Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Warning

The system established that, in the MRP view for material x in plant p, the quantity structure should be selected through the production versions.

When the material was costed, entries were made for the BOM and/or routing. However, the system could not determine either a suitable or a valid production version

Example 

The system established that, in the MRP view for material 97861 in plant 7991, the quantity structure should be selected through the production versions

When the material was costed, entries were made for the BOM and/or routing. However, the system could not determine either a suitable or a valid production version

 

What to do ?

 

Procedure

Info
Enter a status Z1 in the view costing of the master data of the material code with transaction MM02 until the production version is created or updated

Expand
titleEnter the status Z1 in view : costing 1

Include Page
MM02 - Enter a status

Z0

Z1 in the view Costing
MM02 - Enter a status

Z0

Z1 in the view Costing

 

 

What happens if the issue is not solved and the costing released ?

  • You can check it the material code has a production version in the material master data of the code 97861 in plant 7991 with the transaction MM03 in the view MRP4

  • The field is blank; it confirms that the cost estimate cannot be calculated 




  • You can check the impact on the costing when there is no production version available 

 

=> In this example the costing is not complete: there is only one a raw material but no activities. The costing is not correct. 

 

Viewtracker
hidetrue