1.0 Overview



Button | Vectors (Formerly: SP Macro Button)
urlconfluenceGBU fixed costs
iconicon-sp-left-big
fontSize16
labelGBU Fixed Costs Menu
boxShadowColortrue

Panel
borderColor#ededed
titleColor#ffffff
titleBGColor#009EE0
titleBusiness Context and Application Overview

The GBU Fixed Costs applciation is part of Finance domain and we use mainly the SAP data from CO (Controlling) module to get data for the fixed costs and GBU level.

The application GBU Fixed Costs is used to follow Solvay’s fixed costs mainly: 

  • STOT-R330 – Administrative & Commercial expenses
  • R25460 – Non proportional costs of sales
  • R27900 – Mis production.
  • R25510 – Logistics costs.
Provide an overview of the app (e.g Domain, key processes, purpose of the app, etc)
Panel
borderColor#ededed
titleColor#ffffff
titleBGColor#009EE0
titleApplication User Profile

For this Application the access is provided based on the BW menu "FC - GBU Fixed Costs" and it's done via Service one.

Fill the form
https://solvay-dwp.onbmc.com/dwp/app/#/itemprofile/622 

In SAP system select the "WBP - BW Business Warehouse" 

In WBP - BW Business Warehouse : Select the Business Role select the "FC - GBU Fixed Costs"

Describe the key User profiles that exist for the application. 

General role/Viewer role:

Approver role:

Info
iconfalse

Target Users: As examples: Controllers / Accountants

GBU and Site Controllers and Plant Management

VERSION

DATE

MODIFIED BY 

DESCRIPTION

0.01

dd29.mm09.yyyy2023

Inês Vilares<Insert name>

Initial draft









Panel
borderColor#ededed
titleColor#ffffff
titleBGColor#009EE0
titleApplication Type

 

Data Product Type 
  •  Dashboard
  •  Report
  •  Advanced analytics
  •  AI 
  •  Others <specify which one>
Technologies
  •  BW
  •  Tableau
  •  Qliksense
  •  Talend
  •  Dataiku
  •  Others <specify which one>

Data Sources 

Note: list of all applications and various environment

  •  SAP PF1 (Production environment)
  •  SAP WP1
  •  SAP PI1
  •  BW (versions)
  •  iCare CRM 
  •  CORE CRM
  •  Budget flat files
  •  Others <specify the name of the source> 

2.0 Business Process


To understand the business process it's important to know the basic concept for the SAP CO module and how it's applicable in Solvay organization. 

The SAP CO module in the SAP ERP (Enterprise Resource Planning) system focus on financial controlling and management accounting functions within an organization. SAP CO is designed to provide tools and capabilities to effectively manage and control costs, perform internal and external accounting, and support decision-making processes related to financial aspects of the business. SAP CO is tightly integrated with other SAP modules, such as SAP FI (Financial Accounting) and SAP MM (Materials Management), providing a cohesive and comprehensive solution for managing financial data, controlling costs, and supporting financial decision-making throughout the organization.


CO Structure in Solvay:

PF1 Structure


CodeDescription
Operating concernFO01 Slv ERP Operating concer
Controlling areaCHEFERP SOLVAY

Image Added

WP1 Structure


CodeDescription
Operating concernZ001 Solvay Engin.Plasti.Polan
Z006 Rhodia Europe
Z013Rhodia Europe
Z025Rhodia Latin America
Z026Rhodia Asia Pacific
Z028Solvay North America
Controlling area= Operating concern

Image Added



Scope for GBU Fixed Costs


  • PF1 & WP1 cost centers are included as long as there are included in the hierarchy ZCBS.
  •     Image Added








  • For the cost elements in both systems they are included in the new hierarchy ZSOLV (old ZRCS-FC hierarchy). See more information about the change of the group in the Process Detail section for the hierarchy.
Info
iconfalse

In the systems we can see the hierarchy using the SAP transaction KSH3 - Display cost center hierarchy to see the hierarchy respective to the cost center organization.

In the systems we can see the hierarchy using the SAP transaction KAH3 - Display cost element group to see the hierarchy respective to the cost element organization.

In the Process detail section we show in more detail the hierarchy and restrictions for this scope.



Determination of the GBU


The fixed costs report is available by GBU. 

In WP1, the GBU comes from the  Profit Center  of the cost center while in PF1 it comes from the  Business Area  of the cost center 

Image Added


GBU determination in WP1


The determination of the GBU in WP1 is done with the  Profit Center Standard hierarchy 


Example

1. The profit center of the cost center 6062-6227 is 6062-I1184


Image Added

2. The profit center belongs to the GBU Soda Ash

Image Added

3. In the fixed costs report, the cost center 6062-6227 is allocated to the GBU Soda Ash

Image Added


GBU determination in PF1

The determination of the GBU for PF1 cost centers is done with the  Business Area


Determination of the plant

The report is available by production site or headquarter. It comes from the  Profit Center department


Origin & Destination 

Report at origin - indirect production cost center

Image Added

Report at destination -  indirect production cost center

Image Added



For the GBU fixed costs we use the SAP information from the controlling part to analyze the fixed costs at GBU level. For this it's important to understand the structure behind and how the business see the costs and be able to analyze the information to perform their activities during and end of month.

Model behind for PF1 and WP1:

Image Added

Curently we have the WBS, cost centers and orders objects with values coming from the purchase orders and accounting entries. Each object is linked to a cost center which we call it "Responsible Cost Center" and this cost center is linked to a GBU. 

We have the primary postings and during the closing process we have the settlements cycles (which will allocate the costs to a final cost center) and the final cost centers has the correspondent cost element for COPA line items to be present in the P&L report for PF1 and WP1 using the respective value field. 


Reporting fixed costs challenges : reconciliation SAP/BFC:

Image Added

In the controlling side we have primary posting in the CO objects for the fixed costs and during the closing we have the settlement cycles to transfer/allocate the costs to a final CO object and to be in the respective lines in P&L.Capture the business process that the application supports . This can be describe through a process diagram or a business capability model


3.0 Application Feature Overview

Information about the existent Workbooks and the respective BW queries.
For this application find below all the workbooks available:
ReportsDefinitionPromptsBW Workbook QueryQuery Technical Name
FC - Cost center master data (Core Query)This report  is used to display the master data of all cost centers in WP1 & PF1 including the ZCBS hierarchy, the GBU and the plant code.

Mandatory:

N.A

Optional:

  • CCtr Category;
  • Change date;
  • CO area;
  • Company Code;
  • Cost center;
  • Created by;
  • Creation date;
  • Author. scope of Comp. Code;
  • Source System.
BW_WBK_FC_0003BW_QRY_C_COSTCTR_0001
FC - End month - P&L reconciliation COPA (Core Query)

In this report the users can check the costs in the cost center and the respective cost element and the same amount allocated in P&L destination (COPA).

The ZSOLV Group 4 as the default values - different from:

  • ZSO-IND31
  • ZSO-IND51
  • ZSO-29999A

The field Function has default options - different from:

  • ECP;
  • EACAR;
  • EPSRO;
  • ECPVSE;
  • EDICS;
  • ESERV.

The field Variable Cost has the default option to be excluded: X

Mandatory:

  • Fiscal Year/Period;
  • BFC GBU - Resp Cost Center;
  • Exchange Rate type.

Optional:

  • Auth Scope on Resp Cost Center;
  • BFC Geo/Zone;
  • Company Code;
  • Fixed Group 1,
  • Function;
  • Responsible Cost center;
  • User responsible;
  • Source System;
  • Target Curr. for conversion;
  • Version;
  • Variable Cost.
BW_WBK_FC_0001BW_QRY_MPR_FC003_0003
FC - End month - P&L select - Monthly P&L Impact (Core Query)

This report shows the amounts allocated to the fixed costs in P&L but it's recommended to be used when the users wants to analyze the amounts allocated to different GBU's or Group of Activities. You can see more details in the section "Process Detail → Workbook Details" .


The field BFC Account has default options selected:

  • R33210;
  • R33310;
  • R33320.

The ZSOLV Group 4 as the default values - different from:

  • ZSO-IND31
  • ZSO-IND51
  • ZSO-29999A

The field Function has default options - different from:

  • ECP;
  • EACAR;
  • EPSRO;
  • ECPVSE;
  • EDICS;
  • ESERV.

The field Variable Cost has the default option to be excluded: X

Mandatory:

  • Calendar Year;
  • Conso View;
  • Exchange Rate type (default "C").

Optional:

  • Auth Scope on Resp Cost Center;
  • Currency Conversion Year;
  • P&L GBU;
  • P&L BFC Group of Activities 1;
  • P&L BFC Group of Activities 2;
  • P&L BFC Group of Activities 3;
  • P&L BFC Group of Activities 4;
  • P&L BFC Group of Activities 5;
  • BFC Account;
  • BFC Geo/Zone;
  • Company Code;
  • Responsible Plant;
  • Fixed Group 1;
  • Function;
  • Source System;
  • Target Currency;
  • Version Budget;
  • Variable Cost.
BW_WBK_FC_0007BW_QRY_MPR_FC003_0009
FC - End month - P&L select - P&L Impact (Core Query) 

This report shows the amounts allocated to the responsible cost center for fixed costs in P&L regarding the actual destination and the GBU's involved. You can see more details and examples in the section "Process Detail → Workbook Details" .


The field BFC Account has default options selected:

  • R33210;
  • R33310;
  • R33320.

The ZSOLV Group 4 as the default values - different from:

  • ZSO-IND31
  • ZSO-IND51
  • ZSO-29999A

The field Function has default options - different from:

  • ECP;
  • EACAR;
  • EPSRO;
  • ECPVSE;
  • EDICS;
  • ESERV.

The field Variable Cost has the default option to be excluded: X

Mandatory:

  • Conso View;
  • Exchange Rate type (default "C").

Optional:

  • Auth Scope on Resp Cost Center;
  • Fiscal Year;
  • P&L GBU;
  • P&L BFC Group of Activities 1;
  • P&L BFC Group of Activities 2;
  • P&L BFC Group of Activities 3;
  • P&L BFC Group of Activities 4;
  • P&L BFC Group of Activities 5;
  • BFC Account;
  • BFC Geo/Zone;
  • Company Code;
  • Responsible Plant;
  • Fixed Group 1;
  • Function;
  • User Responsible;
  • Source System;
  • Target Curr. for conversion;
  • Version Budget;
  • Variable Cost.
BW_WBK_FC_0006BW_QRY_MPR_FC003_0008
FC - CO Orders master data (Core Query)

This report shows the master data for CO orders with settlement details.

Mandatory:

  • Authorization Scope
  • GBU

Optional:

  • Source System
  • Company Code
  • Controlling Area
  • Order
  • Order Type
  • Creation Date
BW_FC_WBK_0008BW_QRY_CPCOCC01_0001

4.0 Functional Specification


4.1 General Data/Calculations 

This section will approach the concepts/definitions that will be used in all the reports and required to understand the data from the reports.

Could be specific fields, closing activities, additional information to work and understand the reports


For these reports, it’s important to understand some general concepts which are transversal to all the reports which allows the users to work with the reports in the same way as the SAP system and BFC tool.
GBURefer to the Global Business Unit and it's a concept used in our officil reporting tool. To know how we get the GBU for PF1 and WP1 systems this is detail in the Process Definition section.
Cost Center

A cost center is a specific organizational unit within a company that is responsible for incurring costs. It represents a location, department, or function where expenses are generated. Cost centers are used for tracking and controlling costs, allocating expenses, and monitoring budget compliance.

Responsible Cost Center

A responsible cost center is a subcategory of a cost center that is responsible for specific cost incurrences within the main cost center. It allows for more detailed tracking and allocation of costs within a broader cost center. Responsible cost centers help organizations drill down into expenses for greater accuracy in cost analysis and control.

Responsible Cost center is : 
-    the cost center linked to the Order and WBS of the line item (CO-OM, PS)
-    the cost center of the line item for CO-CCA 

Cost elementIt's a categorization used to track and classify expenses incurred by an organization. It represents a specific type of cost, such as wages, materials, rent, or utilities, and serves as a fundamental building block for cost accounting and reporting. Cost elements are essential for allocating and analyzing costs within the SAP CO module. It's the P&L account used to post the amounts in SAP CO document. 
PlantRefers to a specific physical location or facility within a company's organizational structure. 
Cost Center HierarchyRefers to a structured arrangement or organization of cost centers within a company. It establishes a hierarchical relationship among cost centers, typically based on their functions, responsibilities, or reporting structures. This hierarchy helps in organizing and managing cost centers efficiently for accounting, budgeting, and reporting purposes, allowing for better control and analysis of costs across the organization.

4.2 Process Detail 

4.2.1.  Report/Process Definition 

Domain<insert name>Finance
Application>insert name>BW reports under FC - GBU Fixed Costs folder
Provider<insert name>
Existing Documentation

<insert link>

This section represents the process with detail information for the application. Can include specific or special cases, complex logics , calculations, flows, among others.

4.2.2. KPI's/Calculations/Indicators 

Indicators available: 

  • XXXX
  • XXXX

Indicatores/KPI's

Definition

Calculation/Extraction of data

Can be a field, a program, something that was created or the report

What are we looking for ? Why has this KPI been created/developed? What is the goal of monitoring this data ? 

How is the calculation, or if it's a program what are the steps or how the data is extracted if it's by files

MPR_FC003
Info
iconfalse

In this section we will approach:

Info
iconfalse

The GBU Fixed Costs it's based in an existent model, since many years ago exist a controlling model to be more accurate for the GBU needs. We take the model already developed and it was enhanced to follow the fixed costs specially in the cost center at GBU level.

We have the PF1 and WP1 systems and we are using the main CO objects cost centers, WBS and orders and with this information extracted the data is splitted in two BW tools one side the GBU fixed costs and the other solution is CBS for the functions (This scope is explained in the "Corporate Business Services application"). For both applications we use the same data base and the same cubes but the multiproviders are different also because of the authorization part. The GBU Fixed Cost application are using COPA data's for reconciliation purpose

SAP BW High Level View 
Anchor
SAP BW High Level View
SAP BW High Level View

To see the data from the source systems see below how the information is organized in the BW perspective: 

Image Added


Hierarchy 
Anchor
Hierarchy
Hierarchy

All cost centers for this scope are stored in a unique hierarchy ZCBS.

  • The cost centers for the GBU fixed costs are identified by an unique sub-folder in ZCBS hierarchy : ENTRP (some others filters are done and they are identified in the section below Restrictions). See more details for the structure for cost centers hierarchy ZCBS in the GBU cost center section.
  • The cost elements for the fixed costs are identified by specific folder (ZSOLV) and sub folder. Refer to ZSOLV Cost Element Group ZSOLV


Note

In the Cost Element Hierarchy from 01 Jan 2022 the Cost Element Group ZRCS-FC it was replaced by the Cost Element Group ZSOLV. In the reports we have information for the ZSOLV group and the reports working for the filters and key figures with the new group (ZSOLV). 


Restrictions 
Anchor
Restrictions
Restrictions

To determine GBU Fixed Costs perimeters, there is restrictions on: 

  • Cost center
  • Cost element
  • Miscellaneous filters 


Restriction on cost center 

As already mentioned for GBU Fixed Cost we only analyse ENTRP (1 Organisation attribute = ENTRP of the Responsible Cost center ). By default we must excluded some “2 Function”  attributes values in the reports. The users can delete these default filters.


Cost center hierarchy ZCBS : restrictions

Image Added


Restriction on cost element:

In the cost element BW object the cost element hierarchy was denormalized (levels of the hierarchy are translated as attributes of cost element).

Image Added

By default we must excluded some “ZSOLV Group 4 “  attributes values in the reports. The users can delete these default filters.


Cost element hierarchy ZSOLV Group 4 : restrictions:  The below Groups are excluded from the report by default

Image Added


Image Added


Image Added




Miscellaneous filters:

Order Type : we exluded (investment) :

  • ZPM4
  • ZPM6

Project Type we exluded (investment) :

  • II
  • FD

Value type

  • 10- Real
  • 20-plan

Currency type

  • 10 company code currency 

Special Case: mixed cost center 
Anchor
Special Case: mixed cost center
Special Case: mixed cost center

Because some cost centers are not 100% fixed (or variable), we identify them by an attribute mixed cost center = X


For this  cost center we must check if the cost element is variable or not using XCS-ALL hierarchy (to exclude them)

 We need a characteristic to identificate these cost element (with an X as attribute )


How to identificate “Mixed Cost center “?

All cost center ENTRP with level 4 node finishing by Y in ZCBS Hierarchy



Image Added

How to identificate “variable cost” element?

use XCS-ALL hierarchy

The variable cost elements are all cost element attached to a  node starting with "XCS-V"  ou "XCS-S" (or attached to sub node under XCS-VCAL et XCS- SELL).

Image Added


Plant vs Responsible Plant 
Anchor
Plant vs Responsible Plant
Plant vs Responsible Plant

  • Plant is the physical plant
  • Responsible plant is financially responsible of the cost center
  • Responsible plant is an authorization object
  • In SAP (WP1/PF1)  responsible plant is in the field department of the profit center of the cost center


Image Added

Image Added

The report is available by production site or headquarter. It comes from the  Profit Center department.


Workbook Details  
Anchor
Workbook Details
Workbook Details

See below more details for each workbook available for analysis:

  • FC - Cost center master data (Core Query)
  • FC - End month - P&L reconciliation COPA (Core Query)
  • FC - End month - P&L select - Monthly P&L Impact (Core Query)
  • FC - End month - P&L select - P&L Impact (Core Query)
Info

 This application is built around the following queries: 

Queries built on Cost center accounting:

  • FC-End month - P&L reconciliation COPA (Core Query) is RCS model oriented. This query give you fixed Cost on Cost center and the allocation to COPA (and also the COPA GBU/COPA BFC account ...)
  • FC-End month - P&L reconciliation PF1 (Core Query) is PF1 model oriented (before SPS project). This query give you fixed Cost on Cost center and the allocation to reporting cost center (use Partner Coster center characteristic)
  • FC-During month -details (core query) provide fixed cost on original controlling objects (orders, cost centers , WBS elements) before end month allocations. responsible cost center is the way to regroup costs.There is no P&L information 

1 Query built on P&L model (and you must have P&L authorizations)

  • P&L - Fixed Cost analysis : This query is only for COPA models (RCS and after SPS project) 

FC - Cost center master data (Core Query)

Info
iconfalse

The workbook BW_WBK_FC_0003 FC - Cost center master data is used to display the master data of all cost centers in WP1 & PF1 including the ZCBS hierarchy, the GBU and the plant code.

It is used to control the consistency of the cost centers master data and ensure the FC - Create a fixed costs report  is working well.

When you open the workbook for the 1st time, the following columns are displayed: 

  • Source System
  • 0 Hierarchy
  • 1 Organisation
  • 2 Function
  • 3 Sub-funct Grouping
  • 4 Sub-function
  • CO area
  • BFC GBU
  • Cost Center
  • Company code
  • CCtr Category
  • Business area
  • Profit Center
  • Obsolete object

Image Added

Tip

By default the report is filtered on the ZCBS group = ENTRP but the filter can be removed to display all cost centers.

Tip

It is recommended to filter on active cost centers with "Obsolete object" = 0

Image Added

For each cost center there is: 

  1. the cost center master data coming from KS03 - Display cost center
  2. the 5 levels of the ZCBS hierarchy 
  3. Other information: 

Image Added


FC - End month - P&L reconciliation COPA (Core Query)

Overview of the fixed costs workbook 

When you open the workbook for the 1st time, you have the following columns displayed: 

  1. GBU
  2. Function determined with the ZCBS hierarchy
  3. Cost centers
  4. Plant
  5. Cost elements Group ZRCS-FC
  6. Actual - Destination (Conv) = primary & secondary cost elements. (you can click  Image Added  to see the detail). => conversion is done with the currency entered in the prompt
  7. P&L Destination (Conv). Costs in COPA after cost centers settlement in the corresponding value field. (based on ZCBS hierarchy correspondance)
  8. Actual Destination (Local) = same as (6) in local currency
  9. P&L Destination (Local) = same as (7) in local currency

Image Added


FC - End month - P&L select - P&L Impact (Core Query) and FC - End month - P&L select - Monthly P&L Impact (Core Query)

The workbook that is recommended to use when working on fixed costs analysis is  FC-End month - P&L reconciliation COPA (Core Query). However when working with cost centers shared with other GBUs, the workbook "FC-End month - P&L select - P&L Impact" can be more relevant. 

In this page, you will see based on an example the difference between the standard workbook FC-End month - P&L reconciliation COPA (Core Query) and the workbook "FC-End month - P&L select - P&L Impact" and in which cases it is recommended to use the workbook "FC-End month - P&L select - P&L Impact". 

Then there is the procedure to access the workbook "FC-End month - P&L select - P&L Impact" with a description of the prompt and main measures available in the workbook. 

What is the difference between the standard workbook "Reconciliation COPA" and the workbook "P&L Impact" 

Let's take an example to explain the difference between both workbooks: 

Example

The cost center  7418-6007 is used to record the administrative costs of the legal entity 7418.

In January 100 kUSD were posted on the cost center 7418-6007 with the detail below:


Labour60 kUSD
T&E10 kUSD
Other30 kUSD


Standard case: One cost center = One GBU



  The owner of cost center 7418-6007  is the GBU  CS  - Novecare as its profit center 7418-I0449 belongs to the GBU CS - Novecare (see:  Profit center )

Image Added

In the standard BW fixed costs report (FC-End month - P&L reconciliation COPA (Core Query)) , all costs posted on the cost center 7418-6007 are reported in the GBU Novecare. It corresponds to what is expected if the cost center is fully allocated to the GBU Novecare. 


Info
iconfalse

When cost centers are fully allocated to a single GBU which is the most common case, it is recommended to use the workbook FC-End month - P&L reconciliation COPA (Core Query).

Image Added

Special case: One cost center = More than one GBU


However in some cases a cost center can be shared with other GBUs. For instance the cost center 7418-6007 can be shared with other GBUs and allocated to the P&L to several GBUs as detailed in the diagram :  

Image Added

The GBU CS - Novecare doesn't want to report 100 % of costs posted in the cost center 7418-6007 but only 21 % of the costs allocated to the GBU with the same level of details (Labour / Purchases / T&E).  In this case, the workbook  FC-End month - P&L select - P&L Impact can be used. 


Info

When cost centers are shared with other GBUs, it is possible to use the workbook BW_WBK_FC_0006 FC-End month - P&L select - P&L Impact (Core Query) or  BW_WBK_FC_0007 FC-End month - P&L select - Monthly P&L Impact (Core Query) to report the part of the cost center allocated to each GBU.

Image Added

Access the workbook: FC-End month - P&L select - P&L Impact


Select the workbook you want to use:

  • BW_WBK_FC_0006 FC-End month - P&L select - P&L Impact (Core Query)
  • or BW_WBK_FC_0007 FC-End month - P&L select -  Monthly  P&L Impact (Core Query)


Info

What is the difference between the 2 workbooks ?

The difference is the exchange rate used, the rest is the same.

When there is "Monthly" in the description of the workbook it means the exchange rate conversion is done as it is done in BFC. (see:  P&L - Exchange rates)

Image Added

  1. Enter the Fiscal Year/Period:  in the example 001.2019
  2. Enter the BFC GBU code:  in the example CS for Novecare
  3. It is possible to enter 5 group of activities (detailed in the  section Allocation by group of activities  )
  4. By default there is the list of BFC accounts used for SG&A 
Info

Can we remove the filter on BFC accounts without risk ?

The allocation of costs by GBU can only work when a cost center is directly allocated to the P&L. It can not work when the cost center is allocated to another cost center (ex:  indirect production cost centers that are always allocated first to a direct production cost center).

The aim of the filter by default is to exclude cost centers not directly allocated to the P&L. It can be removed but with a risk of seeing dummy results.

Image Added

The report is displayed with: 

  1. BFC Global Business Unit: GBU coming from the master data of the cost center
  2. Actual - Destination: Total costs posted in the cost center
  3. P&L Paid by CS: The part of the cost center allocated to the GBU selected in the prompt

Image Added



Allocation by group of activities


In some cases the allocation of cost center is done at the  group of activities  level. In this case it is possible to select the group of activities you want to detail in the prompt. 

For instance 6% of the cost center 7418-6007 is allocated to the group of activities TSDPH and 11% to the group of activities TSADT. 

  1. Enter the P&L GBU: TS for Technology Solutions
  2. Enter the group of activities 1: TSDPH
  3. Enter the group of activities 2: TSADT

The report is displayed with: 

  1. P&L Paid by TS: The part of the cost center allocated to the GBU selected in the prompt (=TS)
  2. P&L Paid by BU 1: The part of the cost center allocated the group of activities 1 (=TSDPH)
  3. P&L Paid by BU 2: The part of the cost center allocated the group of activities 2 (=TSADT)

Image Added

Image Added

Other Measures


In the workbook, a long list of Measures are available. However most of them are useless for the reporting but they can be used to understand the detail of the calculation done by BW. 

Image Added

For instance, you can display the measure "P&L allocation - Total" to control the calculation done by BW. 

In the example: 

  • The measure "P&L allocation - Total" (2) is the total of costs posted on the cost center reported on each raw. 
  • The measure "P&L allocation - Total GBU TS" (3) is the part of the cost center that was allocated to the P&L. It comes from the P&L in COPA. 
  • The part allocated the the GBU (3) divided by the total of the cost center (2) gives a ratio (5) that is used to calculate the measure "P&L Paid by TS (4)

Obviously it is not necessary to display the measure (3) & (4) in the final reporting but can be used to understand how the allocation to a GBU is done.  

Image Added

FC - CO Orders master data (Core Query)

Info

The query  BW_QRY_CPCOCC01_0001 FC - CO Orders master data (Core Query) is used to display the master data of all CO orders in WP1 & PF1.

The query combines the orders master data with the Settlement details, to maintain the clean-up of the Finance Master data (CO Orders).

In order to maintain the regular clean-up of the CO Orders by Authorization Scope, we have created this query to ease the quarterly clean-up procedure.


Restrictions for the query output (Applied in the backend):

CO AREA:

PF1 = CHEF

WP1 = Z006 , Z013 , Z025, Z026 and Z028

ORDER TYPE:

PF1 = Y* (Y000 to YZZZ)

WP1 = ZORD , Y991 , Y998  and Y999

STATUS:

Orders with Status "CLSD" (Closed) , "LKD"(Locked)  or "DLT" (Marked for Deletion) will be excluded in the report output.


For more detailed information, you can check the functional specification documentation

5.0 Non-functional Descriptions 


5.1 Usability

as per standard.

5.2 Regulatory Compliance

as per standard.

5.3 Security

as per standard.

5.4 Performance

as per standard.

5.5 Reliability

as per standard.

5.6 Scalability

as per standard.

5.7 Compatibility

as per standard.

5.8 Availability

as per standard.

5.9 Refresh of the Data

The loads for the GBU Fixed Costs application is the following:

Closing Time:

Image Added

Outside of Closing: it's one time on a daily basis.

5.0 Non-functional Descriptions 

Please populate the relevant section and delete those that are not applicable.

5.1 Usability

Usability is about the ease with which a User can learn to start using the solution and the ease with which they can use the system.  In addition to ease of learning and ease of use, usability also includes areas such as ease of recall, error avoidance and handling, accessibility among others e.g., 99% of metadata entry Users who have use the Maintenance Dashboard should be able to change filters, extract etc., when required.  Maintenance data will be centrally stored in the Google Cloud platform, which will be available to other applications e.g., and Dashboards if needed.

5.2 Regulatory Compliance

Software systems must comply with legal and regulatory e.g., GDPR requirements, this can change depending on country, organisation industry and / or region.  The software systems must be secure from unauthorized access.  The Maintenance Dashboard will comply with Solvay’s regulations and compliance e.g., access only granted to authorized Users.

5.3 Security

Security refers to essential aspects that assure a solution and its components will be protected against unauthorized access or malware attacks.  Important considerations related to security aspects of a system are User authentication, User authorization or User access privileges, data theft, malware attacks, data encryption, and maintaining audit trails, e.g., only Users with administrator access shall be able to create new accounts and assign data access privileges to the new accounts e.g.,

  • All data will be encrypted in the dashboard
  • Only authorised Users / Administrative Users will be able to access data.
  • Maintenance data will be split between either SCO or ECO, and Users will only have authority to one Entity data.

5.4 Performance

Performance defines how fast a software system or a particular section of it responds to certain User actions under a certain workload.  In most cases, this metric explains how long a User must wait before the target operation happens e.g., the page renders, a transaction is processed, etc., given the overall number of Users now.  Performance requirements may describe background processes invisible to Users, e.g., backup and speed of data transfers. 

5.5 Reliability

Reliability is the ability of a solution or its component to perform its required functions without failure under predefined conditions for a specified time / period.  Reliability can possibly be specified in terms of average time system runs before failure occurs, percentage of operations completed successfully within a time / period, maximum acceptable failure probability, or number of failures within a period.  Reliability aspects are in reference to (but not limited to) evaluation of the system to be considered as reliable, classification of reliability defining failures vs. regular failures, and the impact of failure on business operations.  The Maintenance Dashboard will display data from the previous refresh of data.   

5.6 Scalability

Scalability refers to the degree to which a solution can evolve to handle increased amounts of work.  The increased amount of work could be in terms of the user base, transactions, data, network traffic, or other factors e.g., the system should be able to handle an additional load of a maximum of 5,000 Users every month for the next 6 months without any noticeable performance impacts.  

5.7 Compatibility

Interoperability is the degree to which the solution is compatible with other components.  It is a measure of how effectively the system interoperates with other software systems and how easily it integrates with external hardware devices.

Interoperability aspects to be discussed during elicitation are in reference to (but not limited to) software systems to be interfaced with along with data / messages to be exchanged and any standard data formats, hardware components to be integrated with, and any standard communication protocols to be followed e.g., Order Management system will push the order file into a secured file transfer protocol server from where it will be loaded into the system through a daily job.  To guarantee between Google Cloud platform and SAP BW Queries e.g., BW_QRY_MVPMOR01_0002, Solvay has introduced a new tool called Xtract (Xtract).

5.8 Availability

Availability is the degree to which the solution is operable and accessible when required. It is a measure of time during which the system is fully operational e.g., available for use and sometimes included as a Service Level Agreement (SLA) considering its criticality to the business, e.g., the system shall be at least 99% available on weekdays between 09:00 to 18:30 Central European Time (CET).

5.9 Refresh of the Data

Frequency, data, and time of the data refresh in the data product.