Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Current »


For Functional information about the "Adminsitrative Scheduling LT", please refer to: Administrative Scheduling LT


Administrative Scheduling LT in DynaSys


Administrative Scheduling LT: It’s the administrative time to schedule Production operations, it depends on multiple factors and should be the max between: Meetings frequency, Prod Campaign frequency,  Fixed/frozen horizon MF50


> By default equal to 3 for FG and Intermediates (0 for Raw Material),  based on “Val Class for P&I”.
> It’s used in the formula to calculate SHS RLT of a Material. 


Note: Users can override the initial value proposed (either one by one or via a Mass upload). For Mass upload, please see this section Export/Import via Excel


The best way to get IT support is to use the new Service One Platform.