Scope
- Worldwide
- All consolidated legal entities in PF1, PI1, WP1
Users
- Corporate Controlling Controllers : at aggregated level, to report to COMEX -> query synthesis
- Function Controllers : at detailed level, to pilot activity of their Function / scope -> query by function
- Accountants : for reconciliation ERP / BW / FC -> query by company
Authorizations
- Function x Company Code
Structures
The structure is based on:
Function costs are split in 4 parts:
- Corporate (not re-invoiced)
- Function services (re-invoiced and under guarantee)
- R&D and engineering projects
- Interco flows - It allows the identification of inter-company billing at company level
Costs included in the report:
- Actual costs only: Statistical costs are not taken into account
- IFRS rules only: Costs posted using local gaap accounts are excluded (Brazilian entities)
- Costs posted on CBS (Corporate Business Services) cost centers (directly or through orders or WBS). It corresponds to the cost centers included in the following groups of the cost centers hierarchy ZCBS:
- ZCBS-CORPO = Corporate
- ZCBS-FUNCT = Function services
- ZCBS-PROJ =Projects
- ZCBS-ICO = Interco
- Costs are organized with the cost elements group ZRCS-FC
- Inter-company re-invoiced function service costs should be posted on cost centers of the group ZCBS-ICO
Function cost tracking reports
Design
5 queries available, corresponding to 2 approaches
- Point of entry : function(s) or company(ies)
- End of month (final settlement on function CC) or During the month (link to function CC before settlement)
| End of Month | During the Month | ||
|---|---|---|---|
| to be used for reporting after the closing when all costs posted in orders are settled on CBS cost centers | to be used during the month when orders are not yet settled | ||
| By Function | function controlling | BW_QRY_MPR_FC001_001 BW_QRY_MPR_FC001_005 | BW_QRY_MPR_FC001_003 |
| corporate controlling | |||
| By company | local controlling | BW_QRY_MPR_FC001_002 | BW_QRY_MPR_FC001_004 |
BW_QRY_MPR_FC001_001 CBS Functions - end of month => for reporting to corporate controlling
BW_QRY_MPR_FC001_002 CBS Functions by companies => for reconciliation FC vs BW
Possibility to analyze a “one-level-up” cost cascade
Data
- CO documents: actual costs in local currency + report in other currency with BFC exchange rate
- Entries on Cost Centers, Orders and WBS elements
- Postings to COPA & Local Gaap cost elements are excluded
“Synthesis” & “Function – end of month” reports
Additional axis : Structure with 6 categories
Category | Definition | Example | |
|---|---|---|---|
(1) | Gross | All costs excluding depreciation before any deduction (sales, capitalization, etc…) | all labour costs + travel + services + … |
(2) | Depreciation | Postings with depreciation cost elements | depreciation costs |
(3) | Sales | postings with sales cost elements (excluding capitalization) + postings with all other cost elements linked to Invoicing WBS element (partners with object class “Profitability Analysis”) | activity (man Hr) posted on invoicing WBS |
(4) | Costs going to be capitalized | postings linked to Investment WBS or Orders (partners with object class “Investment”) | activity (man Hr) posted on investment WBS |
(5) | Cost transferred | Credits from overheads CC WBS IO (partners with class object “Overheads” - excluding sales cost elements) | activity (man Hr) posted on overhead WBS |
Net Function | Balance of the cost center | (1) + (2) - (3) - (4) - (5) | |
| |||
BW Reports
Synthesis
- Costs posted on function cost centers only
- Categorization of costs following the structure described in the slide ““Synthesis” & “Function – end of month” report”.
- Highest level of detail: cost center x cost element
- The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)
- List of characteristics available
Functions – End of month
- Costs posted on function cost centers only
- Categorization of costs following the structure described in the slide ““Synthesis” & “Function – end of month” report”.
- Highest level of detail: partner CO object
- The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)
- List of characteristics available
Functions – During the month
- Costs posted on function cost centers and CO objects with function CC as responsible CC
- No categorization of costs
- Highest level of detail: partner CO object
- The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)
- List of characteristics available
Functions by Company – End of month
- Costs posted on function cost centers only
- No categorization of costs
- Highest level of detail: partner CO object
- The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)
- List of characteristics available
Functions by companies – During the month
- Costs posted on function cost centers and CO objects with function CC as responsible CC
- No categorization of costs
- Highest level of detail: partner CO object
- The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)
- List of characteristics available
- Same layout as “Functions – During the month”
Characteristics available in CBS reports
Characteristic | Synthesis | Functions – End of month | Functions by Companies – End of Month | Reports – During month | |
|---|---|---|---|---|---|
0 – Hierarchy | Level 0 of ZCBS hierarchy | X | X | X | X |
1 – Organization | Level 1 of ZCBS hierarchy | X | X | X | X |
2 – Function | Level 2 of ZCBS hierarchy | X | X | X | X |
3 – Sub-Funct Group | Level 3 of ZCBS hierarchy | X | X | X | X |
4 – Sub-Function | Level 4 of ZCBS hierarchy | X | X | X | X |
Controlling area | Controlling area of the function CC | X | X | X | X |
Company | Company of the function CC | X | X | X | X |
Country | Country of the company | X | X | X | X |
Geographical zone | Zone to which the country is attached | X | X | X | X |
Cost center | Function cost center | X | X | X | X |
Responsible Cost Center | Function CC responsible of an order or a WBS element | X | |||
WBS element | WBS element with a function CC as a responsible CC | X | |||
Order | Order with a function CC as a responsible CC | X | |||
Fixed Cost Group 1 | Level 2 of ZRCS-FC hierarchy | X | X | X | X |
Fixed Cost Group 2 | Level 3 of ZRCS-FC hierarchy | X | X | X | X |
Fixed Cost Group 3 | Level 4 of ZRCS-FC hierarchy | X | X | X | X |
Cost Element | Cost element used to post function costs | X | X | X | X |
Partner Cost Center | Cost center with which the function CC exchanges costs (credit or debit) | X | X | X | |
Partner Activity Type | Type of activity used to transfer costs to the function CC from a partner CC | X | X | X | |
Partner WBS element | WBS with which the function CC exchanges costs (credit or debit/Posting or settlement ) | X | X | X | |
Partner Order | order with which the function CC exchanges costs (credit or debit/Posting or settlement ) | X | X | X | |
Partner Vendor | Vendor in purchase flows | X | X | ||
Sender / Receiver | indicator that identifies the direction of the posting | X | X | X | |
Cost Structure | slide ““Synthesis” & “Function – end of month” reports | X | X |