Â
NASA - Principles
1. Every cost center must be mapped to ZCBS level 4
Illustration
When you request the creation of a new cost center, you must provide the ZCBS level 4 group:
Exception
No exception
2. One cost center must be linked to one BFC Heading
General rule
All Cost Centers are allocated to only 1 BFC heading (through allocation cycles).
Illustration
When you request the creation of a new cost center, you must provide the ZCBS level 4 group:
Exceptions
- Depreciation
- Mixed Cost Centers (allow to have variable and Fixed costs in same Cost Center)
- Production CC (that most of time belong also to Mixed Cost Centers)
- R&D cost centers: depending on the accounts can report in R36100 - R&I GBU and R36200 - Research & development - Grants
3. ZCBS L2 respects the reporting guide BFC and cycles accordingly
General rule
- ZCBS level 2 under scope are allocated to only 1 BFC heading.
- The COPA Cycles must ensure the consistency between the cost center and the target BFC heading (corresponding to the NASA hierarchy Level 2/ZCBS level 2 of the CC). Mapping L2-BFC
Illustration
4. ZCBS level 3 and 4 are flexible for GBUs Adm & Com, R&I
General rule
- Cost center Groups ZCBS for levels 3 and 4 can be created to cover the needs of the GBU/ should be adjusted to GBU organization. Only Under the Levels 2: R&D and SGA.
Illustration
Exceptions
- No exception
5. Employees working for different BSAs can’t be on the same cost center
General rule
Employees working for different BSAs can’t be on the same cost center
Illustration
...
Exceptions
- None, even if it means to have cost center with only one employee
6. Each ZCBS node at level 4 is attached to one single BSA
General rule
- Each CC is linked to one single ZCBS node (at level 4)
- Each ZCBS node level 4 is attached to one single BSA (see definitions)
Illustration
...
Exceptions
- If no BSA is identified for the ZCBS node level 4, it should be assigned to the technical BSA BSA_NA (BSA not assigned)
7. Determination of NASA nodes (Description)
General rule
Determination rules from ZCBS Hierarchy to NASA depend on:
- GBU ≠ Function
- If Function: Corporate Function ≠ SBS
- If GBU: Fixed Cost Plant, Fixed cost Others ≠ SGA/R&I/Interco
Illustration
...
Exceptions
- ...
8. Budget Owner Determination: L5 of NASA Hierarchy
General rule
- Each NASA node at Level 5 is linked to a Budget Owner, who is accountable for the budget.
- There is no maintenance in the systems of the correspondence: position/BO name vs L5 Node.
- Controlling of each function/GBU should know who is the budget owner of each L5 Node.
Illustration
...
Exceptions
- The concepts of budget owner (associated to level 5) and SRM7 position (approver of POs) are different.
- We might have a level 5 with 1 Budget owner (always) and many SRM7 approvers (associated to the CCs).