Purpose

The purpose of this document is to define the conversion approach to create Vendor Hierarchy in S/4 HANA.


Conversion Scope

The scope of this document covers the approach for constructing Vendor Hierarchy of active Vendors from Legacy Source Systems into S/4HANA following the new global hierarchy Master Data Design Standard.


The data from legacy system includes:

  1. Active vendors according to Relevancy Criteria for Vendor in CNV-3007 Business Partners - General (Role 000000).

The data from legacy system excludes:

  1. Vendors blocked or marked for deletion.
  2. Inter-company Vendors ( LFA1-ZZR_SEGT_ATTR = 'G' )
  3. Duplicate vendor


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

DCTData will be provided by business via excel upload to DCT40,000S/4 Hana< 40,000















Additional Information

Multi-language Requirement

N/A

Document Management

Legal Requirement

Special Requirements




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
HRRP_NODEHRYID HRYID Hierarchy IDCHAR42Required
HRRP_NODEHRYNODEHRYNODEHierarchy NodeCHAR50System
HRRP_NODEPARNODEPARNODEHierarchy Parent NodeCHAR50Required
HRRP_NODEHRYVALFROMHRYVALFROMValid FromDATS8Required
HRRP_NODEHRYVALTOHRYVALTOValid ToDATS8Required
HRRP_NODENODETYPENODETYPENode TypeCHAR1System
HRRP_NODENODEVALUENODEVALUENode Value - SupplierCHAR40Required
HRRP_NODEHRYVER HRYVER HierarchyVersionNUMC15System
HRRP_NODEHRYSEQNBRHRYSEQNBRSequenceNumberNUMC6System
HRRP_NODEHRYTYPE HRYTYPE HierarchyTypeCHAR4System
HRRP_NODETNODETXTNODETXTNode DescriptionCHAR50Required
HRRP_NODEHRYLEVELHRYLEVELHierarchyLevelNUMC6Required


Data Cleansing

No data cleansing is required for Vendor Hierarchy in the legacy system. If any cleansing is deemed necessary, it will be performed outside of the system.

As a result, the cleansed Vendor Hierarchy data will be populated directly in the Data Collection Template (DCT).


IDCriticalityError Message/Report DescriptionRuleOutputSource System
N/A
























Conversion Process

The high-level process is represented by the diagram below:

Collection will be done manually in the DCT (Data Collection Template).

  • For sites not on SAP-PF2 or WP2 systems
  • For new vendors that need to be created to support the to-be design



Data Privacy and Sensitivity

N/A


Extraction

Extract data from a source into Syniti. 

  1. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti. This is to be conducted using DCT (Data Collection Template) in Syniti.

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads


Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract relevant vendors based on 3007 approved vendor dedup results.SyWay Data Team
2Business to create the vendor hierarchy using the extract from previous step.S2P Business / Data Owner




Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
N/A









Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule
HRYID Hierarchy ID

DCT key and must be any of the following values:

ZSUP/9000000 - Supplier Hierarchy_HQ

ZSUP/9000001 - Supplier Hierarchy_Plants

ZSUP/9000002 - Supplier Hierarchy_Banks

ZSUP/9000003 - Supplier Hierarchy_Employees

ZSUP/9000004 - Supplier Hierarchy_Carriers

PARNODEHierarchy Parent NodeDCT key and must not exceed 50 characters (Range from 7000000 - 7999999)
HRYVALTOValid ToDCT key and must be a valid date YYYYMMDD and not earlier than Valid From or default to 99991231
HRYVALFROMValid FromMust be a valid date YYYYMMDD.
zLegacyNODEVALUENode Value - Legacy SupplierMust be a relevant vendor from ECC  LFA1-LIFNR
NODETXTNode DescriptionMust not exceed 50 characters
HRYLEVELHierarchyLevelMust be numeric

Extraction Dependencies

Item #Step DescriptionTeam Responsible
13007 Business Partners - General (Vendor Master)S2P










Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible
1Obtain DCT Sign-off from BusinessSyWay S2P Data Team
2

<Add steps from Syniti here>

  1. Load the DCT data via Construct page.
  2. Run the ETL for the object.
SyWay S2P Data Team
3Review and Validate Error and Preload ReportsSyWay S2P Data Team
4

Generate Load Files

SyWay S2P Data Team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTBPVendorHierarchy_DCTHRYID Hierarchy IDROW ChinaHRRP_NODEHRYID Hierarchy IDCopy
2DCTBPVendorHierarchy_DCTPARNODEHierarchy Parent NodeROW ChinaHRRP_NODEPARNODEHierarchy Parent NodeCopy
3DCTBPVendorHierarchy_DCTHRYVALFROMValid FromROW ChinaHRRP_NODEHRYVALFROMValid FromCopy or default to load date if blank.
4DCTBPVendorHierarchy_DCTHRYVALTOValid ToROW ChinaHRRP_NODEHRYVALTOValid ToCopy or default to 99991231 if blank.
5DCTBPVendorHierarchy_DCTzLegacyNODEVALUENode Value - Legacy SupplierROW ChinaHRRP_NODENODEVALUENode Value - SupplierVendor_XREF
6DCTBPVendorHierarchy_DCTNODETXTNode DescriptionROW ChinaHRRP_NODETNODETXTNode DescriptionCopy
7DCTBPVendorHierarchy_DCTHRYLEVELHierarchyLevelROW ChinaHRRP_NODEHRYLEVELHierarchyLevelCopy


Transformation Mapping

 Mapping Document Link

Mapping Table NameMapping Table Description
Vendor_XREFLIFNR: Old Vendor Code to New Vendor Code


Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Ensure DCT tables completenessSyWay S2P Data Team




Pre-Load Validation

Project Team

Completeness

TaskAction
Verify Record CountSyWay S2P Data Team to verify that the total number of relevant records from the  DCT is equal to the total number of records in the Preload and Load Sheets.





Accuracy

TaskAction
Conversion Accuracy

SyWay S2P Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks
Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.



Business

Completeness

TaskAction
Verify Record CountBusiness Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets.





Accuracy

TaskAction
Review Error ReportsBusiness Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).






Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible
1Go to  Fiori <Load Tool> SyWay S2P Data Team
2Load 3 records to validate if data is loaded successfully without errorsSyWay S2P Data Team
3Validate few records loaded by accessing standard transactions from S/4HANASyWay S2P Data Team
4Generate post load report if step 3 is validatedSyWay S2P Data Team


Load Phase and Dependencies

Configuration

Item #Configuration Item
1Hierarchy ID  HRYID is configured and valid in the target system in table HRRP_DIRECTORY

Conversion Objects

Object #Preceding Object Conversion Approach
13007 - BP General Vendor Master


Error Handling

Error TypeError DescriptionAction Taken
1

The value XXX for field XXX doesn't exist

  1. Check the mapping/conversion is done properly in the loading file
  2. Validate the target value is configured/transported in the target system
  3. Reach out to function team to validate the configuration
2

There is mandatory field XXX missing

  1. Validate MDS if the fields are set as mandatory
  2. Validate if there is value in the pre-loading file
  3. Validate if the configuration for the mandatory fields are done properly


Post-Load Validation

Project Team

Completeness

Task

Action

Verify Count

SyWay S2P Data Team to verify the record count created in target S/4 HANA by accessing post load reports in Syniti or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).




Accuracy

Task

Action

Conversion Accuracy

Verify that the Characteristics data in target S/4 HANA were loaded correctly via Syniti post load reports or standard reports from S/4 HANA.






Business

Completeness

Task

Action

Verify Count

Download Post Load Reports from Syniti and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.






Accuracy

Task

Action

Conversion Accuracy

Verify that the Vendor Characteristics data in target S/4 HANA were loaded correctly via Syniti post load reports or standard reports from S/4 HANA

 

 

 

 



Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 7) Apr 15, 2026 07:39 CELEDONIO-ext, Arnold
v. 7 Apr 13, 2026 13:24 CELEDONIO-ext, Arnold Added valid values for Hierarchy ID
v. 6 Mar 25, 2026 08:48 CELEDONIO-ext, Arnold
v. 5 Mar 23, 2026 08:32 CELEDONIO-ext, Arnold
v. 4 Mar 20, 2026 15:58 CELEDONIO-ext, Arnold
v. 3 Mar 20, 2026 15:27 CELEDONIO-ext, Arnold
v. 2 Mar 20, 2026 13:59 CELEDONIO-ext, Arnold
v. 1 Mar 10, 2026 10:14 CELEDONIO-ext, Arnold

  • No labels