The objective of this documentation is not to allow to recreate from scratch the object but to explain everything that is not obvious by looking directly at the query/workbook or emphases on things that are important for the report to work.

Remove the sections that are not relevant.

Description

BW - Labor Planning Tool (Core Query)

Technical NameBW_QRY_CPPPCP02_0001

Application

PP

Info-provider

CPPPCP02

Usage type


Expected users


Workbook/Query General Description


This query is a toolbox. Declinasion of available data will be done by project team.


This query is based a flow existing on WBP, replicated on CPX Mini BW

Bellow WBP documentation

Functional documentation on Wiki
Technical documentation


Functional Specification Document :

Report Layout :

https://drive.google.com/file/d/14ny8CriejFj-WmSLaIfpCtORasGYC2GB/view

General parameters

Global properties

TabScreenshotComment
Display
Rows/Columns
Value Display
Planning
Extended

Variables

Definitions

Variable Name

Info-object

Selection Type

Required

Description/Explanation

PlantC_PLANTSelect-option

No

V_C_PLANT_0001
Work CenterC_WORKCTRSelect-optionNoV_C_WORKCTR_0001
Planning ScenarioC_PLSCNSelect-optionNoV_C_PLSCN_0001
Calendar Year/Week0CALWEEKSelect-optionYesV_0CALWEEK_0001

Variable Sequence

Filters

ObjectFilter ValueExplanation

Key figures


DescriptiontypeRestricted or Calculated KeyFigureSourceCalculation ruleConversionComments

Available Capacity



0STANDCAP


Available Capacity Uncounstraint

K_CAPUNCO


Quantity Input/Output

K_QTYESM


Target Capacity Requirements Order

0CAPREQMTS



Key Figure 1

Description

Calculation rule detail

Text Replacement Variable

Currency Conversion

Exchange Rate Type : 

Currency : 

Time Reference : 

Unit Conversion

Unit : 

Characteristics

LocationInfo-object NameInfo-object TextSourceExplanation (if needed)
Row0SOURSYSTEMSource System ID
No display
RowC_PLANTPlant
Key + tex
RowC_WORKCTR Work Center/Ressource
Key + text
RowC_MATNRMaterial
Key + tex
FreeC_PLSCNPlanning Scenario
Key
Free0BASE_UOMBase UOM
Key
Free0CAPA_UNITUnit of Capacity Requierement
Key
Free0INFOPROVInfoprovider
Key
Free1CUDIMCurrency/Unit
Key
Free C_PLANR  Department TC27T-PLANR

 Key + Text

PLANR => Capacity planner group

If 2 capacity in certain work center. Capacity Category 001(Machine time) should be selected.

CRHD->KAKO-PLANR->TC27T-Capacity Planner Group Text

FreeC_PRODVERProduction Version
Key
Free0CALWEEKWeeks #  Calculation based on Work Center/Calendar

FreeC_ZPLNIDSnapshot
Key
 Free C_WORKCTR__0FACTCAL_ID  Calendar

KAKO-KALID (KAPID??)

description in table TFACT

description KAKT- KTEXT

 Key + text

If 2 capacity in certain work center. Capacity Category 001(Machine time) should be selected.

FreeC_CURLOCCurrent Location
Added for authorization management : USA / OTHERS
Free0CALMONTHMonth

Based on End date of week (Sunday)

Determine month and show up in the report

FreeC_WEEKDAY End date of Week (Sunday)
Based on Week in the report, list date of sunday in that week

C_WORKCTR__0PP_CAPIDCapacity ID

Cells

Conditions

Condition Name

Active

By default

Key Figure

(Structure)

OperatorValueCharacteristic Assignement






Exceptions

Exception Name

Active

By default

Alert Level

OperatorValue

Other parameters

(if different from default)

Yes/No






 Data check with WPX

Transaction CR03 to display work center masterdata

Table CRHD Work Center Header

  • No labels