High- Level Specification
| Parameter | Value |
|---|---|
| Application System | SAP S/4HANA ROW, SAP S/4HANA China, SAP S/4HANA CUI |
| Business Process Reference |
Functional Overview
The purpose of this enhancement is to introduce a validation and logic control during the creation of Settlement Rules in Plant Maintenance Orders.
Settlement rules are created automatically in line with standard SAP behavior, based on the order type configuration and assigned settlement profile. For Turnaround scenarios, the settlement should go to the WBS Element associated with the Turnaround event.
The enhancement will intervene at the moment of Settlement Rule creation (not necessarily during Order Release), check whether the Maintenance Order is part of a Turnaround (via Revision/Maintenance Event field), and assign the correct receiver type accordingly.
Scope and Objectives
Enhancement of Settlement Rule creation logic in PM Orders (via BAdI or Enhancement Spot).
Automatic determination of WBS element for Turnaround-related orders.
Preserve standard settlement behavior for all non-Turnaround orders (no impact or modification).
To ensure correct and automated determination of the appropriate settlement receiver (WBS element for Turnaround scenarios), while all other PM orders follow the standard settlement rule logic, maintaining compliance with project cost accounting principles.
Step | Description | Comment |
|---|---|---|
| 1 | User creates a Maintenance Order or open an existing active order. | Change Maintenance Order Fiori app |
| 2 | User opens the Cost tab → triggers Settlement Rule creation or triggers Settlement Rule via releasing the order. | |
| 3 | System calls Enhancement (BAdI). | |
| 4 | Settlement Rule created accordingly. |
|
| 5 | Order can later be released and costs will settle correctly. |
Assumptions
Y3 notification type is available and configured in the system.
Relevant users have Fiori app access (Change Maintenance Order)
Each Turnaround Order has at least one Maintenance Event/Revision assigned.
Notifications with the same REVNR contain the correct WBS element to be used for settlement.
Standard SAP PM settlement logic is assumed to be functioning correctly for non-turnaround orders.
Users creating maintenance orders have appropriate authorization for reading notifications and WBS elements.
Dependencies
Fiori app configuration for notifications and orders.
Y3 Notification must have WBS element assigned.
- Y3 notification type is configured.
- To prevent creation of multiple Y3 notifications for the same Maintenance Event, an enhancement will be implemented under “ERP-349 UI Extensions in Create Maintenance Notification App.” This enhancement will ensure control and validation during notification creation.
BADI implementation must be activated in the system for settlement rule enhancement.
Integration with PS module (for WBS element retrieval) must be in place.
Other custom developments interacting with AFIH, VIQMEL, or settlement rules must not conflict with this logic.
Security, Integrity and Controls
The enhancement will follow SAP standard security and authorization framework to ensure data integrity and controlled access during the creation of Settlement Rules in Maintenance Orders.
Configuration Requirements
Not Applicable
Language Requirements
Not Applicable
Special Requirements
Ensure performance is not impacted when processing large numbers of orders or notifications.
If future integrations consume WBS or settlement data, ensure compliance with their data structure and format.
Design Rationale
Functional Requirements
Check Order:
Validate if the order is PM Order AUFK-AUTYP.
- Check if the Maintenance Event/Revision (REVNR) field is filled in the order (AFIH).
Retrieve Maintenance Event:
If REVNR exists, go to the maintenance notification (VIQMEL) and populate Y3 (QMART) with the REVNR value from the order.
Identify WBS Element:
For the maintenance notification matching this Maintenance Event/Revision (REVNR), retrieve the associated WBS element (PROID).
Settlement Rule Creation:
For all orders with this Maintenance Event/Revision, create settlement rule to the retrieved WBS element.
If no REVNR is found, continue with the standard settlement rule logic.
Proposed Technology to Use
| Component | Details |
|---|---|
| Enhancement Type | User Exit Implementation |
| User Exit | IWO10027 – Generate user-defined settlement rule |
When the system starts creating a settlement rule for an order, the exit IWO10027 is called.
Data Source Considerations
| Table | Field Name | Comments/Calculation/Field Manipulation |
|---|---|---|
| AFIH | AUFNR, REVNR | Maintenance Event assigned to the order. |
| VIQMEL | QMART, REVNR, PROID | Used to identify if there is a notification of type ‘Y3’ linked to the same Maintenance Event. If yes, PSP_NR (WBS Element) is used as the settlement receiver. |
Data Validation Considerations
| Table | Field Name | Comments/Calculation/Field Manipulation |
|---|---|---|
| AFIH | REVNR | Validate that the Maintenance Event field is not empty before proceeding to check in VIQMEL. |
| VIQMEL | QMART | Validate that QMART = ‘Y3’ |
| VIQMEL | PROID | Validate that PSP_NR (WBS Element) is filled for the identified notification; if missing, continue with the standard settlement rule logic. |
Custom Tables
Not Applicable
Master Data
Not Applicable
Configuration Table
Not Applicable
Selection Screen Enhancement
Not Applicable
Processing Logic
Trigger Point:
Enhancement is triggered when the system attempts to create a settlement rule for a maintenance order.
- The exit IWO10027 is called.
Check Maintenance Event:
Validate if the order is PM Order from table AUFK,
- Fill AUFNR, check if AUTYP = ''30''
- If it is, then read the order from table AFIH, field AUFNR
If field REVNR (Maintenance Event) is blank, proceed with standard SAP settlement rule logic.
Check Related Notification:
If REVNR is filled, check table VIQMEL for any notification where:
QMART = 'Y3'
REVNR = <Order’s REVNR>
Determine Settlement Receiver:
If such a notification exists:
Read PROID (WBS element) from the notification.
Create settlement rule for WBS element.
If no matching notification found:
Contunie with standard SAP settlement rule logic.
Validation Checks:
Ensure WBS element or Cost Center is valid and open for posting.
Volumetrics
Not Applicable
Performance Considerations
Not Applicable
Error Handling
Testing
How to Test
Test Conditions and Expected Results
| ID | Condition | Expected Result |
|---|---|---|
| 1 | Order with Maintenance Event/Revision and there is a valid Y3 notification with the same Maintenance Event/Revision. | System creates settlement rule for WBS Element (VIQMEL-PROID) |
| 2 | Order with Maintenance Event but Y3 notification missing WBS element | System continues with standard settlement rule logic. |
| 3 | Order without Maintenance Event/Revision | System continues with standard settlement rule logic. |
| 4 | Order with Maintenance Event/Revision but there is no Y3 notification with the same Maintenance Event/Revision. | System continues with standard settlement rule logic. |
Test Considerations/Dependencies
Other Information
Development Details
Package
| Package Name | Parent Package |
|---|---|
Enhancement Implementation
| Enhancement Type | Standard Definition Name | Custom Implementation Name | Design Rationale Reference |
|---|---|---|---|
Other Development Objects
| Object Type | Object Name | Purpose/High Level Logic | Design Rationale Reference |
|---|---|---|---|
Appendix
Custom Authorization Group Naming Convention
This table is based on the Syensqo development standards document. It provides the naming conventions for authorization groups to associated with custom reports and tables to comply with security requirements.
ABAP | ZFI | ZMM | ZPS | ZCO | ZSD | ZBC | ZFI | ZCA |
|---|---|---|---|---|---|---|---|---|
| TABLES | ZFIT | ZMMT | ZPST | ZCOT | ZSDT | ZBCT | ZFIT | ZCAT |