Process: Product Costing

Responsibility area: Monitor the consistency of the monthly cost calculation

The analysis must be performed by the FRA every month between D-5 and D-1 12pm

Scope

 WW
Frequency

Monthly  
References

Attachments

N/A

OP.021  << >> OP.025



  Guideline  

I am informed that the CK40N was run and I can perform the analysis

 

 I request corrective actions when necessary

 I validate the result of the calculation by D-1 12pm

The check list must be performed in the frame of the control IAC 01.02