- Created by Bablot-ext, Romain, last modified on Aug 11, 2023
You are viewing an old version of this page. View the current version.
Compare with Current View Page History
« Previous Version 10 Next »
In this section we will :
- Describe the source of the One Quote Line Items Price settings
1/ One Quote Line Price Settings
The Object One Quote Line contains fields retreived from the Price Settings. The objective is that the most accurate, the most up to date and the same prices are retreived in CPC and One Quote Line Item (OQLI)
The One Quote Line Price Settings fields are updated ONLY when :
- Quote is Cloned, Renewed and One Quote Line Created, Cloned
- Account Manager clicks on "Send for Approval
| CPC Field Retreived | Source | Business Rule | ||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Freight & Duty Guidance | SLV48_Freight_Guidance__c .Cost Guidance (converted at the OQLI Original Currency & UOM) | We retreive the Cost Guidance (SLV44_Freight_Guidance__c) Record type : "Freight Cost" If (existing combinaison : Shipping Plant Code x Product Code x Ship-To Code x Shipping plant region x ShipTo Region x Invoterms)
Else if (existing combinaison : Shipping Plant Region x Ship-To Region x Incoterms )
Else ==> 0 | ||||||||||||||||||||||||||||||||
| Margin Guidance | Volume Bracket.Market Margin Policy Value (converted at the OQLI Currency & UOM) | Based on the RMP - Volume Bracket | ||||||||||||||||||||||||||||||||
| Margin Guidance % | Volume Bracket.Market Margin Policy % | Based on the RMP - Volume Bracket | ||||||||||||||||||||||||||||||||
| Margin Floor (SLV44_Price_Floor_EXW) | Manufacturing plant. Price floor EXW(converted at the OQLI Original Currency & UOM) | Based on the Manufacturing Plant | ||||||||||||||||||||||||||||||||
| Variable Manufacturing Costs | Manufacturing plant. Variable Manufacturing Costs (converted at the OQLI Original Currency & UOM) | Based on the Manufacturing Plant | ||||||||||||||||||||||||||||||||
| Asset Margin Floor | Manufacturing plant.Asset Margin Floor (converted at the OQLI Original Currency & UOM) | Based on the Manufacturing Plant | ||||||||||||||||||||||||||||||||
Transfer Cost guidance Unable to locate Jira server for this macro. It may be due to Application Link configuration. | PP_Transfer_Cost__c . Cost Guidance (converted at the OQLI Original Currency & UOM) | We retreive the Cost Guidance Record type : "Transfer Cost" We retreive the Cost Guidance (SLV44_Freight_Guidance__c) Record type : "Transfer Cost" If (existing combinaison : Manufacturing Plant x Shipping Plant x Material)
Else ==> 0 | ||||||||||||||||||||||||||||||||
| CPC Field Calculated | Calucation done in the code | |||||||||||||||||||||||||||||||||
| Price Guidance |
| |||||||||||||||||||||||||||||||||
| Price floor | CPC.Price Floor =
} Else { | |||||||||||||||||||||||||||||||||
- No labels