Access ADM and WebDP with this link: http://alphdb05.eua.solvay.com/ADMPrd/

Master Data

Material table

Picaso materials are not package specific. They match the SAP concept of a Material group.


The material filelds are to be populated as below:

FieldMandatory/OptionalRuleComment
MaterialMandatory
Picaso materials are not package specific. They match the SAP concept of a Material group.
Nome CodeMandatorySame as Material
ManagerMandatory
Whomever is in charge. Usually the GP or the PM.
Material TypeMandatoryMaterial Type
DescriptionMandatoryFree text




Quality Test Lag


















































Material types

Material typesWhat for
Finished GoodsFinished goods
AdditivesRaw Materials
IntermediatesBulk, polymers
Package MaterialsPackage Materials
ResinsResins
sfmmonomers (TFEM, Sulfones, VF2,...)
wide spec

Location Dependent Quality Test Lag

The material shows a global Quality test lag:


What if the QC time is not the same in the two (or more) production plants that this product is manufactured?

The Location dependent Quality test lag let you deal with locations where the Quality test lag differs from the material default.



Effect of the Quality Test Lag on:

  • the production schedule: none
  • the grid: it offsets the availability of the output product


In order to avoid duplicating QC times when one is maintained in SAP, you want to use the Schedule Upload Lag Adjustment Table.

Keep in mind that the Picaso → SAP interface always uses these two factors. This is hardcoded in the interface.

SKU Mapping

Inventory Targets and Preferences

Formula

A formula is a list of ingredients. It is our SAP Bill of Materials.

Most formulas are created in Picaso by uploading SAP BOM's.

(automatic refresh if BOM modified? TBC)

Picaso formulas are named after the SAP Production version they are selected from. Therefore, a BOM not associated to a Production Version will not load in Picaso.

Formulas numbers are generated automatically in Picaso. These numbers will be used in Production Standards Effectivity..





Production Standards

Production Standards Effectivity

Product Family / Business Unit

Schedule Upload Lag Adjustment

The schedule upload lag adjustment no effect in Picaso (neither on the grid, no anywhere else).  Only affect the interface to SAP for planned orders.

Used when the GRPT / QM Module with Average Inspection Duration are used in SAP.

The Planned order end date = Run End Date + QC Lag + Schedule Upload Lag Adjustment

Transitions

Schedule colors

Troubleshoot

Interface Management

Production Schedule Monitoring

Push Button Management

User Management