. Adds derived binary and count measures for notification-level KPIs.

Filter: None

Projection: All fields from 3VR_PMNotif plus derived measures below

Formula / Aggregation:

  • BreakdownNotificationCount = CASE WHEN MaintenanceObjectIsDown = 'X' THEN 1 ELSE 0 END
  • EmergencyNotificationCount = CASE WHEN MaintPriority IN ('0','1') THEN 1 ELSE 0 END
  • DowntimeHours = MaintObjectDowntimeDuration / 3600
  • MalfunctionCount = 1 per notification where MaintenanceObjectIsDown = 'X'
  • DamageCode — passthrough
  • ObjectPartCode — passthrough
  • CauseCode — passthrough

Supports: ERP-1012, ERP-1013, ERP-1092, ERP-1096


3VF_A2DAMM_MaintOrderTechFact (3VF_MOTech)

Type: VF — Calculation View

Source: 3VR_MOTech

Purpose: Formula view on order data. Adds derived flags for planning and task list usage.

Filter: None

Projection: All fields from 3VR_MOTech plus derived measures below

Formula / Aggregation:

  • TaskListUsageFlag = CASE WHEN TaskListGroup IS NOT NULL THEN 'X' ELSE '' END
  • PlannedWindowSeconds = ScheduledBasicEndDateTime - ScheduledBasicStartDateTime
  • OrderCount = 1

Supports: ERP-1012, ERP-1092, ERP-1098


3VR_A2DAMM_MaintOrderActualCostCube (3VR_CostCube)

Type: VR — Projection View

Source: 2VR_CostCube

Purpose: Cost data projection for consumption by 3VF_MaintCosts. Applies company code filter.

Filter: CompanyCode IS NOT NULL

Projection: All fields from 2VR_CostCube

Formula / Aggregation: None

Supports: ERP-888, ERP-1013


3VR_A2DAMM_AssetReplacementValue (3VR_ARV) — GAP

Type: VR — Placeholder

Source: TBD — G-01

Purpose: Asset Replacement Value derivation for ERP-888 Asset Economical Viability KPI.

Filter: TBD

Projection: TBD

Formula / Aggregation: TBD

Notes: G-01. ARV source options: I_FixedAsset (FI-AA), manual input table, or SAC planning model (4MP_ARV). Blocked until source confirmed.


3VF_A2DAMM_MaintenanceCost (3VF_MaintCosts) — PARKED

Type: VF — Join / Calculation View

Source: JOIN: 3VR_CostCube + 3VR_ARV + WBS Planned Cost Placeholder

Purpose: Join of cost actuals, Asset Replacement Value, and WBS planned cost. MaintenanceActivityType available directly on 3VR_CostCube — no additional join to MOTech required for activity type split.

Filter: TBD

Projection: Cost fields, ARV, WBS planned cost

Join: Join key: MaintenanceOrder / Equipment

Formula / Aggregation: Cost type split by MaintenanceActivityType (confirmed on I_MaintOrderActualCostDataCube directly).

Notes: PARKED pending ERP-888 go/no-go and resolution of G-01 (ARV) and G-02 (WBS Planned Cost).

Join Detail

Joins 3VR_CostCube + 3VR_ARV + WBS Placeholder + 3VR_MOTech (for MaintenanceActivityType). Join key: MaintenanceOrder / Equipment.

GAP/ISSUE: ARV source not confirmed — G-01.

GAP/ISSUE: WBS Planned Cost source not confirmed — G-02.


3VR_A2DAMM_MaintOrderOperation (3VR_MaintOps)

Type: VR — Projection View

Source: 2VR_MaintOps

Purpose: Operation-grain projection for consumption by 3VF_MaintOps.

Filter: MaintenanceOrder IS NOT NULL

Projection: All fields from 2VR_MaintOps

Formula / Aggregation: None


3VF_A2DAMM_MaintOrderOperation (3VF_MaintOps)

Type: VF — Join / Calculation View

Source: JOIN: 3VR_MaintOps + 3VR_MOTech

Purpose: Formula view. Joins operation-grain data to order header to resolve PlannerGroup and PlantSection. Adds overdue, rework, and task list flags.

Filter: None

Projection: All 3VR_MaintOps fields + PlannerGroup, PlantSection, TaskListGroup, TaskListUsageFlag from MOTech side

Join: 3VR_MaintOps.MaintenanceOrder = 3VR_MOTech.MaintenanceOrder

Formula / Aggregation:

  • OverdueFlag = CASE WHEN OplTStSchedldExecEndDte < current_date AND order status is open THEN 'X' ELSE '' END
  • ReworkFlag = CASE WHEN MaintenanceActivityType = 'M08' THEN 'X' ELSE '' END
  • TaskListUsageFlag = CASE WHEN TaskListGroup IS NOT NULL THEN 'X' ELSE '' END

Notes: No RESOURCEWORKCENTER field on I_MaintOrderOperation_DEX — other WorkCenter fields used. Work Center capacity (KAKO/KAZY) not in CDS — G-06.

Supports: ERP-1092, ERP-1093, ERP-1096

Join Detail

Joins 3VR_MaintOps (operation grain) to 3VR_MOTech (order header grain) via MaintenanceOrder to resolve PlannerGroup and PlantSection. No RESOURCEWORKCENTER field on I_MAINTORDEROPERATION_DEX; other WorkCenter fields available.

GAP/ISSUE: Work Center Capacity (KAKO/KAZY) not in any standard CDS — G-06.

GAP/ISSUE: Average Planning Lead Time: WO creation date field and notification-to-order join key to be confirmed — G-18.

GAP/ISSUE: % Repetitive Work without TL: notification failure code to order join pattern to be confirmed — G-17.


3VR_A2DAMM_EquipmentBomLink (3VR_EqBOM)

Type: VR — Projection View

Source: 2VR_EqBOM

Purpose: Equipment BOM link projection for consumption by 3VF_EqBOM.

Filter: None additional

Projection: All fields from 2VR_EqBOM

Formula / Aggregation: None


3VF_A2DAMM_EquipmentBomLink (3VF_EqBOM)

Type: VF — Join View

Source: JOIN: 3VR_EqBOM + 3VR_MOTech

Purpose: Enriches Equipment BOM link data with order and technical object attributes from MOTech.

Filter: None

Projection: All 3VR_EqBOM fields + Equipment attributes, FunctionalLocation, MaintenancePlant from MOTech

Join: 3VR_EqBOM.Equipment = 3VR_MOTech.Equipment

Formula / Aggregation: None — join only

Supports: ERP-1098


3VR_A2DAMM_MaintenancePlan (3VR_MaintPlan)

Type: VR — Projection View

Source: 2VR_MaintPlan

Purpose: Maintenance plan projection. Filters to active plans only.

Filter: MaintPlanIsLockedAgainstCalls = false

Projection: All fields from 2VR_MaintPlan

Formula / Aggregation: None


3VF_A2DAMM_MaintenancePlan (3VF_MaintPlan)

Type: VF — Join / Deduplication View

Source: JOIN: 3VR_MaintPlan + 3VR_MOTech

Purpose: Joins maintenance plan to order data to resolve PlantSection and PlannerGroup, which are not available on I_MaintenancePlan directly.

Filter: MaintPlanIsLockedAgainstCalls = false (inherited from 3VR_MaintPlan)

Projection: All 3VR_MaintPlan fields + PlantSection, MaintenancePlannerGroup from MOTech side

Join: 3VR_MaintPlan.MaintenancePlan = 3VR_MOTech.MaintenancePlan

Formula / Aggregation:

  • DEDUPLICATE on MaintenancePlan grain after join — avoids order-level double counting
  • PlantSection and PlannerGroup resolved from MOTech side of join

Notes: G-11 — PlantSection and PlannerGroup not on I_MaintenancePlan.

Supports: ERP-1098

Join Detail

LEFT JOIN 3VR_MaintPlan to 3VR_MOTech ON MaintenancePlan key. Resolves PlantSection and PlannerGroup from order side. DEDUPLICATE on MaintenancePlan grain after join to avoid order-level double counting.

GAP/ISSUE: PlantSection and PlannerGroup not on I_MaintenancePlan — G-11.

3VR_A2DAMM_xxxxxx (3VR_Recom) — BLOCKED

Type: VR — Placeholder

Source: 2VR_Recom (APM)

Purpose: APM recommendation propagation. Definition TBD.

Filter: BLOCKED

Projection: BLOCKED

Formula / Aggregation: BLOCKED

Notes: G-05. All APM objects are placeholders pending APM integration analysis.


Reporting Layer

The Reporting Layer (Layer 4) exposes Analytical Models (AMs) to SAC live connections. Objects in SPOD_A2DAMM are operational reporting models. Objects in SPLN_A2DAMM are planning models. SAC live connection constraint: all fields that must be reported together at the same grain must be joined in Propagation — they cannot be joined across separate AMs in SAC.


Code

AM Name (Tech)

Source

Supports ERPs

Notes

Status

4MA_PMNotif

4MA_A2DAMM_PMNotif

3VF_PMNotif

ERP-1012, ERP-1013, ERP-1092, ERP-1096

Notification-grain AM. Downtime, MTBF, MTTR, emergency notification KPIs. Failure reason analysis (DamageCode, ObjectPartCode, CauseCode).


4MA_MOTech

4MA_A2DAMM_MOTech

3VF_MOTech

ERP-1012, ERP-1013, ERP-1092, ERP-1098

Maintenance order / technical object AM. Availability, planning compliance, task list, data compliance.


4MA_DownTime

4MA_A2DAMM_DowntimeFact

3VF_DTFact

ERP-1012

Unified downtime fact AM (planned + unplanned union).


4MA_MaintCost

4MA_A2DAMM_MaintCost

3VF_MaintCosts

ERP-888, ERP-1013

Maintenance cost AM. ERP-1013 requires: Top 10 by cost; cost split by MaintenanceActivityType for Reactive vs Proactive. MaintenanceActivityType confirmed on I_MaintOrderActualCostDataCube directly. PARKED pending ERP-888 go/no-go.

PARKED

4MA_MaintOps

4MA_A2DAMM_MaintOps

3VF_MaintOps

ERP-1092, ERP-1093, ERP-1096

Operations AM. Planning/scheduling/execution KPIs at operation grain.


4MA_EqBOM

4MA_A2DAMM_EqBOM

3VF_EqBOM

ERP-1098

Equipment BOM AM.


4MA_MaintPlan

4MA_A2DAMM_MaintPlan

3VF_MaintPlan

ERP-1098

Maintenance plan AM. Active preventive maintenance strategy KPI.


4MA_Recom

4MA_A2DAMM_xxxxxx

3VF_Recom (TBD)

ERP-1013 (APM)

APM recommendation AM. TBD pending APM integration — G-05.

BLOCKED

4MP_ARV (SPLN)

4MP_A2DAMM_ARV

3VR_ARV (TBD)

ERP-888

Planning AM — Asset Replacement Value input. SPLN_A2DAMM space.

TBD

4MP_AMMKPI (SPLN)

4MP_A2DAMM_AMMKPI

Multi-source

All

KPI targets planning AM. SPLN_A2DAMM space.

TBD


4MA_A2DAMM_PMNotif - Calculated Measures

Measure Name

Calculation / Source Field

Aggregation

Notes

Notification Count

Constant 1 per record

SUM


Breakdown Notification Count

CASE WHEN MaintenanceObjectIsDown = 'X' THEN 1 ELSE 0 END

SUM


Downtime Duration (Seconds)

MaintObjectDowntimeDuration (AUSZT)

SUM


Downtime Hours (Unplanned)

MaintObjectDowntimeDuration / 3600

SUM


Emergency Notification Count

CASE WHEN MaintPriority IN ('0','1') THEN 1 ELSE 0 END

SUM


% Emergency Work

EmergencyNotificationCount / TotalNotificationCount * 100

CALCULATED


MTTR (Hours)

Total Length of Downtime / No. of Breakdowns. SUM(MaintObjectDowntimeDuration) / COUNT(BreakdownNotifications) / 3600. Aggregation by FuncLoc hierarchy not required — simplified approach.

CALCULATED


MTBF (Hours)

MTBF = (Total Operating Time - Planned Downtime) / Count(Malfunction). Planned Downtime from ScheduledBasicEndDateTime-StartDateTime. Count(Malfunction) = COUNT where MaintenanceObjectIsDown=X.

CALCULATED

G-03 / G-16 — Total Operating Time not in SAP PM.

Malfunction Count

COUNT of notifications WHERE MaintenanceObjectIsDown = X

SUM

Used as denominator in MTBF formula.

Availability Before Malfunction (%)

AvailyBeforeMalfunctionPercent

AVG

Std Fields, no reporting req.

Availability After Malfunction (%)

AvailyAfterMalfunctionPercent

AVG

Std Fields, no reporting req.

Availability After Conclusion (%)

AvailyAfterConclusionPercent

AVG

Std Fields, no reporting req.

Damage Code (Dimension)

DamageCode passthrough from I_PMNotifMaintenanceData. Failure reason analysis.

Dimension

New for ERP-1013.

Object Part Code (Dimension)

ObjectPartCode passthrough.

Dimension

New for ERP-1013.

Cause Code (Dimension)

CauseCode passthrough.

Dimension

New for ERP-1013.


4MA_A2DAMM_DowntimeFact - Calculated Measures

MaintenanceObjectIsDown = X identifies breakdown downtime. Planned Downtime: anything not marked as breakdown is treated as planned preventive/corrective work. Total Operating Time assumption: 365 x 24 hours — approach to be agreed before build — G-03.


Measure Name

Calculation / Source Field

Aggregation

Notes

Breakdown Notification Count

CASE WHEN MaintenanceObjectIsDown = 'X' THEN 1 ELSE 0 END

SUM

Unplanned side.

Downtime Hours (Unplanned)

MaintObjectDowntimeDuration / 3600

SUM


Planned Order Count

Constant 1 per planned order row

SUM


Planned Window Hours

(ScheduledBasicEndDateTime - ScheduledBasicStartDateTime) / 3600

SUM


Unified Downtime Hours

CASE WHEN SourceType='NOTIF' THEN DowntimeHours ELSE PlannedWindowHours END

SUM

Down Time Type derived from Work Order Type / Breakdown Indicator from notification.

Total Unplanned Downtime Hours

SUM(UnifiedDowntimeHours) WHERE PlannedVsUnplanned = 'UNPLANNED'

SUM (restricted)


Total Planned Downtime Hours

SUM(UnifiedDowntimeHours) WHERE PlannedVsUnplanned = 'PLANNED'

SUM (restricted)


Downtime Ratio (Planned / Unplanned)

TotalPlannedDowntime / NULLIF(TotalUnplannedDowntime, 0)

CALCULATED


Technical Availability %

(Total Operating Time - Breakdown Time - Planned Down Time) / Total Operating Time * 100

CALCULATED

G-03 — Total Operating Time not in SAP PM. Assumption: 365 x 24 hours.


4MA_A2DAMM_MaintOps - Calculated Measures

No RESOURCEWORKCENTER field on I_MAINTORDEROPERATION_DEX; other WorkCenter fields available. Planning is at FieldGrp level.


Measure Name

Calculation / Source Field

Aggregation

Notes

Order Count (Proactive)

COUNT WHERE MaintenanceActivityType IN proactive types

SUM


Order Count (Reactive)

COUNT WHERE MaintenanceActivityType IN reactive types

SUM


Planning Compliance %

Planned WO / Total WO (not completed, not breakdown) * 100

CALCULATED


Planned Man-Hours

SUM(OperationPlannedWork) by WorkCenter / PlannerGroup

SUM

Planned vs actual comparison approach to be confirmed.

Actual Man-Hours (Confirmed)

SUM(ConfirmationTotalQuantity)

SUM

Total hours worked = hours confirmed on orders.

Backlog Hours

SUM(OperationPlannedWork) for open/planned orders

SUM

Total planned work based on Work Center of the notification.

Backlog Weeks

BacklogHours / WorkCenterCapacityHours

CALCULATED

G-06 — WC capacity not in CDS.

Overdue Order Count

Order Level: Overdue Order = Final Confirmation Date - Final Due Date > 3 days

SUM

G-09. Source: I_MAINTORDERTECHOBJCUBE.

Overdue %

OverdueOrderCount / TotalScheduledOrderCount * 100

CALCULATED

3-day tolerance. G-09.

Rework Order Count

Reactive maintenance orders in Repair activity type vs technically completed orders within defined timeframe on same equipment

SUM

G-10. Drilldown by maintenance order.

Rework %

ReworkOrderCount / TotalOrderCount * 100

CALCULATED


MTTR (Hours)

SUM(MaintObjectDowntimeDuration) / COUNT(BreakdownNotifications) / 3600

CALCULATED

From PMNotif join.

Technician Productivity

Work Center hours booked on orders / Work Center total hours worked. Hours confirmed used as proxy for total hours worked.

CALCULATED

G-06 — WC capacity not in CDS.

% Task List Usage

COUNT(OrdersWithTaskList) / TotalOrderCount * 100

CALCULATED


% Emergency Work

COUNT(MaintPriority IN '0','1') / TotalNotificationCount * 100

CALCULATED

From PMNotif join.

Schedule Compliance %

Work completed as per weekly schedule (snapshot) / Total scheduled

CALCULATED

G-07 — frozen schedule flag not native.

Schedule Attainment %

ConfirmationTotalQuantity / OperationPlannedWork for the frozen week * 100

CALCULATED

Weekly grain.

% Work Scheduled vs Available Capacity

Scheduled hours / WC available capacity

CALCULATED

G-06 — WC capacity not in CDS.

% Break-In Work

Break-In Work Confirmation / Total Work Confirmation

CALCULATED

G-08.

Frozen Schedule Adherence %

% Work rescheduled after freeze point

CALCULATED

G-07 — rescheduled flag not native.

Planning Accuracy % (Hours)

OperationPlannedWork vs ConfirmationTotalQuantity / OperationPlannedWork * 100

CALCULATED


Planning Accuracy % (Materials)

Planned Material Cost vs Actual Material Cost / Planned * 100

CALCULATED

From cost cube join. Planned material cost field to be confirmed.

Average Planning Lead Time (Days)

AVG(Work Order creation date - Notification creation date) for unplanned corrective, by MaintPriority

AVG

G-18 — WO creation date field to be confirmed on I_MaintOrderTechObjCube.

% Repetitive Work without TL

COUNT(corrective orders without TaskListGroup on same Equipment, same ObjectPartCode, same DamageCode) / TotalCorrectiveOrders * 100

CALCULATED

G-19 — join between PMNotif failure codes and order header required.


4MA_A2DAMM_MaintPlan - Calculated Measures

Objects under evaluation for both Data Compliance and Active Preventive Maintenance Strategy not yet confirmed by business.


Measure Name

Calculation / Source Field

Aggregation

Notes

Active Maintenance Plan Count

COUNT WHERE MaintPlanIsLockedAgainstCalls = false

SUM

G-11.

Active Plans per Equipment

COUNT(Active Plans) grouped by Equipment

SUM


% Assets with Active PM Strategy

Assets with >= 1 active plan / Total assets * 100

CALCULATED

Denominator definition to be agreed.

% Data Compliance

Compliant Data Records / Total Data Records * 100

CALCULATED

Objects under evaluation not yet confirmed by business.


Variables (SAC Filters / Prompts)

Variable

Required / Optional

Type

Default

Notes

Period (Date / Fiscal Period)

Optional

Interval

Last 30 days

Applied using CreationDate, ActualStartDate, or PostingDate depending on AM.

Functional Location (Asset Hierarchy)

Optional

Hierarchy

No default

FunctionalLocation from I_PMNotifMaintenanceData or I_MaintOrderTechObjCube.

Equipment

Optional

Multiple single values

No default

Direct equipment filter.

Maintenance Plant

Optional

Multiple single values

No default

MaintenancePlant across all objects.

Planner Group

Optional

Multiple single values

No default

Available in 4MA_MOTech and 4MA_MaintOps. Not on PMNotif alone - join required.

Plant Section

Optional

Multiple single values

No default

PLANTSECTION (BEBER) - I_MaintOrderTechObjCube only.

Maintenance Order Type

Optional

Multiple single values

No default

Used to split Capex/Opex, planned/unplanned.

Work Center

Optional

Multiple single values

No default

WorkCenterInternalID in MaintOps and MOTech models.

Notification Type

Optional

Multiple single values

No default

Available in PMNotif model (e.g. M2 = breakdown).


Shared Objects with P2F DDFS

Objects used by ERP-1104 and ERP-1156 are defined in the P2F DDFS (ERP-1041). No new A2D objects are required for these requirements.


Object (Tech Name)

Defined In

Used By (A2D)

Action

4MA_P2FINV_MaterialStock

P2F DDFS (ERP-1041)

ERP-1104, ERP-1156

Reuse. Apply MRO SLOC/Plant filter in SAC story for ERP-1104.

2VR_S4HARM_GoodsMovementDocumentDEX

P2F DDFS (ERP-1041)

ERP-1104, ERP-1156

Reuse. No new extractor required.

2VR_S4HARM_I_BatchWhereUsedLevel

P2F DDFS (ERP-1041)

ERP-1104 (batch traceability)

Reuse from P2F ERP-410 delivery.

3VR_P2FINV_BatchDel (join pattern)

P2F DDFS (ERP-1041)

ERP-1156 (delivery data)

Reuse join pattern. Do not rebuild.


ERP-1156 note: Cross-instance architecture (ROW S/4 + China S/4) requires DAE/ITAR review and sign-off before any build activity.


Effort Estimate and Object Count


System

Component

Count

Estimated Days

Comments

S/4 CDS

Custom extractors (Z_I_...)

6

6 x 5 = 30

XE_PMNotif existing. XE_EqBOM new. XE_APMRecom blocked.

S/4 CDS

VDM wrappers (standard views)

5

5 x 3 = 15

I_MaintOrderTechObjCube, I_MaintOrderActualCostDataCube, I_MaintOrderOperation_DEX, I_MaintenancePlan, I_EquipmentBomLink.

DSP

Inbound Layer (TL pairs)

6

Included above

One TL per extractor.

DSP

Harmonisation Layer (VR + VD)

8

8 x 3 = 24

Standard harmonisation pattern. No complex transforms.

DSP

Propagation Layer (VR/VF)

12

12 x 5 = 60

Includes union (DTFact), joins (MaintCosts, MaintOps, MaintPlan, EqBOM), formula views.

DSP

Analytical Models (4MA/4MP)

7 + 2 planning

7 x 5 = 35

Excludes ERP-1104/1156 (P2F reuse). 4MP_ARV and 4MP_AMMKPI in SPLN space.

SAC

Dashboards / Stories

8 x medium

8 x 10 = 80

One story per ERP. ERP-888 deferred.



Data Access Controls

Data access control requirements for A2D AMs to be confirmed with the security workstream.

  • Plant-level access restriction expected — Maintenance Plant is available as a dimension across all AMs.
  • Planner Group restriction may be required for ERP-1092/1093/1096.
  • ERP-1156 cross-instance data subject to DAE/ITAR access control review — no design until sign-off.


Currency Conversions

  • 4MA_A2DAMM_MaintCost: AmountInCompanyCodeCurrency is the base measure. Multi-currency requirements to be confirmed with ERP-888 functional spec.
  • All other A2D AMs contain no monetary measures — no currency conversion required.



Appendix


Requirements, KPIs and Analytical Model Mapping

The table below provides a consolidated mapping of all in-scope ERPs, KPIs, CDS source views, and target analytical models.


ERP

KPI / Report

Type

Target AM (Code)

Primary Source CDS / View

Notes

ERP-888

Total Maintenance Cost

Strategic

4MA_A2DAMM_MaintCost

I_MaintOrderActualCostDataCube

Capex/Opex determined by Z-field on WBS master; budget at PPM item level (Category field). ARV required for asset viability KPI — G-01.

BARROW-ext, ian Provide reference to z-field

ERP-888

Planned vs Unplanned Cost

Tactical

4MA_A2DAMM_MaintCost

I_MaintOrderActualCostDataCube

MaintenanceOrderType available directly on cost cube.

Cost type split (Preventive/Corrective/Predictive/Emergency) identified from Order Type + Maintenance Activity Type. ABC Indicator on Equipment/FLOC master for asset criticality filter.

ERP-888

Asset Economical Viability

Tactical

4MA_A2DAMM_MaintCost

3VR_A2DAMM_AssetReplacementValue (placeholder)

ARV source not confirmed — G-01 . Age of Completion = (Today - StartUpDate) / (EndOfLife - StartupDate). Number of Breakdowns = COUNT(I_PMNotifMaintenanceData.MaintenanceNotification).

ERP-888

Work Order Cost & Efficiency

Tactical

4MA_A2DAMM_MaintCost

I_MaintOrderActualCostDataCube

PARKED. No RESOURCEWORKCENTER on I_MAINTORDEROPERATION_DEX; other WorkCenter fields available.

Planned costs displayed alongside actuals on the work order. WBS planned cost source not confirmed — G-02.

BARROW-ext, ian To provide 2VR object for WBS Planned Costs

ERP-1012

Technical Availability %

Strategic

4MA_A2DAMM_DowntimeFact

I_MaintOrderTechObjCube + I_PMNotifMaintenanceData

MaintenanceObjectIsDown = X identifies breakdown downtime. Planned Downtime = any order not flagged as breakdown is planned/preventative work.

Total Operating Time assumption: 365 x 24 hours — G-03 .

Note: Loss Driver KPIs (breakdown hours pareto, notification count pareto) combined into MTTR/Execution per Change Log R2/R3.

ERP-1012

Asset Downtime Planned vs Unplanned

Tactical

4MA_A2DAMM_DowntimeFact

I_MaintOrderTechObjCube + I_PMNotifMaintenanceData

Down Time Type is not a native SAP field. Derived from Work Order Type / Breakdown Indicator from notification.

TBD: Planned = scheduled order window; Unplanned = MaintObjectDowntimeDuration.

ERP-1013

Top 10 Bad Actors

Strategic

4MA_A2DAMM_MaintCost

I_MaintOrderActualCostDataCube

Top 10 Equipment by Maintenance Cost (descending) for defined period and MaintenanceActivityType

Pareto filter in SAC. 4MA_MaintCost

ABCIndicator confirmed on I_MaintOrderActualCostDataCube.

For PMNotif-based filters, join to 2VR_MOTech on MaintenanceNotification key required.

ERP-1013

Failure Reasons of Asset

Operational

4MA_A2DAMM_PMNotif + 4MA_A2DAMM_MaintCost

I_PMNotifMaintenanceData + I_MaintOrderActualCostDataCube

Count Failure Reasons by frequency, segmented by MaintenanceActivityType. DamageCode, ObjectPartCode, CauseCode added to 2VR_PMNotif and 3VF_PMNotif.

Failure count from 4MA_PMNotif; cost per failure reason from 4MA_MaintCost — SAC story joins via Equipment dimension.

Cost split by MaintenanceActivityType — confirmed available on I_MaintOrderActualCostDataCube directly.

ERP-1013

Reactive vs Proactive Maintenance

Operational

4MA_A2DAMM_MaintCost

I_MaintOrderActualCostDataCube

Cost split by MaintenanceActivityType (Preventive/Corrective/Emergency). MaintenanceActivityType is available directly on I_MaintOrderActualCostDataCube — no join required.

ERP-1013

MTBF

Tactical

4MA_A2DAMM_PMNotif

I_PMNotifMaintenanceData

MTBF = (Total Operating Time - Planned Downtime) / Count(Malfunction).

Planned Downtime from ScheduledBasicEndDateTime-StartDateTime. Count(Malfunction) = COUNT where MaintenanceObjectIsDown=X (Same as ERP-1012 Tech Avail %)

Total Operating Time not in SAP PM — G-03/G-16 . (Same assumption as Tech Avail% ?)

ABCIndicator confirmed on I_MaintOrderTechObjCube; join to 2VR_MOTech on MaintenanceNotification key for PMNotif-based filter.

ERP-1092

% Work Order Planned

Strategic

4MA_A2DAMM_MOTech + 4MA_A2DAMM_MaintOps

I_MaintOrderTechObjCube + I_MaintOrderOperation_DEX

Planned WO / Total WO (not completed, not breakdown).

Proactive and Corrective (not break-in).

Sub-metrics: % Task List Usage (TaskListGroup IS NOT NULL), Planned vs Actual Man-Hours (OperationPlannedWork vs ConfirmationTotalQuantity).

Source for order counts: I_MaintOrderTechObjCube. Planning at FieldGrp level.

ERP-1092

Backlog (Weeks)

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

Total planned work in weeks of capacity. Based on Work Center of the notification. WC capacity not in CDS — G-06 .

ERP-1092

Planning Accuracy (%)

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX + I_MaintOrderActualCostDataCube

Planned hours vs Actual hours (OperationPlannedWork vs ConfirmationTotalQuantity).

Planned Materials vs Actual Consumption from cost cube.

No new DSP objects required.

ERP-1092

Average Planning Lead Time

Tactical

4MA_A2DAMM_MOTech + 4MA_A2DAMM_PMNotif

I_PMNotifMaintenanceData + I_MaintOrderTechObjCube

Average days from Unplanned Corrective Notification creation to Work Order creation, segmented by MaintPriority.

Join PMNotif to MOTech on MaintenanceNotification key (confirmed present on both views).

WO CreationDate (ORDERCREATIONDATE) confirmed on I_MaintOrderTechObjCube.

Lead time = MOTech.CreationDate - PMNotif.CreationDate.

Derivable without new objects.

ERP-1092

% Repetitive Work without TL

Tactical

4MA_A2DAMM_MOTech + 4MA_A2DAMM_PMNotif

I_MaintOrderTechObjCube + I_PMNotifMaintenanceData

Corrective work orders where TaskListGroup IS NULL, on same Equipment with same ObjectPartCode and DamageCode within defined period.

Requires join of notification failure codes to order.

DamageCode and ObjectPartCode already projected in 2VR_PMNotif — G-17 .

ERP-1093

Schedule Compliance (%)

Strategic

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

Work completed as per weekly schedule (snapshot).

Average across weeks if period > 1 week.

Frozen schedule flag required Explain snapshot requirement. — G-07 .


The problem — to measure Schedule Compliance we need a snapshot of what was scheduled at the start of the week and then compare it to what was actually done by end of week. Without a snapshot, once an order is rescheduled the original committed date is overwritten. Standard SAP PM does not preserve that history.

So the gap is: there is no standard CDS view or table in S/4HANA that stores the weekly schedule snapshot needed to calculate this KPI properly. It would require either a custom snapshot mechanism built in DSP, or an agreement with the business to use ScheduledBasicEndDate as a proxy for "what was scheduled" — accepting that rescheduled orders corrupt the measurement.

ERP-1093

Schedule Attainment (%)

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

Total Work Confirmation (ConfirmationTotalQuantity) vs Scheduled work for the week (OperationPlannedWork). Weekly grain required.

Frozen schedule flag required Explain snapshot requirement. — G-07 .

ERP-1093

% Work Scheduled (vs Available Capacity)

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

Scheduled hours / Work Center available capacity.

Indicates scheduling effectiveness.

WC capacity not in CDS — G-06

Also potentially: Frozen schedule flag required Explain snapshot requirement. — G-07 .

ERP-1093

% Break-In Work

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

Break-In Work Confirmation / Total Work Confirmation. Break-in flag not native — G-08 .

ERP-1093

Frozen Schedule Adherence (%)

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

% Work that is rescheduled. Requires identification of orders where planned date changed after freeze point — no native SAP field — G-07 .

ERP-1096

Technician Productivity

Strategic

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

Work Center hours booked on orders / Work Center total hours worked.

I_MAINTORDEROPERATION_DEX does not give total available hours — hours confirmed used as denominator. I am not sure this is a gap anymore. The total WC hours worked could be all hours booked by the WC?

WC capacity gap — G-06.

ERP-1096

MTTR

Tactical

4MA_A2DAMM_PMNotif

I_PMNotifMaintenanceData

MTTR = Total Length of Downtime / No. of Breakdowns.

SUM(MaintObjectDowntimeDuration) / COUNT where MaintenanceObjectIsDown=X.

Aggregation by FuncLoc hierarchy not required — simplified approach.

ERP-1096

Overdue %

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderTechObjCube

Order Level Overdue. Overdue Order = Final Confirmation Date - Final Due Date > 3 days. Source: I_MAINTORDERTECHOBJCUBE for order-level. 3-day tolerance. G-09 .

ERP-1096

% Rework

Tactical

4MA_A2DAMM_MaintOps

I_MaintOrderOperation_DEX

Change Log R12: Removed — no anticipated use case. Corrective/failure orders available via standard reports. Row retained for traceability.

ERP-1096

Open Emergency Work / Open Time Confirmations / Open Regulatory Work

Operational

4MA_A2DAMM_MaintOps + 4MA_A2DAMM_PMNotif

I_MaintOrderOperation_DEX + I_PMNotifMaintenanceData

Open emergency work orders, open time confirmations and open regulatory work. MaintPriority 0/1 for emergency. % Emergency Work = EmergencyNotificationCount / TotalNotificationCount — from 4MA_PMNotif.

ERP-1098

% Data Compliance

Strategic

4MA_A2DAMM_MOTech

I_MaintOrderTechObjCube

% Data Compliance = Compliant Data Records / Total Data Records * 100. Objects under evaluation not yet confirmed by business.

ERP-1098

Active Preventive Maintenance Strategy

Tactical

4MA_A2DAMM_MaintPlan

I_MaintenancePlan + I_MaintOrderTechObjCube

Collect each asset's active maintenance strategy. MaintPlanIsLockedAgainstCalls = false. Objects/assets under evaluation not yet confirmed. Join via MaintenancePlan key — G-11.

ERP-1098

Asset Information Report

Operational

4MA_A2DAMM_MOTech

I_MaintOrderTechObjCube

Contains all information related to assets including characteristics. Equipment/FuncLoc master data attributes.

ERP-1104

Stock Value Trend

Tactical

4MA_P2FINV_MaterialStock (P2F)

2VR_S4HARM_GoodsMovementDocumentDEX (P2F)

Stock value over time by SLOC/Plant. Reuse 4MA_P2FINV_MaterialStock with MRO filter.

ERP-1104

Stock Outs

Tactical

4MA_P2FINV_MaterialStock (P2F)

2VR_S4HARM_GoodsMovementDocumentDEX (P2F)

# items where stock qty = 0 with open reservations. Derivable from 4MA_P2FINV_MaterialStock with MRO filter.

ERP-1104

Stock Over Max

Tactical

4MA_P2FINV_MaterialStock (P2F) + MRP master

2VR_S4HARM_GoodsMovementDocumentDEX + MM MRP data

% items above max stock level. Max stock level (MRP parameter) not in current P2F objects. Additional source required — G-18.

ERP-1104

Delivery Accuracy

Tactical

TBD

Purchasing / Delivery CDS (TBD)

Goods receipt vs PO delivery date comparison. Not covered by 4MA_P2FINV_MaterialStock. Requires purchasing/delivery CDS — G-17 .

ERP-1104

Cycle Count Accuracy

Tactical

TBD

Physical Inventory CDS (TBD)

Physical inventory count accuracy for MRO/spare parts managed by maintenance team. Not in P2F DDFS objects. May relate to ERP-436 — G-18 .

ERP-1104

Cycle Count Completion YTD

Tactical

TBD

Physical Inventory CDS (TBD)

YTD completion of physical inventory cycles. Same source gap as Cycle Count Accuracy — G-18 .

ERP-1104

Inventory Turnover Analysis

Operational

TBD

Material stock + consumption CDS (TBD)

Stock value turnover rate by material/SLOC over time. Source: combination of 4MA_P2FINV_MaterialStock (P2F) and goods movement/consumption data. Detailed source and model TBD — no standard extractor identified yet.

ERP-1156

Cross-Instance Material Visibility

Operational

4MA_P2FINV_MaterialStock (P2F)

2VR_S4HARM_GoodsMovementDocumentDEX (P2F)

SHARED WITH P2F. Cross-instance (ROW + China). DAE/ITAR review mandatory.



Gaps Register

Items flagged HIGH priority are blockers for functional sign-off and build.


ID

ERP

Gap / Issue

Description

Status

Priority

Comments

G-01

ERP-888

Asset Replacement Value (ARV)

No standard PM CDS coverage. Options: I_FixedAsset (FI-AA), manual input table, SAC planning model (4MP_ARV).

OPEN

High


G-02

ERP-888

WBS Planned Cost

No standard PM CDS view exposes WBS planned values. CO/PS extractor or manual table required. Ian to advise on Plan/Actual comparison approach.

OPEN

High


G-03

ERP-888 / ERP-1012

Total Operating Time

Not stored in SAP PM. Assumption: 365 x 24 hours per asset. Approach to be agreed before build.

OPEN

High


G-04

ERP-1013

MTBF Definition

MTBF = (Total Operating Time - Planned Downtime) / Count(Malfunction). Planned Downtime and Malfunction Count derivable from existing views. Total Operating Time still blocked — see G-03.

OPEN

High


G-05

ERP-1013

APM Recommendations

Z_apm_tbd not defined. All APM objects placeholders. Contact: Gokhan Yilmazturk.

BLOCKED

High

Removed from ERP-1013

G-06

ERP-1092 / ERP-1096

Work Center Capacity

KAKO/KAZY not in any standard CDS. Backlog (Weeks) and Technician Productivity blocked without this. Total hours worked = hours confirmed on orders (Confirmation CDS view).

OPEN

High


G-07

ERP-1093

Frozen Schedule Flag

No native SAP PM field for frozen week/day schedule. Custom Z-field or activity type mapping required.

There is no standard CDS view or table in S/4HANA that stores the weekly schedule snapshot needed to calculate this KPI properly. It would require either a custom snapshot mechanism built in DSP, or an agreement with the business to use ScheduledBasicEndDate as a proxy for "what was scheduled" — accepting that rescheduled orders corrupt the measurement.

OPEN

Medium


G-08

ERP-1093

Break-In Work Flag

No native SAP field. Custom MaintenanceActivityType or status required.

OPEN

Medium


G-09

ERP-1096

Overdue Date Definition

Order Level Overdue confirmed. Overdue Order = Final Confirmation Date - Final Due Date > 3 days. Source: I_MAINTORDERTECHOBJCUBE.

OPEN

Medium


G-10

ERP-1096

Rework Window

Timeframe (same equipment, same failure within N days) must be agreed with business.

OPEN

Low


G-11

ERP-1098

PlantSection on MaintenancePlan

PLANTSECTION not on I_MaintenancePlan. Join from I_MaintOrderTechObjCube. Double-count risk — see Section 6.4.

OPEN

Medium


G-12

ERP-1104

MRO Cross-reference P2F

ERP-1104 uses 4MA_P2FINV_MaterialStock. No new A2D object required.

CROSS-REF

Low


G-13

ERP-1156

Cross-instance + DAE/ITAR

ERP-1156 cross-instance (ROW + China). DAE/ITAR review mandatory before build.

ITAR

High


G-14

ERP-888

CAPEX/OPEX Mapping

Z-field on WBS master determines Capex/Opex. Budget at PPM item level (Category field). Mapping table from business required.

OPEN

Medium


G-15

ERP-1013

ABC Indicator join for PMNotif-based MTBF filter

ABCIndicator is confirmed on I_MaintOrderTechObjCube and I_MaintOrderActualCostDataCube. For PMNotif-based KPIs (MTBF, notification counts), a join to 2VR_MOTech on MaintenanceNotification key is required to bring ABCIndicator into the notification context.

OPEN

Low


G-16

ERP-1013

Total Operating Time for MTBF

MTBF formula requires Total Operating Time per asset. Not stored in SAP PM. Same blocker as G-03, elevated in priority for MTBF specifically.

OPEN

High


G-17

ERP-1092

% Repetitive Work without TL — notification-to-order join

% Repetitive Work without TL requires matching DamageCode and ObjectPartCode from notifications to corrective orders without a task list, on the same equipment. The join key between I_PMNotifMaintenanceData and I_MaintOrderTechObjCube for this pattern to be confirmed. DamageCode and ObjectPartCode already projected in 2VR_PMNotif.

OPEN

Medium


G-18

ERP-1104

Stock Over Max — MRP max stock level

Stock Over Max KPI requires the MRP maximum stock level per material/SLOC. This is not available in 4MA_P2FINV_MaterialStock or the current P2F harmonisation objects. Source: MM MRP master data. Additional extractor and harmonisation objects required.

OPEN

Medium


G-19

ERP-1104

Delivery Accuracy — purchasing/delivery CDS

Delivery Accuracy requires comparison of goods receipt date to PO confirmed delivery date. This is not covered by 4MA_P2FINV_MaterialStock. A purchasing or delivery CDS view (e.g. I_PurchaseOrderItemAPI01 or equivalent) is required. Source and object definition TBD.

OPEN

Medium


G-20

ERP-1104

Cycle Count KPIs — physical inventory CDS

Cycle Count Accuracy and Cycle Count Completion YTD require physical inventory CDS views (e.g. I_PhysicalInventoryDocument or equivalent) not currently in the P2F DDFS objects. Lambertus flagged potential alignment with ERP-436 (Physical Inventories managed by maintenance team). Scope alignment with ERP-436 required before build.

OPEN

Medium