| Process: Product Costing |
Responsibility area: Monitor the consistency of the monthly cost calculation |
Guideline |
I am informed that the CK40N was run and I can perform the analysis |
| |
I request corrective actions when necessary |
| I validate the result of the calculation by D-1 12pm |
The check list must be performed in the frame of the control IAC 01.02 |