A) Below list of Update done on WBP (open mandant)

all updates should be reproduced on WBD after the freeze + DQ1 also to remove on production and align all BW environnements.

 

1) Date 15.02.2019 : RFC 7000042973 / Admin Change

Update transformation :  0D38WB3HATF5Q5RHA3ELBINH0K773W1P  (TRSF : C_WBS_EL2 -> C_WBS_EL2)

Action : delete end routine because each reload of C_WBS_EL2 to C_WBS_EL2 is deleting all attributs except the attributs manages inside the transformation)

Linked with Freshdesk ticket 2430


2) Date 21.03.2019 : RFC 7000043200 / Admin Change : 5000006469


Update 2 queries :

BW_QRY_MVFIWC03_0002 + BW_QRY_MVFIWC03_0003

Action : change the formula to not take into account the % method in the calcul

Linked with IFSR16 project


Update of MPR_FC003

Action : add CRCOPA29  (PAX: Profitability Analysis: COPA - IECRA Determination WP1) in the multiprovider MPR_FC003

The infocube CRCOPA29 was created in January to follow the PAX split project and all PM, PV, PX and PY codes reloated to PAX project are not integrate in the existing infocube COPA dataflow but in the new one and this new is not well integrated in the Fixed costs solution and only COPA BW solution.