General presentation

Objective of the application

 

SPRINT stands for Solvay Purchasing Reporting INTelligence

SPRINT is a project launched early 2014, with the main purpose to build and deliver a reporting application to cover both the Purchasing and the PtP reporting needs.

It is hosted in WBP server, collecting information from PF1-050 (PRS), PF1-020 (Solvay legacy ERP), WP1-400 (Rhodia legacy ERP) and RHO-020 (Acetow ERP).

SPRINT application is available for the two “family” of users

  • Purchasing & Supply Chain function
  • SBS PtP

each one having a dedicated Menu in WBP with the respective queries.


The Sprint reporting is also including queries based on following projects :

  • PUNCH (QM Notification - Task/Activity/Causes/Item)
  • SRM7 (Shopping Cards)

    SRM7 is used by Rhodia and by Solvay (SMILES program is rolling out SRM7 for Solvay; first rollout for NAM and LATAM went live on July 1st 2014, next rollouts for APAC and EMEA planned go-live for 2015).The SRM7 system is shared by both legacies and is connected to both ERP systems.


Tool Leader + IT leader of the application:

Contact on ECC side for MM => Henri OLLIVIER

Usage information

History

SPRINT is a project launched early 2014. The roadmap of the project has been sliding in time and at the current date (January 2016) the Purchasing solution has been live for 9 months (first deployment made in March 2015 for APAC users, second deployment made in April 2015 for NAM users, third deployment between May and June 2015 for EMEA users and forth deployment in June 2015 for LAM users); the SBS PtP solution is partially deployed since June 2015.

One of the major objectives of the project is to have and maintain a reporting solution that is kept simple, meaning, that unlike what happened with GSV (where more than 80 queries exist due to multiple copies made for each user request), the aim for SPRINT is to keep the number of queries limited.

Roles & Access

Roles and access

List of application role + menu role  and explanation if we have several applications role with specials rules.

Role CodeRole DescriptionExplanation
ZR_RCS_CA_M04 SPRINT - Purchasingrole menu
ZR_RCS_CA_M31SPRINT - SBS - PTProle menu
ZR_RCS_CA_M54SPRINT - Supplier Creditrole menu
ZR_RCS_SPRINT2_A01SPRINT   2 - End User role

role menu for Sprint, gives access to all cubes under infoarea IA_PUR_*

Authorization Object ZBI_SPRINT2 / Authorization on zone, GBU, Plant, Company Code

This role has to be used with the role menu Purchasing or PtP

ZBI_RCS_SC_A01SPRINT - Supplier Credit

role menu for Supplier credt, gives access to all cubes under infoarea IA_SC_*

Object ZBI_SPRNT_SC / Authorization only on Company Code

This role has to be used with the role menu ZR_RCS_CA_M54 / SPRINT - Supplier Credit

NB: The role menu ZR_RCS_ALL_MENU "Role composite with all role Menu and perimeters" gives access to all role menu. When asking for a new role menu, do not forget it is added to that one.

NB: ZR_RCS_SPRINT_A01 & ZR_RCS_SPRINT_A02 are obsolete

Authorization objects

List of autorisation objects mandatory for the application.

Authorization objectExplanation

Zone (C_PZONE)

ZR_*_CA_P11

Authorizations exist on this object, but all users have access to all (role ZR_TOUT2_CA_P11), this authorization on Zone is abandoned.

NB: ZR_TOUT_CA_P11 is obsolete

GBU (C_SUBACT2__CPFCTR1_2)

ZR_*_CA_P05
Plant (C_PLANT)

ZR_*_CA_P02

ZR_7866_CA_P02 => Plant 7866 - Chalampé (ex 7027)  - (Cie ZFR9)

ZR_TOUT_CA_P02 => All Plants "Solvay"

Company Code (C_COMPCDE)

ZR_*_CA_P01

ZR_ZFR9_CA_P01 => BUTACHIMIE - ( ZFR9) (ex 0560)

ZR_TOUT_CA_P01 => All Companies "Solvay"

 

See also file maintained by Authorization team : BW Catalog of Roles / link: https://drive.google.com/open?id=10GEfKYqrT1eeTO_uHYAheL1GX7L5y_pvH0KQU64qh5I

Dataflow overview

See SPRINT Dataflow https://drive.google.com/open?id=1G0eplgqwvDwJjtYoziwdE2NPT5YtSjm72fUXXlPcEhM

See also previous technical dataflow : SPRINT - Technical Data Flow.pptx

https://drive.google.com/open?id=0BzuKacO6n43ic2tUNjhKelRsWWc

 

Reporting documentation drive folder:

https://drive.google.com/drive/folders/0B0qn89R0RGdqYkZZOFZyYXlXVkE

Exemple of dataflow overview :

Functional and Technical rules on Workbench + Reporting

Rules & Explanations

Data Mappings

Directory 01. Data Mapping https://drive.google.com/open?id=0B6ePM5y2xkfkLU1WV1JHUjFEdTQ

SPRINT - Data Mapping - Master Data

 https://drive.google.com/open?id=1ECdjg6yFQ_v6bTEWbjuUni8NRNbSvGw0EAApb8XA358

SPRINT - Data Mapping - Purchase Schedule Line V2

https://drive.google.com/open?id=1-TqvFdKifRXQU5vwdBFEXcW9rje9PDNs3EMfCpZf7dc

Masterdata RULE1 on Vendors (C_VENDID) / Class attribut (C_VENCLS)

This rule concerns only Solvay vendors (from PF1) P*, which are employees not existing in PRS.

These vendors are partly created in Solvay PF1 and it is then not possible to set Class = 'X' in Solvay PF1.

For those vendors, the class has to be set to 'X' in BW.

The intervall of vendor is managed in Global Filter (C_GLBFILT). Currently P000000000 to PZZZZZZZZZ

Masterdata RULE2 on Realigned Material Group (C_MATPUR2) 

All realigned material group are existing on Solvay, descriptions are then filled from PF1 only. Only english description are required.

Masterdata RULE3 on Terms of Payment (C_PMNTTRM) 

Terms of Payment on SAP side are managed into 2 tables. TVZBT for sales (customers), T052U for purchasing (vendor). 

Payment terms can be common. On BW there is only one object for Payment Terms. T052U has to be loaded first. The description of common terms will be then TVZBT's one.

Note that keys are differents, no matters, the last description is kept.

ReadSoft DataFlow

SPRINT - Data Mapping - Read Soft https://drive.google.com/open?id=1YV_8OtL4M16bszi1fqVE99O19fPk7EsEYhc9UK4DoP0

 

WBS determination reading Settlement Rules 

This rule concerns only RCS & Solvay FIAP data (transformation between DBFIAP01/2 et DB_FIAP1/2). Acetow is not concerned.

The Settlement rules (table COBRB) are loaded every days by another application (RCS : Dso DSRCOBRB / Solvay : Dso DSSCOBRB).

Reuse of rule between ODS_PMEN to DBFICS02. 


Case WBS element is already determined for the FIAP record => keep it, no further determination.

Case WBS element is empty and CO order is filled => read settlement rules

         First check is a previous determination has been done (lookup on Dso)

=> If yes, take the WBS element stored

=> if no, read settlement rules

The check is done to avoid dupplicates as the WBS element is part of the key, and settlment rules can be changed even for the past.

NB: the check can be skip for performance purpose essentielly (case of an initialization for example) => Flag in Global Filter SPRINT/DB_FIAP1 or DB_FIAP2/ put Y in low value and Y. Do not forget to put it back to N afterwards. 

 


 

Segmentation Domaine/Segment


LeadTime

Lead Time https://drive.google.com/open?id=0By6hfdCwPGY_a09sQWJ4NHlWcnc

 

Material Group (C_MAT_GRP)

The material group can be found at different places:

  • masterdata C_MATNR2 : loaded via datasource 0MATERIAL_ATTR.
  • masterdata C_PO_ITM : loaded via datasource DTS_BW_PO_ITM. Caution special rule for Item Category 9 "Service" (EKPO-PSTYP) or empty material group (EKPO-MAKTL)
  • Schedule line Dsos/Cubes : load via 2LIS_02_SCL, extended. Caution same special rule, but Abap coded slightly differently => DO NOT use it, material group is not always correct.
  • FIAP Dsos/Cubes : a lookup is done on Business level of Schedule line => DO NOT use it, material group is not always correct.

Usage of tables :

  • Z1M_BW_MAT_GRP for Solvay PF1
  • ZWPUT042 for RCS WP1 and Acetow RHO

https://drive.google.com/open?id=1tJe9gPLtq-L6L813vybQq5Lk7nYUJ5PseWDq_a9_RSY

Important : The Material Group in schedule line and FIAP Dsos & Cubes is partly false.

Currently Core & QV queries is using C_MAT_GRP from FIAP or Schedule lines. It has to be changed with C_PO_ITM attribut when Business validates it.

  • Solvay cases (the list might be not exhausted)
    • Issue for S1.2009
      Example PO 4511000082/1340 => Document date 31.03.2009 => FI document 6311201583/5835/2015
      Only one part of PO for S1.2009, having a schedule line over 2013 have been loaded into BW. On may 2015 initialization, the PSA was not well loaded, and no action have been done to correct it, so part of S1.2009 is missing. No correction have yet been done as Business DSO for schedule line is using ratio in addition, and a whole re-initialization would take several weeks.
    • PO with schedule line previous to 2013 but in actual FI documents
      Example PO 3100441596 => document date 09.07.2012 => Good Receipt / MM Invoice en 2012 => FI document 6311603854 / 5782 / 2015. These PO have not been loaded into BW. The FI documents do not have PO information.
    • Deleted PO items
      Example PO 3100578083/20 => 2 FI documents created (6311642636/0292/2014 and 6311644101/0292/2015) before the PO item deletion the 22.12.2015.
      The deleted PO items are not kept into BW (0PROCESSKEY non kept between Propa & Business DSOs). The FI documents have been reloaded several times in 2016. As the PO item is not existing anymore in the business DSO, the FIAP document can not be filled with PO information
  • Rhodia cases (the list might be not exhausted)
    • Shipment Cost Number archived or other for service PO
      Example PO 4502271249
      PO 4502271249 => entry sheet 1005459308 => Shipment Cost 2164736
      This PO has had a determined material group 0433 when the Shipment Cost was existing on WP1 (table VFKP)
      Today the shipment 2164736 can not be displayed anymore in WP1, so is not existing anymore in table VFKP. Are the shipment costs archived at anytime? et just deleted some how?
      The material group can not be determind any more when the PO schedule line was loaded again when the invoices  were created the 02/05/2016


      The material group is also available in masterdata C_PO_ITM.
      For this PO  4502271249, the material group is 0433. No modifications on the PO have been detected, so no additional loading even when the invoices were created. The material group remains 0433. Caution, if the masterdata C_PO_ITM is reloaded today, the material group would be reset to empty!
    • Missing combination in table ZWPUT042
      Example 4502642333. Empty also in masterdata C_PO_ITM as no corresponding value for 9008/12/0003 is existing in table ZWPUT042
      Caution, if the combination is added in table ZWPUT042, previous PO will not be updated, and masterdata C_PO_ITM can not be fully reloaded because Shipment Costs Number are archived or deleted.

     

     

Dependencies with other applications

Data loadings

Info providers and objects loaded

See Global Filters (C_GLBFILT) part, it is possible to hold loadings from one or several souce systems.

Main Chains

Process ChainCodeTypeFrequencyComments
SPRINT: Daily LoadingPC_SPRINT_DAILY MAIN
  • launched by RSP_DAILY
  • Daily
  • Sunday night to thursday night, around 5am
  • Whole chain lasts around 2 hours 1/2
Not iso with WBD one. Avoid transport
SPRINT : Domain / Segment (Global)PC_SPRINT_TR_DS1MAIN
  • Weekly
  • Sundays at 12am (direct scheduling)
  • Whole chain lasts around 1 hour
 
PUNCH : Global Process ChainPC_PUNCH_GLOBALMAIN
  • launched by RSP_DAILY
  • Daily
  • Sunday night to thursday night, around 8am
  • Whole chain lasts around 1 hour
 
Process Chain for Shopping Cart - MainPC_SRM_SC_ATTRMAIN
  • launched by RSP_DAILY
  • Daily
  • Sunday night to thursday night, around 8am
  • Whole chain lasts < 1 hour
Launch SRM7

Slave Chains

Process ChainCodeTypeFrequencyComments
SPRINT : Propagation (Rhodia)PC_SPRINT_TR_P1 slave Not iso with WBD one. Avoid transport
SPRINT : Propagation (Solvay)PC_SPRINT_TR_P2slave Not iso with WBD one. Avoid transport
SPRINT : Propagation (Acetow)PC_SPRINT_TR_P3slave Not iso with WBD one. Avoid transport
SPRINT: Business Layer (Rhodia)PC_SPRINT_TR_B1slave Not iso with WBD one. Avoid transport
SPRINT: Business Layer (Solvay)PC_SPRINT_TR_B2slave Not iso with WBD one. Avoid transport
SPRINT: Business Layer (Acetow)PC_SPRINT_TR_B3slave Not iso with WBD one. Avoid transport
SPRINT: Business Layer (PRS)PC_SPRINT_TR_B4slave OK. Aligned DEV/QAS/PROD
SPRINT Reporting Layer (Rhodia)PC_SPRINT_TR_R1slave Not iso with WBD one. Avoid transport
SPRINT Reporting Layer (Solvay)PC_SPRINT_TR_R2slave Not iso with WBD one. Avoid transport
SPRINT Reporting Layer (Acetow)PC_SPRINT_TR_R3slave Not iso with WBD one. Avoid transport
SPRINT : Domain / Segment (Business Layer)PC_SPRINT_TR_DS2slave 

Not iso with WBD one. Avoid transport

caution : direct scheduling on WBP

SPRINT : Domain / Segment (Reporting Layer)PC_SPRINT_TR_DS3slave 

Not iso with WBD one. Avoid transport

caution : direct scheduling on WBP

PUNCH : Master Data AttributesPC_PUNCH_MD_ATTRslave  
PUNCH : Master Data TextsPC_PUNCH_MD_TEXTS   
PUNCH : Business Layer (Rhodia)PC_PUNCH_TR_B1slave Caution : the Propa Layer (Rhodia) is done in PCH QM_DAILY_TRANS
PUNCH : Reporting Layer (Rhodia)PC_PUNCH_TR_R1slave  
PUNCH : Propagation layer (Solvay)PC_PUNCH_TR_P2slave  
PUNCH : Business Layer (Solvay)PC_PUNCH_TR_B2slave  
PUNCH : Reporting Layer (Solvay)PC_PUNCH_TR_R2slave  
PUNCH : PSA and Change Log DeletionPC_PUNCH_PSA_CHG_LOG_DELslave  
Process Chain for Shopping Cart SRM7 - MainPC_SRM7_SC_ATTRslave  
Process chain SRM7 Master dataZPC_SRM7_MASTER_DATA2slave  
SRM: Global ChainPC_SRM_001slave  
SRM: MD ATTR - D - 001PC_SRM_MD_ATTR_001slave under SRM: Global Chain
SRM: MD TXT - D - 001PC_SRM_MD_TXT_001slave under SRM: Global Chain
SRM: TD - D - 003PC_SRM_003slave under SRM: Global Chain

Other Chains

Process ChainCodeTypeFrequencyComments
     
     
     

Loading frequency

Process Chain PC_SPRINT_DAILY runs daily, Sunday night to thursday night, around 5am.

Process Chain PC_SPRINT_TR_DS1 runs weekly on sundays at 12am

 

Average performance


 

Key FigureEstimation
~ Average Process Chain Runtime

Daily Main Process Chain lasts around 2 hours 1/2

Weekly Process Chain lasts around 1 hour

~ Average nb of rows loaded per load 
~ Total nb of rows loaded (if full) 
~ Average Runtime for 10k lines 

Record Keeping

Reporting

Queries End User Documentation

SPRINT training & SPRINT presentation 

https://drive.google.com/a/solvay.com/folderview?id=0B5Ivsv4WTtUbVktFZlNVRkNYU1k&usp=sharing

Main queries

Main functionalities

Terms of Payment

 SPRINT  DPO
Vendor / Company Code view (LFB1)C_VENDCOM__0PMNTTRMSC_VENDCOM__C_PMNTTRM
Vendor / Purchasing view 1 (LFM1)C_VENDPRG__C_PMNTTRMC_VENDPRG__C_PMNTTRM
Vendor / Purchasing view 2 (LFM2)C_PO_ITM__C_PMNTRM2C_VENPRG2__C_PMNTTRM
In Purchase Order (PO)C_PO_ITM__C_PMNTTRMC_PO_ITM__C_PMNTTRM
In Accounting Document (DOCT)C_PMNTTRMC_PMNTTRM

MaintenanceBroadcast

No Broadcast implemented

Known bugs

Recurring procedure

Variables (TVARV/Global Filters)

Variable (TVARVC)

VariableExplanation

LOGSYS_A , LOGSYS_R, LOGSYS_S

A= Acetow, R=Rhodia, S=Solvay

Bex variable V_LOGSYS_0007 used to fill query prompt

=> SE24 ZCL_BIU001_V_0LOGSYS_0007
  

 

Global Filters (C_GLBFILT)

StreamRuleExplanation
SPRINT

DB_FIAP1

DB_FIAP2

Variable used in transformation (start routine) between DBFIAP01/2 => DB_FIAP1/2.

 Aim : skip the DSO DB_FIAP1/2 lookup.

In case of a reloading of FIAP, this look-up in not usefull. To optimize loading time, set the filter to Y. Do not forget to put it back to N afterwards.

SPRINTSEGMENTAT

Variable used in DTP filter to define the number of year to consider for segmentation redetermination

DSOs : DB_FIAP1/2/3 + DB_PUHD1/2/3 + DB_PUSL1/2/3
SPRINTCLASS_X

Variable used in transformation to load Vendor number from DataSource 0VENDOR_ATTR / Solvay

currently : interval P000000000 and PZZZZZZZZZ

SPRINT

ACETOW

RHODIA

SOLVAY

PRS

Theses variables are used in Process Chains. After the loading of the attributes of the master data, there is a decision (one by source system) to launch or not the loading of the transactionnal data


FIAP Reloading

FIAP for SPRINT Dsos (CR_PUAP1/2/3), and Cubes (CR_PUAP1/2/3) have been reloaded several times since project golive.

At least is requested : current exercice + 3 previous ones.

Example 2016 => 2016 + 2013 to 2015

 

See ModOp SPRINT reloadings https://drive.google.com/open?id=1qSUGEl6v1Iftdc9N1CP7ytFxW2ew2lGO0eEmy4Gvwk0

 

It is important to check image Before/After. Only opened periods could be differents.

FIGL Reloading

Caution, take into account special periods 013 to 016, overwise December figures will be wrong.

Special periods 013 to 016 are at last stored on period 012.

 

See ModOp SPRINT reloadings https://drive.google.com/open?id=1qSUGEl6v1Iftdc9N1CP7ytFxW2ew2lGO0eEmy4Gvwk0

 

It is important to check image Before/After. Only opened periods could be differents.

 

ReadSoft Reloading

 

See ModOp SPRINT reloadings https://drive.google.com/open?id=1qSUGEl6v1Iftdc9N1CP7ytFxW2ew2lGO0eEmy4Gvwk0

For information, at the reloading of readsoft there have been issue during activation of data in DSO DB_RDSF1 & DB_RDSF2.

Somes rows had currency = USA, chinese character in field wc user and "!" in the beginning of field Reference document number.

So there is an exclusion in DTPs when currency = USA and routines to clear stranges characters for wc user and reference document number. 

 

 

 

Planned Evolution

Useful transactions / programs

TransactionDescriptionCorresponding tableComments
XK03Display Vendor (Central)LFA1 
MK03Display Vendor (Purchasing)LFM1/LFM2 
FK03Display Vendor (Company Code)LFB1 
ME23NDisplay Purchase OrderEKKO/EKPO 
ME53NDisplay Purchase RequestEBAN 
FB03Display Accounting Document

MKPF/BSEG

BSIK/BSAK

 
ME13

Display Purchase Info Record (PIR)

Afficher Fiche Info Achat (FIA)

 

to display scale (barême) choose "conditions" then icon "steps (marches)

example RCS : Info Record 53002260253 or 5300260253

ME03Display Source List 

source d'approvisionnement

example RCS : material 1050025 / plant 7822

    
    