Purpose
The purpose of this document is to define the conversion approach to create the WBS - CAPEX, OPEX, Statistical in S/4 HANA.
In SAP, a WBS element (Work Breakdown Structure element) is a key component in project structure. WBS elements are organized hierarchically and facilitates planning, execution, and control.
Conversion Scope
The scope of this document covers the approach for converting applicable active WBS - CAPEX, OPEX, Statistical from Legacy Source Systems into S/4HANA following the WBS - CAPEX, OPEX, Statistical Master Data Design Standard.
The DCT will contain transformed data from source system for Capital and Budget Managed Operating PS Project Definitions in scope for migration, enrichment will be necessary to produce properly formatted data load sheets for S/4 HANA.
Relevancy Criteria
The data from legacy system to be included in the initial extract includes:
The data from legacy system includes:
- Capital projects (e.g. Industrial, Facility, IT and R&I) open as at migration date postings in the agreed migration time or has AUC balance.
- Budgeted Operating projects (e.g. Budgeted Maintenance, Marketing, Demolition projects) open as at migration date with postings in the agreed migration time
- Closed Capital Projects with postings within the agreed timeframe.
- Closed Budgeted Operational projects with postings within the agreed time frame.
- Specifically also included are IT and R&I Projects (open as at migration date and (closed projects with postings the agreed timeframe) with postings postings in the agreed migration time
The data from legacy system excludes
- Project Definition in out of scope Company Codes
- Project Definitions in out of scope Plants.
- Project which has deletion indicator set.
- Project marked as closed and not included in 3, 4 and 5 above
- Non Budgeted Maintenance Projects.
Additionally WBS elements without any initial extract will be created in the DCT only, this includes -
- WBS elements with no reference to PPM items
- For the Provisions (One project per company code per GBU)
- Intercompany recharge (One Level 1 WBS per Company Code, Level 2 WBS per Trading Company Code)
List of source systems and approximate number of records
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | Relevant WBS elements | S/4 Hana | TBD | |
| WP2 | Relevant WBS elements | S/4 Hana | TBD | |
| DCT | S/4 Hana | TBD |
Inter-company recharge WBS elements are replicated to other S/4 Hana instances as per business process, refer ERP-165 - Getting issue details... STATUS for development.
Identification Logic
In principal any WBS element belonging
Capital project is a project that has any WBS elements with a Investment Profile. PRPS-IMPRF
Budgeted Opex is any other project that has any WBS elements with budget. WBS has entry in BPGE for value type 41
IT Project is a project that has a WBS element one of the following criteria
- in WP2 user field 1 starting with IT PRPS-USR00
- in PF2 user field 2 starts with IT PRPS-USR01
- has a WBS element Family is SBS IS or IT
R&I Project is a project meeting one of the following criteria,
- in PF2 Project ID starts with R- PROJ-PSPID
- in WP2 Project ID starts with RR PROJ-PSPID
- has a WBS element with WEGO ID field filled PRPS-ZZ_WEGO_ID
- has a WBS element family indicated as R&I or R&I Others
Industrial projects
- Capital project is a project that has any WBS elements with a Investment Profile. PRPS-IMPRF
- Budgeted Opex is any other project that has any WBS elements with budget. WBS has entry in BPGE for value type 41
- has a WBS element family indicated as GEC, Regular,RegAffairs, ING or Others
Facilities Projects
- Capital project is a project that has any WBS elements with a Investment Profile. PRPS-IMPRF
- Budgeted Opex is any other project that has any WBS elements with budget. WBS has entry in BPGE for value type 41
- has a WBS element family indicated as Facilities
Additional Information
Multi-language Requirement
The WBS element name is maintained in a single language only, no translation required.
Document Management
Not required.
Legal Requirement
Not applicable
Special Requirements
Not applicable
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| PRPS | POSID | PS_POSID | WBS element | CHAR | 24 | Mandatory |
| PRPS | POST1 | PS_POST1 | Description | CHAR | 40 | Mandatory |
| PRPS | VERNR | PS_VERNR | No. of Person Resp. | NUMC | 8 | Mandatory |
| PRPS | ASTNR | PS_ASTNR | Applicant no. | NUMC | 8 | Mandatory |
| PRPS | PBUKR | PS_PBUKR | Company code | CHAR | 4 | Mandatory |
| PRPS | PKOKR | PS_PKOKR | Controlling area | CHAR | 4 | System Generated |
| PRPS | PRCTR | PRCTR | Profit Center | CHAR | 10 | Mandatory |
| PRPS | PRART | PS_PRART | Project Type | CHAR | 2 | Mandatory |
| PRPS | PLAKZ | PS_PLAKZ | Planning Element | CHAR | 1 | System Generated |
| PRPS | BELKZ | PS_BELKZ | Acct asst elem. | CHAR | 1 | Conditional |
| PRPS | FAKKZ | PS_FAKKZ | Billing Element | CHAR | 1 | Conditional |
| PRPS | AKOKR | PS_AKOKR | CA req. cost center | CHAR | 4 | Mandatory |
| PRPS | AKSTL | PS_AKSTL | Request. cost center | CHAR | 10 | Conditional |
| PRPS | ABUKR | PS_ABUKR | Requesting co. code | CHAR | 4 | Mandatory |
| PRPS | FKSTL | PS_FKSTL | Responsible CC | CHAR | 10 | Conditional |
| PRPS | FKOKR | PS_FKOKR | CA resp. cost center | CHAR | 4 | Conditional |
| PRPS | FABKL | FABKL | Factory Calendar | CHAR | 2 | System Generated |
| PRPS | PWPOS | PS_PWPOS | Currency | CUKY | 5 | System Generated |
| PRPS | WERKS | WERKS_D | Plant | CHAR | 4 | Conditional |
| PRPS | SLWID | Field key | CHAR | System Generated | ||
| PRPS | USR08 | USR08 | Expected Capitalization Date | DAT | 8 | Conditional |
| PRPS | USR10 | USR10 | Cross System | CHAR | 1 | Conditional |
| PRPS | SCOPE | SCOPE_CV | Object class | CHAR | 2 | System Generated |
| PRPS | XSTAT | PS_XSTAT | Statistical | CHAR | 1 | Conditional |
| PRPS | KOSTL | PS_KOSTL | CCtr posted actual | CHAR | 10 | Conditional |
| PRPS | IMPRF | IM_PROFIL | Investment Profile | CHAR | 6 | Conditional |
| PRPS | FUNC_AREA | FKBER | Functional Area | CHAR | 16 | Conditional |
| PRPS | PSPHI | PS_PSPID | Project Definition | CHAR | 24 | Mandatory |
| PRPS | STUFE | PS_STUFE | Level | CHAR | 3 | Mandatory |
| PRHI | UP | PS_PHIUP | WBS_UP | NUMC | 8 | System Generated |
| PRHI | LEFT | PS_PHILE | WBS_LEFT | NUMC | 8 | System Generated |
| PRPS | SYCAP_OPX | CAPEX/ OPEX | CHAR | 10 | Conditional | |
| PRPS | SYMAIN_EVT | Maintenance event | CHAR | 40 | Conditional | |
| PRPS | SYTRADE_CC | Trading company code | CHAR | 4 | Conditional | |
| PRPS | SYSITE | Site | CHAR | 50 | Conditional |
Data Cleansing
Some Data cleansing tasks are set out in CNV-1024 which deals with projects.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
1 | C3 | Projects with no actuals / Commitment in agreed timeframe | If the projects do not have any actual or commitments in the past year, and is not used as account assignment on open maintenance orders then set the projects should have status CLSD (CJ20N) | Identifies Old project which can be closed | WP2/PF2 |
| 2 | C2 | Open WBS elements, not relevant for migration, with assigned maintenance orders. | Scope of report moved to CNV-9005 | ||
| 3 | C1 | Open Projects where WBS Family is empty | An open project which falls in the scope of selection where the WBS Family cannot be determined. | Users to update the WBS Family field on open projects. | WP2/PF2 |
| 4 | C3 | Projects with locked/on hold status | Open projects with active status as per selection criteria | Users to close projects based on existing project status | WP2/PF2 |
Open Projects without posting since selected financial year
Selection
Selection Option for Start Fiscal year.
Identify projects going to PPM, using the logic for WBS element relevancy, from prep report ZACTIVE_PROJECT_OPEN_CLOSED = OPEN and ZACTIVE=TRUE
Returns projects with NO entries for WBS elements in tables COSS and COSP where fiscal year is greater or equal to selected fiscal year.
Where project created on date is less than or equal to today minus 365. PROJ-ERDAT.
COSS-OBJNR = WBS element Object number and GJAHR greater or equal to selected fiscal year. If any records returned then continue to next Project definitions.
COSP-OBJNR = WBS element Object number and GJAHR greater or equal to selected fiscal year. If any records returned then continue to next Project definitions.
Output
Project Number (PROJ-PSPID)
Project Description (PROJ-POST1)
Company Code (PROJ-VBUKR)
Profit Center (PROJ-PRCTR)
Plant (PROJ-WERKS)
Responsible Person (PROJ-VERNA)
Applicant (PROJ-ASTNA)
Global Business Unit (PROJ-ZZGBU)
Open WBS elements, not relevant for migration, with assigned maintenance orders
Scope of report moved CNV-9005 Work Order
Open Projects where WBS Family is empty
Selection
This is done for Projects which fall within the scope of migration (ZACTIVE = TRUE)
And for
Open projects (ZACTIVE_PROJECT_OPEN_CLOSED = "Open") with
Budget Opex or Capital projects (ZACTIVE_PROJECT_CATEGORY NE "Uncatogorised")
where the Company code and plant is relevant for migration.
but which does not have WBS Family
For PF2 from PROJ-ZZFAMIL = ''
For WP2 show projects where count of PRPS-Z_FAMIL not equal to blank = 0
Output
Project Number (PROJ-PSPID)
Project Description (PROJ-POST1)
Company Code (PROJ-VBUKR)
Profit Center (PROJ-PRCTR)
Plant (PROJ-WERKS)
Responsible Person (PROJ-VERNA)
Applicant (PROJ-ASTNA)
Global Business Unit (PROJ-ZZGBU)
Investment Reason (PROJ-ZZ_IZWEK), display text from T087J
Open Projects with locked status
Selection
Identify projects going to PPM, using the logic for WBS element relevancy, from prep report ZACTIVE_PROJECT_OPEN_CLOSED = OPEN with status locked, on hold, or user status locked.
Using project definition object number select from JEST-STAT = Master-data Locked I0065 OR Time Locked E0001 OR Commitment Locked E0002
Output
Project Number (PROJ-PSPID)
Project Description (PROJ-POST1)
Company Code (PROJ-VBUKR)
Profit Center (PROJ-PRCTR)
Plant (PROJ-WERKS)
Responsible Person (PROJ-VERNA)
Applicant (PROJ-ASTNA)
Global Business Unit (PROJ-ZZGBU)
System Status (JEST-STAT) display text from TJ02T-TXT30 for statuses starting with I and where Language is English
User Status (JEST-STAT) display text from TJ30T-TXT30, where STSMA=ZPS00001 for statuses starting with E and where Language is English
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Not applicableExtraction
Extract data from a source into Syniti Migrate
. There are 2 possibilities:
- The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
1 | Confirm scope and extraction approach for each ECC source systems WP2, PF2 (direct DB or manual extract) | Data Team (I2M), Data Team (Syniti) |
2 | Establish and validate Syniti connectivity to both ECC source systems | Technical / Basis Team, Data Team (Syniti) |
3 | Perform full data extraction from relevant SAP WBS elements from both source systems WP2, PF2 | Data Team (Syniti) |
4 | Extract WBS via the application layer for additional validations for Manual Data Collection using DCTs | Data Team (I2M) |
5 | Apply agreed Relevancy Criteria to filter only applicable WBS records for S/4HANA | Data Team (I2M), Data Team (Syniti) |
6 | In case of restricted access or connectivity issues, receive pre-extracted reports/files from source system team and upload to Syniti Migrate manually | Data Team (I2M), Data Team (Syniti) |
8 | Perform data quality checks on extracted records (e.g., missing fields, invalid dates, incorrect formats) | Data Team (I2M), Data Team (Syniti) |
9 | Review and approve extracted data sample sets from each source system before transformation begins | Business / Functional Team |
Selection Screen
Not applicable| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.WBS - CAPEX, OPEX, Statistical Project Based DCT Rules: Used for Provision and Recharge Projects
Link DCT to the DCT 1024 from Conversion specification https://wiki.syensqo.com/display/public/ER/CNV-1024+Project+Definition
Source System is always construct.
| Field Name | Field Description | Rule |
|---|---|---|
| PSPHI | Project Definition | Project ID assigned to the WBS elements. Refer table PROJ-PSPHI for allowed values. Dropdown values from DCT1024 - PSPHI It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| POSID | WBS element | Unique Identifier for the WBS Element, as per project coding mask F-000000-00-00-XX-XX-XX Internal Information Validation required, WBS Element ID must begin with the same Current Number for Project. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| POST1 | Description | 40 character description of the WBSE. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| VERNR | No. of Person Resp. | This field represents the position of the Person Responsible for a WBS Element. It will be derived from the Project Definition and can be overwritten. Dropdown values from TCJ04-PS_VERNR It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| ASTNR | Applicant no. | This field represent the position of the Project Financial Controller. It will be derived from the Project Definition and can be overwritten. Dropdown values from TCJ05-ASTNR. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| PRCTR | Profit Center | In Syway, Profit Center represent a plant or a site or generic for GBU. It will be derived from the Project Definition and can be overwritten. Dropdown values from CEPC-PRCTR It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| PRART | Project Type | It is an attribute that serve as classification field that help to define the nature, purpose, and governance of a WBS element. They are useful for reporting, controlling, and compliance alignment. Internal Information Dropdown values from TCJ1-PRART. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| BELKZ | Acct asst elem. | Tooltip : This indicator enables financial posting on the WBS element. Internal Information It will be checked in below conditions- It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template where required and blank when not. |
| FAKKZ | Billing Element | Tooltip: This indicator enables for revenue postings. Required at level 2 for Intercompany Recharge projects Internal Information Only relevant for project profile of project maintained in PSPHI is a Recharge Project |
| AKSTL | Request. cost center | The Requesting Cost Center that owns the asset. Required only if the Requesting Cost Center is different to the Responsible Cost Center. If filled the Requesting Cost center must be in same company code as the Responcible Cost Center. This Cost Centre is automatically copied to AUC. Refer master data table field CSKS-KOSTL for allowed values. A preload check is to be done to confirm that the Company Code of the Request. cost center is equal to the company code to the Company Code of the Responsible Cost Center's (FKSTL) Company Code. |
| FKSTL | Responsible CC | Cost Center responsible for delivery of work. Refer master data table field CSKS-KOSTL for allowed values. It is a Required Field for all WBS elements flagged as account assignment element. Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| WERKS | Plant | Plant represent a site of the WBS element. Mandatory for all WBS elements. It is a conditional field used in conjunction with site. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| USR10 | Cross System | This checkbox field, will be selected when inter-company services are needed for a WBS element. |
| KOSTL | CCtr posted actual | This field represents the receiver Cost Center of actual cost for financial posting on the statistical WBS element. This field is optional and available only on statistical WBS elements - WBS elements of project with Project Profile "ZPS0001" where Project Type is Capital Lease Dropdown values from KOSTL |
| FUNC_AREA | Functional Area | Functional Area is an organisational unit used to classify expenses based on their purpose or function. Dropdown values from TFKB-FKBER. |
| STUFE | Level | In a project, WBS elements are structured across multiple levels to form a tree-like hierarchy for better project controlling and monitoring. |
| UP | WBS_UP | This field represents the immediate superior WBS element required for establishing parent-child relationships in the WBS hierarchy, this is a required field for level 2 WBS elements. Can only be a WBS element within the same Project As per project coding mask F-000000-00-00-XX-XX-XX Internal Information Can only be a WBS element within the same project. It is a Required Field for level 2 and lower: Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| LEFT | WBS_LEFT | This field represents the left-adjacent WBS element in the same hierarchy level required for navigating sibling relationships within a WBS hierarchy. Can only be a WBS element within the same Project. As per project coding mask F-000000-00-00-XX-XX-XX Internal Information Can only be a WBS element within the same project. Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| SYTRADE_CC | Trading company code | Tooltip: This field will be applicable when Project Type = Intercompany Recharge. Mandatory at Level 2 WBS to determine the trading company for intercompany recharges Internal Information |
| SYSITE | Site | Tooltip: A Site represents the highest-level physical boundary of Syensqo — a distinct, real-world physical location where Syensqo operates or maintains responsibility. Internal Information Currently this is a free text field which is optional in conjunction with plant - either plant or Site must be filed. No Site will be maintained for IAS19 Provision and ESG fines WBS elements i.e. with Project Types 14 & 22. this i mean |
| Business Reviewed |
WBS - CAPEX, OPEX, Statistical ECC Extracted Data DCT Rules: Where WBS elements have ECC source data
| Field Name | Field Description | Rule |
|---|---|---|
| PSPHI | Project Definition | Project ID assigned to the WBS elements. Internal Information This is a display only field with legacy project ID PROJ-PSPID from Preparation report It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| POSID | WBS element | Unique Identifier for the WBS Element Internal Information This is a display only field PRPS-POSID from Preparation report Validation required, WBS Element ID must begin with the same Current Number for Project. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| POST1 | Description | 40 character description of the WBSE. Internal Information Display only field, PRPS-POST1, description from Preparation report It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| VERNR | No. of Person Resp. | This field represents the position of the Person Responsible for a WBS Element. It will be derived from the Project Definition and can be overwritten. Internal Information Display only field, the PRPS-VERNR responsible person from Preparation report Dropdown values from TCJ04-PS_VERNR It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| ASTNR | Applicant no. | This field represent the position of the Project Financial Controller. It will be derived from the Project Definition and can be overwritten. Internal Information Display only field from Legacy PRPS-ASTNR, applicant from Preparation report Dropdown values from TCJ05-ASTNR. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| PRCTR | Profit Center | In Syway, Profit Center represent a plant or a site or generic for GBU. It will be derived from the Project Definition and can be overwritten. Dropdown values from CEPC-PRCTR Internal Information Display only field from Legacy PRPS-PRCTR, applicant from Preparation report It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| LEG_IZWEK | Legacy Investment Reason | Display only field to help user select the correct project type Internal Information Display only field to help user select the correct project typefrom Legacy PRPS-IZWEK, investment reason from Preparation report Display the text using T087J from ECC |
| LEG_IZWEK_T | Legacy Investment Reason Description | Display only field to help user select the correct project type Internal Information Display the text using T087J from ECC for PRPS-IZWEK |
| LEG_PRART | Legacy Project Type | Display only field to help user select the correct project type Internal Information Display only field text from ECC TCJI based on PRPS-PRART, project type from Preparation report |
| LEG_PRART_T | Legacy Project Type Description | Display only field to help user select the correct project type Internal Information Display text from TCJI from Preparation report
|
| PRART | Project Type | It is an attribute that serve as classification field that help to define the nature, purpose, and governance of a WBS element. They are useful for reporting, controlling, and compliance alignment. Internal Information It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| BELKZ | Acct asst elem. | This indicator enables financial posting on the WBS element. Internal Information Display only field from Legacy PRPS-BELKZ, account assignment from Preparation report. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template where required and blank when not. |
| FAKKZ | Billing Element | Only relevant for project profile of project maintained in PSPHI is a Recharge Project Internal Information Display only field, value is always false. |
| AKSTL | Request. cost center | The Requesting Cost Center that owns the asset. Required only if the Requesting Cost Center is different to the Responsible Cost Center. If filled the Requesting Cost center must be in same company code as the Responcible Cost Center. This Cost Centre is automatically copied to AUC. Internal Information Display only field from Legacy PRPS-AKSTL, Refer master data table field CSKS-KOSTL for allowed values. |
| FKSTL | Responsible CC | Cost Center responsible for delivery of work. Refer master data table field CSKS-KOSTL for allowed values. Internal Information Display only field from Legacy PRPS-FKSTL,
It is a Required Field: Required for all account assigned WBS elements. Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| WERKS | Plant | Plant represent a site of the WBS element. Mandatory for all WBS elements. Internal Information Display only field from Legacy PRPS-WERKS, It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| LEG_USR08 | Legacy Date WBS date field | Display only field to help user select the correct Expected Captillzation Date Internal Information Display only field from Legacy PRPS-USR08/USR09 |
| LEG_PLSEZ | Legacy Project End Date | Display only field to help user select the correct Expected Captillzation Date Internal Information Display only field from Legacy PRPS-USR08/USR09 |
| USR08 | Expected Capitalization Date | Expected Capitalization date marks the anticipated execution of the AUC final settlement, restricted to WBS elements with Investment Profile. Date Field. Internal Information It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template where Investment reason is maintained |
| USR10 | Cross System | This checkbox field, will be selected when inter-company services are needed for a WBS element. |
| KOSTL | CCtr posted actual | This field represents the receiver Cost Center of actual cost for financial posting on the statistical WBS element. This field is optional and available only statistical WBS elements
Internal Information Display only field from PRPS-KOSTL Dropdown values from KOSTL |
| IMPRF | Investment Profile | Investment Profile on WBS element is used to enable auto generation of AuC w.r.t. predefined asset class. Applicable for CAPEX projects (with Project Profile ZPS0001) Internal Information Display only field from PRPS-IMPRF Dropdown values from TAPRF-IVPRO for allowed values. Preload validation required to ensure field is filled when required. |
| FUNC_AREA | Functional Area | Functional Area is an organisational unit used to classify expenses based on their purpose or function. Internal Information Preload validation required to ensure field is filled when required. Dropdown values from TFKB-FKBER. |
| STUFE | Level | In a project, WBS elements are structured across multiple levels to form a tree-like hierarchy for better project controlling and monitoring. Internal Information Display only level based on the PREP report |
| SYCAP_OPX | CAPEX / OPEX | This field identifies expense as CAPEX or OPEX. Internal Information Display only level based on the PREP report Drop down field selection will allow any of CAPEX, OPEX or blank entry. Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| SYMAIN_EVT | Maintenance event | This field is used to determine the settlement rule receiver for the relevant maintenance Work Order. This field is used to determine the settlement rule receiver for the relevant maintenance Work Order. This field will be applicable for projects with Project Profile ZPS0001 & ZPS0002 at level 3 & 4 WBS element. Internal Information Data source for this field will be T352R-REVNR. |
<CR0456 - WBS Number Generation Start> Phase | Phase | Tooltip To allow for assignment of WBS element to the correct phase of the project where projects have multiple phase level WBS elements. If left blank the WBS element will be assigned to the execution (or equivalent phase) Internal Information This is a dropdown field of Phase level WBS Elements as maintained in the DCT WBS - Project Template Assignment defined below. Dropdown to display Item Type, ITEM_PHASE and WBS Description <CR0456 - WBS Number Generation End> |
| ZREVIEW_STATUS | Review Status | Tooltip Allows indication of records readiness for load. Internal Information Dropdown with review status values |
WBS - CAPEX, OPEX, Statistical PPM relevant DCT Rules: Used for Direct Asset Purchase, Capital Lease and Capital Spares
Source System is CONSTRUCT_2
| Field Name | Field Description | Rule |
|---|---|---|
| PSPHI | Project Definition | Project ID assigned to the WBS elements. Dropdown values from DCT1022 - PSPHI It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| POSID | WBS element | Unique Identifier for the WBS Element, as per project coding mask F-000000-00-00-XX-XX-XX Internal Information Validation required, WBS Element ID must begin with the same Current Number for Project. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| POST1 | Description | 40 character description of the WBSE. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| VERNR | No. of Person Resp. | This field represents the position of the Person Responsible for a WBS Element. It will be derived from the Project Definition and can be overwritten. Dropdown values from TCJ04-PS_VERNR It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| ASTNR | Applicant no. | This field represent the position of the Project Financial Controller. It will be derived from the Project Definition and can be overwritten. Dropdown values from TCJ05-ASTNR. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| PRCTR | Profit Center | In Syway, Profit Center represent a plant or a site or generic for GBU. It will be derived from the Project Definition Internal Information Display only read from related PPM Item Profit center field Dropdown values from CEPC-PRCTR It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| PRART | Project Type | It is an attribute that serve as classification field that help to define the nature, purpose, and governance of a WBS element. They are useful for reporting, controlling, and compliance alignment. Internal Information Dropdown values from TCJ1-PRART. It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template. |
| BELKZ | Acct asst elem. | Tooltip : This indicator enables financial posting on the WBS element. Internal Information It will be checked in below conditions- It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template where required and blank when not. |
| FAKKZ | Billing Element | Tooltip: This indicator enables for revenue postings. Required at level 2 for Intercompany Recharge projects Internal Information Only relevant for project profile of project maintained in PSPHI is a Recharge Project |
| AKSTL | Request. cost center | Tooltip Requesting Cost Center that owns the asset. The reqc CC must be in same company code as the resp CC. This CC is automatically copied to AUC. Internal Information Refer master data table field CSKS-KOSTL for allowed values. A preload check is to be done to confirm that the Company Code of the Request. cost center is equal to the company code to the Company Code of the Responsible Cost Center's (FKSTL) Company Code. |
| FKSTL | Responsible CC | Cost Center responsible for delivery of work. Internal Information Refer master data table field CSKS-KOSTL for allowed values. It is a Required Field: Required for all account assigned WBS elements. Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| WERKS | Plant | Plant represent a site of the WBS element. Mandatory for all WBS elements. Internal Information Display only read from related PPM Item plant field It is a Required Field: Preload Check to be done to confirm that this is field in the Data Collection Template |
| USR10 | Cross System | This checkbox field, will be selected when inter-company services are needed for a WBS element. |
| KOSTL | CCtr posted actual | Tooltip This field represents the receiver Cost Center of actual cost for any actual financial posting on the statistical WBS element. Internal Information Dropdown values from KOSTL |
| IMPRF | Investment Profile | Tooltip Investment Profile on WBS element is used to enable auto generation of AuC w.r.t. predefined asset class. - at level 2 WBS element if the CAPEX field is selected and project type is "Capital Spares" Internal Information Dropdown values from TAPRF-IVPRO for allowed values. Preload validation required to ensure field is filled when required. |
| FUNC_AREA | Functional Area | Functional Area is an organisational unit used to classify expenses based on their purpose or function. Dropdown values from TFKB-FKBER. |
| STUFE | Level | In a project, WBS elements are structured across multiple levels to form a tree-like hierarchy for better project controlling and monitoring. |
| UP | WBS_UP | This field represents the immediate superior WBS element required for establishing parent-child relationships in the WBS hierarchy, this is a required field for level 2 WBS elements. Can only be a WBS element within the same Project As per project coding mask F-000000-00-00-XX-XX-XX Internal Information Can only be a WBS element within the same project. It is a Required Field for level 2 and lower: Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| LEFT | WBS_LEFT | This field represents the left-adjacent WBS element in the same hierarchy level required for navigating sibling relationships within a WBS hierarchy. Can only be a WBS element within the same Project. As per project coding mask F-000000-00-00-XX-XX-XX Internal Information Can only be a WBS element within the same project. Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| SYCAP_OPX | CAPEX / OPEX | This field identifies expense is CAPEX or OPEX. Internal Information Drop down field selection will allow any of CAPEX, OPEX or blank entry. Preload Check to be done to confirm that this is field in the Data Collection Template when required. |
| SYMAIN_EVT | Maintenance event | This field is used to determine the settlement rule receiver for the relevant maintenance Work Order. This field is used to determine the settlement rule receiver for the relevant maintenance Work Order. This field will be applicable for projects with Project Profile ZPS0001 & ZPS0002 at level 3 & 4 WBS element. Internal Information Data source for this field will be T352R-REVNR. |
| SYSITE | Site | Tooltip: A Site represents the highest-level physical boundary of Syensqo — a distinct, real-world physical location where Syensqo operates or maintains responsibility. Internal Information Currently this is a free text field which is optional in conjunction with plant - either plant or Site must be filed. |
| ZREVIEW_STATUS | Review Status | Tooltip Allows indication of records readiness for load. Internal Information Dropdown with review status values |
In conjunction with DCT business user will be provided with Person Responsible / Applicant list for reference.
I2M - Item Type to Phase 2 WBS Template - this DCT will be maintained by the data team and is used in transformation
| Field Name | Field Description | Rule |
|---|---|---|
| ITEM_TYPE | ITEM_TYPE | Item type Internal Information Refer configuration table field /RPM/ITEM_TYPE- ITEM_TYPE for allowed values. It is a Required Field and Key |
| ITEM_PHASE | ITEM_PHASE | Phase Internal Information Dropdown field from /RPM/ITEM_PHASE Required and Key |
| WBS_ELEMENT | WBS_ELEMENT | WBS Internal Information Dropdown field from DCT 1019 WBS Element - POSID, display Code and Description Required |
| WBS_ELEMENT_DESC | DESCRIPTION | Phase Description Required |
| ZDefault | Default | Used as the default phase when no phase assignment is done for the WBS element |
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in Syniti Migrate
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Obtain DCT Sign-off from Business | Data Team |
2 | Execute and Load and perform Transformation | Data Team |
3 | Monitor the transformation progress and ensure performance and completion is within allowed timeframe | Data team |
4 | Review and Validate Error and Preload Reports | Data Team |
5 | Generate data load count. | Data team |
6 | Generate Load Files | Data Team |
7 | Log errors as defects, if any and address resolutions. Close defects. | Data team |
8 | Re-transform and re-validate the Pre-load reports if necessary. | Data team |
9 | Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off. | Business |
10 | Analyze and resolve any pre-load defects logged by business. | Data team |
11 | Repeat steps 7 to 10 if necessary | Data team |
12 | Proceed to pre-load validations | Data team |
Transformation Rules.
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2/WP2 | PRPS | POSID | WBS element | S/4 Hana | PRPS | POSID | WBS element | For sourceWBS element numbering is based on the rules set out in section Parent/Number/Level Determination below. |
| 2 | DCT | PRPS | POSID | WBS element | S/4 Hana | PRPS | POSID | WBS element | Manually copy from Non ECC source |
| 3 | PF2/WP2 | PRPS | POST1 | Description | S/4 Hana | PRPS | POST1 | Description | Copy from source to target system |
| 4 | DCT | PRPS | POST1 | Description | S/4 Hana | PRPS | POST1 | Description | Manually copy from Non ECC source |
| 5 | PF2/WP2 | PRPS | VERNR | No. of Person Resp. | S/4 Hana | PRPS | VERNR | No. of Person Resp. | Value Mapping: Responsible Person to new Person Responsible Position ID |
| 6 | DCT | PRPS | VERNR | No. of Person Resp. | S/4 Hana | PRPS | VERNR | No. of Person Resp. | Manually copy from Non ECC source |
| 7 | PF2/WP2 | PRPS | ASTNR | Applicant no. | S/4 Hana | PRPS | ASTNR | Applicant no. | Value Mapping: Applicant to new Applicant Position ID |
| 8 | DCT | PRPS | ASTNR | Applicant no. | S/4 Hana | PRPS | ASTNR | Applicant no. | Manually copy from Non ECC source |
| 9 | PF2/WP2 | PRPS | PBUKR | Company code | S/4 Hana | PRPS | PBUKR | Company code | Value Mapping: Old to New Company Code |
| 10 | DCT | S/4 Hana | PRPS | PBUKR | Company code | If Source of WBS is construct then Copy from Project Definition using target PSPHI | |||
| 11 | All | S/4 Hana | PRPS | PKOKR | Controlling area | Default to "CO01" | |||
| 12 | PF2/WP2 | PRPS | PRCTR | Profit Center | S/4 Hana | PRPS | PRCTR | Profit Center | Value Mapping: Old to New Profit Centre |
| 13 | DCT | PRPS | PRCTR | Profit Center | S/4 Hana | PRPS | PRCTR | Profit Center | Manually copy from Non ECC source |
| 14 | ALL | PRPS | PRART | Project Type | S/4 Hana | PRPS | PRART | Project Type | Manually copy from Non ECC source |
| 15 | PF2/WP2 | PRPS | BELKZ | Acct asst elem. | S/4 Hana | PRPS | BELKZ | Acct asst elem. | Copy from source to target system |
| 16 | DCT | PRPS | BELKZ | Acct asst elem. | S/4 Hana | PRPS | BELKZ | Acct asst elem. | Manually copy from Non ECC source |
| 17 | All | PRPS | FAKKZ | Billing Element | S/4 Hana | PRPS | FAKKZ | Billing Element | Manually copy from Non ECC source |
| All | S/4 Hana | PRPS | AKOKR | CA req. cost center | Default to "CO01" | ||||
| PF2/WP2 | PRPS | AKSTL | Request. cost center | S/4 Hana | PRPS | AKSTL | Request. cost center | Value Mapping: Old to New Cost Centre | |
| DCT | PRPS | AKSTL | Request. cost center | S/4 Hana | PRPS | AKSTL | Request. cost center | Manually copy from Non ECC source If Blank then Copy from FKSTL | |
| ALL | S/4 Hana | PRPS | ABUKR | Requesting co. code | Default from Cost Center using AKSTL | ||||
| 18 | PF2/WP2 | PRPS | FKSTL | Responsible CC | S/4 Hana | PRPS | FKSTL | Responsible CC | Value Mapping: Old to New Cost Centre |
| 19 | DCT | PRPS | FKSTL | Responsible CC | S/4 Hana | PRPS | FKSTL | Responsible CC | Manually copy from Non ECC source |
| 20 | All | S/4 Hana | PRPS | FKOKR | CA resp. cost center | Default to "CO01" | |||
| 21 | All | S/4 Hana | PRPS | FABKL | Factory Calendar | Copy Factory Calendar from Plant using Field WERKS | |||
| 22 | PF2/WP2 | PRPS | PWPOS | Currency | S/4 Hana | PRPS | PWPOS | Currency | Copy from Project Definition |
| 23 | DCT | S/4 Hana | PRPS | PWPOS | Currency | Copy from Project Definition | |||
| 24 | PF2/WP2 | PRPS | WERKS | Plant | S/4 Hana | PRPS | WERKS | Plant | Value Mapping: Old to New Plant |
| 25 | DCT | PRPS | WERKS | Plant | S/4 Hana | PRPS | WERKS | Plant | Manually copy from Non ECC source |
| 26 | ALL | PRPS | USR08 | Expected Capitalization Date | S/4 Hana | PRPS | USR08 | Expected Capitalization Date | Manually copy from Non ECC source |
| 27 | ALL | PRPS | USR10 | Cross System | S/4 Hana | PRPS | USR10 | Cross System | Manually copy from Non ECC source |
| 28 | ALL | S/4 Hana | PRPS | SCOPE | Object class | Copy from Project Definition | |||
| 29 | ALL | S/4 Hana | PRPS | XSTAT | Statistical | Set to X for WBS Elements of Project Profile ZPS0003 Set to X for WBS elements with Project Type 16 | |||
| 30 | DCT | PRPS | KOSTL | CCtr posted actual | S/4 Hana | PRPS | KOSTL | CCtr posted actual | Manually copy from Non ECC source |
| 31 | PF2/WP2 | PRPS | IMPRF | Investment Profile | S/4 Hana | PRPS | IMPRF | Investment Profile | Value Mapping: Old to new Investment Profile |
| 32 | DCT | PRPS | IMPRF | Investment Profile | S/4 Hana | PRPS | IMPRF | Investment Profile | Manually copy from Non ECC source |
| 33 | PF2/WP2 | S/4 Hana | PRPS | FUNC_AREA | Functional Area | Copy from Project Definition PROJ-FUNC_AREA | |||
| 34 | DCT | PRPS | FUNC_AREA | Functional Area | S/4 Hana | PRPS | FUNC_AREA | Functional Area | Manually copy from Non ECC source |
| 35 | PF2/WP2/CONSTRUCT_2 | PRPS | PSPHI | Project Definition | S/4 Hana | PRPS | PSPHI | Project Definition | Project Definition number determination rules. |
| 36 | DCT | PRPS | PSPHI | Project Definition | S/4 Hana | PRPS | PSPHI | Project Definition | Manually copy from Non ECC source |
| 37 | ALL | PRPS | STUFE | Level | S/4 Hana | PRPS | STUFE | Level | Manually copy from Non ECC source |
| 38 | ALL | PRPS | UP | WBS_UP | S/4 Hana | PRPS | PRHI-UP | WBS_UP | Manually copy from Non ECC source |
| 39 | ALL | PRPS | LEFT | WBS_LEFT | S/4 Hana | PRPS | PRHI-LEFT | WBS_LEFT | Manually copy from Non ECC source |
| 40 | ALL | PRPS | SYCAP_OPX | Capex / OPEX | S/4 Hana | PRPS | SYCAP_OPX | CAPEX/ OPEX | Manually copy from Non ECC source |
| 41 | ALL | PRPS | SYMAIN_EVT | Maintenance event | S/4 Hana | PRPS | SYMAINT_EVT | Maintenance event | Manually copy from Non ECC source |
| 42 | ALL | PRPS | SYTRADE_CC | Trading company code | S/4 Hana | PRPS | SYTRADE_CC | Trading company code | Manually copy from Non ECC source |
| 43 | ALL | PRPS | SYSITE | S/4 Hana | PRPS | SYSITE | Site | Manually copy from Non-ECC source |
List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.
The following does not apply to WBS elements created with Source system Construct DCT.
- The transformation of WBS element structure from the legacy systems is changed from a multi-level structure to a formal phase based approach with adherence to pre-approved project structures across all project types.
- To facilitate this only WBS elements flagged account assignment from PF2/WP2 will be created and assigned to the project structures in S/4 which has already created during PPM item creation (CNV-1022), (relevancy criteria for migration is the same), while a mapping of WBS elements will be provided as output.
The following is executed for WBS elements across a single project at a time.
Parent/Number/Level Determination
<CR0456 - WBS Number Generation Start>
Project Definition number determination rules.
Project Definitions and phase level WBS elements for PPM relevant projects (All projects with source systems Construct_2, SAPWP2 and SAPPF2) are created during load of 1022 Portfolio Items. As part of the load the Legacy Project ID is stored in S/4 PROJ - USR00. This field will be used to retrieve the new Project Definition number from PROJ-PSPID_EDIT.
This is the target Project Definition Number PSPHI
Phase level WBS element number determination rules.
1. Target Structure, use mapping table between Item type of the associated PPM item and Project template, DCT I2M - Item Type to Phase 2 WBS Template, as basis for the maintenance of the project structure.
The Project component of the WBS_ELEMENT, first 8 characters, template DCT is replaced with the target PSPHI retrieved above.
examples
| ITEM_TYPE | ITEM_PHASE | WBS_ELEMENT | PSPHI | PHASE - POSID |
| Z003 - Industrial 2 Phase | SG02-TC | T-900003-01 | A-000001 | A-000001-01 |
| Z004 - New Product Introduction | SG02 | T-900004-01 | A-000002 | A-000002-01 |
| Z004 - New Product Introduction | SG03 | T-900004-02 | A-000002 | A-000002-02 |
Level and Number determination
The account assignment WBS elements from the DCT is now mapped to the phase and the new WBS Number determined.
1. In order to do this we use the phase assigned to the wbs in the DCT, if no phase is assigned in the source then the default phase from the Template is assigned.
2. Sort the WBS element by Phase.
3. WBS elements are assigned to be assigned to the WBS element from the mapping table
3.1 Source AUC - From source system select all WBS elements for the project Investment Profiles
Loop by Source AUC WBS element assigning if count is >0
TARGET - PRHI-UP = PHASE-POSID of the phase assigned
Target - POSID = PHASE-POSID + .01 (incrementing by .01 for each subsequent WBS element (such that first would be A.0000001.01 second A.0000001.02 and so forth)
TARGET - PRPH-LEFT = Empty for first WBS at level, after that, previous WBS at same level
Target - STUFE = PARENT STUFE +1
3.1.1 Lower Levels - For each SOURCE AUC see if any lower level WBS elements with account assignment active and Settlement receiver object is a WBS element in subsequent levels taking note that the relationship may be more than 1 level lower. This is done using PSHI where SOURCE AUC WBS element is maintained in up.
Loop by Source CHILD WBS element assigning
TARGET - PRPH-UP =Target - POSID from 3.1 above.
TARGET - POSID = POSID from 3.1 above + .01 (incrementing by .01 for each subsequent WBS element (such that first would be A.0000001.01.01 second A.0000001.01.02 and so forth)
TARGET - PRPH-LEFT = Empty for first WBS at level, after that, previous WBS at same level
TARGET - STUFE= PARENT STUFE +1.
3.2 Source Opex - Any WBS elements which have not been assigned to the structure is now assigned to PARENT WBS from 1.1 This takes care of situations where there is no Capital settlements in the parent child relationships but where postings exist.
Loop at SOURCE OPEX WBS element - assigning
TARGET - PRHI-UP = PARENT from 1 above.
Target - POSID = Parent PSPNR + .01 (increments continue )
TARGET - STUFE= PARENT STUFE +1
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
| T001 | Value Mapping: Currency From Company Code |
| Company Code | Value Mapping: BUKRS: Old Company Code to New Company Code |
| Controlling Area | Value Mapping: Old to New Controlling Area |
| Cost Centre | Value Mapping: Old to New Cost Centre |
| Plant | Value Mapping: Old Plant to New Plant |
| Profit Center | Value Mapping: Old to New Profit Centre |
| Applicant | Value Mapping: Applicant to new Applicant Position ID |
| Person Responsible | Value Mapping Responsible Person to new Person Responsible Position ID |
| Investment Profile | Value Mapping: Investment Profile Old to New |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Ensure all the fields that require value mapping, as stipulated. Mapping tables, have the correct values mapped and imported into tool. | Syway Data Team |
| 2 | Person Responsible and Applicant Position ID interface has been executed | Syway Data Team |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Record Count | SyWay I2M Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | SyWay I2M Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source (DCT) data. |
Business
Completeness
| Task | Action |
|---|---|
Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Load using transaction CNMASSCREATE or Migration cockpit | Data Team |
2 | Load 3 records for < > to validate if data is loaded successfully without errors | Data Team |
3 | Load 3 records for < > to validate if data is loaded successfully without errors | Data Team |
4 | Proceed with full load if steps 2 and 3 are validated | Data Team |
5 | Validate few records loaded by accessing CN41N report | Data Team |
6 | Generate post load report if step 5 is validated | Data Team |
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
| 1 | Project Coding Mask |
| 2 | Company Code |
| 3 | Controlling Area |
| 4 | Project Type |
| 5 | Factory Calendar |
| 6 | Currency Code |
| 7 | Plant |
| 8 | Investment Profile |
| 9 | Functional Area |
| 10 | Define Tolerance Limits |
| 11 | WBS Status Profile |
| 12 | Settlement Profile |
| 13 | Budget Profile |
| 14 | Project Profile |
| 15 | Validations and Substitutions |
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| 1022 | Portfolio Item |
| 1024 | Project Definition |
| 1074 | Cost Center |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
| Invalid Data | Project Definition does not exist | Correct upload data, review load of CNV-1024 |
| Invalid Data | WBS Element already exist | Correct upload data. |
| Invalid Data | Person Responsible does not exist | Correct upload data |
| Invalid Data | Applicant does not exist | Correct upload data |
| Duplicate Records | More than one WBS element per Provision type per company code/plant based on project type | Remove Duplicate values from DCT |
| Duplicate Records | Trading partner is filled and appears more than once per Recharge Project | Remove Duplicate values from DCT |
| System Validation | All standard WBS element validations to be adhered to | Correct upload data |
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Count | SyWay I2M Data Team to verify the record count created in target S/4 HANA by accessing post load reports or standard reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Project Definition in target S/4 HANA were loaded correctly via Project Builder display and table PROJ |
Business
Completeness
| Task | Action |
|---|---|
| Verify template Project data - Project Definition | Extract data from PS report CN41N in S/4 Hana |
Accuracy
| Task | Action |
|---|---|
| Verify template Project data - Project Definition | Extract data from PS report CN41N in S/4 Hana |
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- WBS - CAPEX, OPEX, Statistical is in scope based on data design and any exception requested by business.
- The DCT should validate the project WBS coding mask numbering as per the SAP instance config.
- Validation / substitution might required to switched off at the time of load.