Access ADM and WebDP with this link: http://alphdb05.eua.solvay.com/ADMPrd/

Master Data

Material creation

Open the Materials table, then hit: Add


You'll have to populate several 



Location Dependent Quality Test Lag

The material shows a global Quality test lag:


The Location dependant Quality test lag let you 



Impact on Material availability in Picaso and on Planned order end date in SAP.


In order to avoid duplicating QC times when one is maintained in SAP, you want to use the Schedule Upload Lag Adjustment Table.

Keep in mind that the Picaso → SAP interface always uses these two factors. This is hardcoded in the interface.

SKU Mapping

Inventory Targets and Preferences

Formula

A formula is a list of ingredients. It is our SAP Bill of Materials.

Most formulas are created in Picaso by uploading SAP BOM's.

(automatic refresh if BOM modified? TBC)

Picaso formulas are named after the SAP Production version they are selected from. Therefore, a BOM not associated to a Production Version will not load in Picaso.

Formulas numbers are generated automatically in Picaso. These numbers will be used in Production Standards Effectivity..





Production Standards

Production Standards Effectivity

Product Family / Business Unit

Schedule Upload Lag Adjustment

The schedule upload lag adjustment no effect in Picaso (neither on the grid, no anywhere else).  Only affect the interface to SAP for planned orders.

Used when the GRPT / QM Module with Average Inspection Duration are used in SAP.

The Planned order end date = Run End Date + QC Lag + Schedule Upload Lag Adjustment

Transitions

Schedule colors

Troubleshoot

Interface Management

Production Schedule Monitoring

Push Button Management

User Management







  • No labels