In the report Budget&Costs is possible to add 10 metrics from the column "AO" to "AX"
Open the Report Budget & Costs
Step 2:
Add a metric for example "Project in trouble" in the Table Wizard leaving it in the last position of the order
Step 3:
Activate the headings in Excel
Step 4:
Select the column where you want to insert the metric to the left and using the right mouse click on Insert
Example : column BN
Step 5:
In the row 15 insert the title "Project in trouble"
Step 6:
From the row 16 to at the end of the projects add the formula "=TRIM(AO16)" if the metric is a string (in red the number of the row) if it is a number only the formula "=AO16"
Note:
The metrics added they will be visible only on own PC, to add the metrics in the Report visible for all people
you have to request a change using Freshdesk: https://sbs-support.solvay.com/helpdesk