The system established that, in the MRP view for material x in plant p, the quantity structure should be selected through the production versions.
When the material was costed, entries were made for the BOM and/or routing. However, the system could not determine either a suitable or a valid production version
Example
The system established that, in the MRP view for material 97861 in plant 7991, the quantity structure should be selected through the production versions
When the material was costed, entries were made for the BOM and/or routing. However, the system could not determine either a suitable or a valid production version
Procedure
What happens if the issue is not solved and the costing released ?
- You can check it the material code has a production version in the material master data of the code 97861 in plant 7991 with the transaction MM03 in the view MRP4
- The field is blank; it confirms that the cost estimate cannot be calculated
- You can check the impact on the costing when there is no production version available
=> In this example the costing is not complete: there is only one a raw material but no activities. The costing is not correct.