Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »


In the application iMEP, the caracteristic Index 1 is a key element to understand to set-up an accurate report to follow production quantities and costs.

Definition

For historical reasons, the data structure is not the same in our two source systems (WP1 & PF1). It explains why some indexes only exist in one of the two ERPs.

CodeDescriptionDefinitionWP1PF1
1Produced materialCosts and quantities at finished product level(tick)(tick)
2

Co-product

Co-product(tick)(tick)
3BOM conponentCosts and quantities issued from component consumption(tick)(tick)
4SubcontractingSubcontracting costs(tick)(tick)
5Activity typeCosts and quantities issued from activity consumption at standard costs(tick)(tick)
6Settlement

Process Orders variances

(tick)(error)
7Cost Collector VariaAllocation of activity variances done by Material Ledger

(error)

(tick)
9SKF/direct PostingDetailed origin of costs consumed on production cost centers by Activities(error)(tick)


Example PF1

The aim is to have the detailed quantities and costs of production of the material 157142 in iMEP

There are 4 columns in the report: 

  1. Finished product code: 
  2. Index 1
  3. Actual quantities
  4. Mat. Ledger Costs = Actual costs

The detail of costs & quantities is: 


Index 1
a1 - Produced material70 000 KG of the finished product 157142 SD are produced and the total production cost is 6 840 € 
b3 - BOM conponent206 000 KG of Raw Materials are used for the production of the finished product with a total cost of 2 650 €
c5 - Activity typeThe cost of activities used for the production is 4 440 €. It is based on the estimated costs of activities
d7 - Cost Collector VariaIt is the difference between the standard cost of activities and actual costs (=4 190 € - 4 440 €)
e9 - SKF/direct PostingIt is the detail of activity costs
  • The cost of production (a) = cost of raw materials (b) + cost of activities (standard (c) & variance(d)) = 6 840 € = 2 650 € + 4 440 € - 250 € 
  • Index 1 = 9 (e) is the detail of activity costs. It is equal to Index 1 = 5 (c) and Index 1 = 7 (d) => 4 440 € - 250 € = 4 190 €

Control data accuracy

The workbook BW_WBK_CO_0024 is used to perform some consistency checks.


Example WP1

The aim is to have the detailed quantities and costs of production of the material 157142 in iMEP

There are 4 columns in the report: 

  1. Finished product code: 
  2. Index 1
  3. Actual quantities
  4. Actual Costs

The detail of costs & quantities is: 


Index 1
a1 - Produced material35 000 TO of the finished product 81016 SOD are produced and the total production cost is 2 700 k€ 
b3 - BOM conponent10 500 TO of Raw Materials are used for the production of the finished product with a total cost of 2 300 k€
c5 - Activity typeThe cost of activities used for the production is 350 k€.
d6 - SettlementIt is the production variance. The amount is settled to the P&L to the value field D05/E05/F05
  • The cost of production (a) = cost of raw materials (b) + cost of activities (c) + variance (d) = 2 700 k€ = 2 300 k€ + 350 € + 50 k€


The best way to get IT support is to use the new Service One Platform.