| Domain: Costing |
Responsibility area: Ensure Costing Allocations |
The objective of this operation is to guarantee that the delta FI-COPA inside COGS headings equals 0 at the end of the month during closure. It perform the necessary corrections based on defined and approved instructions and the necessary internal controls.
This procedure is applied to all companies WW.
In Z1K_Reconciliation we can enter directly inside of the documents by clicking in 1 of the documents below, depending on what we want to see:
|
In a general way, we might have several issues: FI posting without COPA posting
COPA posting without FI posting
Variance between the amount posted in FI and the amount posted in COPA for the same operation.
|
After performing the relevant checks and analyzing origins of differences, it is necessary to apply the appropriate corrections, according to this file. The corrections can be done via FI (this is the primary option that should be used almost every time) or via COPA, according to the type of difference. Note: A) For all corrections done in FI it's recommended to use document type S1, and it's mandatory to use one GL account which is mentioned in parameter G/L account for non-GBB:
B) For all corrections done in COPA it's mandatory to use one of the following value fields: FERTP Vbl.manuf.costs AND to fill the following characteristics: Material + Plant + Profit Center + Amount. Additionally, we need to check if which quantities should be posted in our correction:
A check by plant/material should be done after corrections have been applied to guarantee that everything is OK. At the end of the analysis and correction process, the gap should be equal or near 0. |
After performing the relevant checks and analyzing origins of differences, it is necessary to apply the appropriate corrections, according to this file. The corrections can be done via FI (this is the primary option that should be used almost every time) or via COPA (in exceptional situations only), according to the type of difference.
Note: For all manual corrections to be done, it's mandatory to use the accounts/document type/etc that appears in each variant: