General presentation
OTIF is sub function of Global Sales (analysis of all documents for sales handling costumers or transfer with plants and GBUs).
The term OTIF means On Time In Full, that is an analysis if the delivery was done in correct time and the quantity was delivered in exact time.
This sub function works with datal handled by Global Sales about sales order lines, scheduled lines, deliveries and invoices.
The load is done daily using the process chain scheduled with delta process.
List of contacts
- Functional Owner of this report: Jean-Baptiste Cercueil
- IS Reporting Leader: Sandra Silveira (SBS IS)
- BW Coordinator: Guillaume Thevenet (SBS IS)
- BW Developer: Nestor Araujo (SBS IS)
Objective of the application
- The main purpose is to have a detailed core report for all GBU's and also be the data source for SCE Dashboard in Qlikview.
- Analyze the behaviour of sales processes since the goods issue until the shipment end process.
- Understand the reasons why the process was not finished with OTIF
- One common & consolidated reporting space for the group
- Rationalization of the “live” solutions and reduction of evolutions requested
- Maintainable and sustainable solution.
- Enabler for productivity actions on OTIF process
- Drillable solution - allowing possibility to detect & analyse problems by showing the link from aggregated figures down to document in SAP.
- Few “core” queries/workbooks design for application (=> Use BW analysis functionalities and not just as extractor).
Reasons
- Revamped reporting BW solution based on RCS (WBP-TR002) but built on old historical architecture (no project on this application for years) - mainly designed for cost reporting.
- Only aggregated monthly data available on PF1.
- Specific solution (cross legacies) built for CO2 footprint with activation of some standard extractors on PQ1.
- More than 250 existing queries in SAP => almost impossible to maintain on an efficient way, most of then not or almost not documented.
- Some previous experiences of common transversal reporting tools : WISE (working cap.) and SPRINT (Purchasing and Procurement).
- “Drillable” solution - allowing possibility to detect & analyse problems by showing the link from aggregated figures down to document in SAP.
- Few “core” queries/workbooks design for application (=> Use BW analysis functionalities and not just as extractor).
History
The OTIF analysis is generated in BI 4 with data based on PPS application just for Rhodia side and load QV application for SBS SPE (Supply chain excelence).
The OTIF for Solvay was created in 2016 in BW after OBAS implementation and it is the source for SBS SPE also.
Usage information
Around 300 users, worldwide with daily update
Statistics by infoproviders
| InfoProvider Used | Description / Calendar Year/Month | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 |
| MVSDSO10 | MP: Sales - OTIF (OBAS) | 570 | 679 | 722 | 604 | 539 | 591 | 404 |
| MVSDSO50 | MP: Sales - OTIF (Global Sales) | 12 | 27 | 5 | 19 | 9 | 20 | 31 |
| Overall Result |
PS: The providers marked in blue are important to be monitored, the other ones are referent to the old TR solution that should be desactivated soon.
Statistics by queries
| InfoProvider | Query | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | |
| MVSDTR10 | BW_QRY_MVSDSO10_0001 | BW Sales - OTIF (core query) | 428 | 390 | 441 | 332 | 312 | 285 | 232 |
| BW_QRY_MVSDSO10_0002 | BW Sales - OTIF dashboard (core query) | 75 | 133 | 156 | 159 | 131 | 155 | 73 | |
| Result |
General Rules
Functional Specifications
Main Rules
SCE defines 6 different OTIF indicators: On Time Delivery in Full (Customer Request) : Concatenates In full Requested and OTD CR On Time Delivery in Full (1st Confirmed) : Concatenates In full Confirmed and OTD FC On Time Delivery in Full (Last Confirmed) : Concatenates In full Confirmed and OTD LC On Time Shipment in Full (Customer Request) : Concatenates In full Requested and OTS CR On Time Shipment in Full (1st Confirmed) : Concatenates In full Confirmed and OTS FC On Time Shipment in Full (Last Confirmed) : Concatenates In full Confirmed and OTS LC All calculation in this query is managed at Order line level. When several schedule lines matching with one same order lines we are considering sums for quantities and maximum for dates.
1- Rules for OTIF Calculation (Solvay)
DAYS DELAY (Gross)
Achieved Delivery Date
=If([Transportation mode]="PICK UP" Or [Order Document Type Code]="KE";[V_Max Actual GI Date];If(IsNull([V_Max End of Shipment Calculated]);[V_Max Actual GI Date];[V_Max End of Shipment Calculated]))
OTD CR
=If([Transportation mode]="PICK UP";If(DaysBetween(Last Req Delivery];[Achieved Delivery Date])<0;0;DaysBetween(Last Req Delivery];[Achieved Delivery Date])))
OTD FC
=If([Transportation mode]="PICK UP";If(DaysBetween([V_Max 1st ATP];[Achieved Delivery Date])<0;0;DaysBetween([V_Max 1st ATP];[Achieved Delivery Date])))
OTD LC
=If([Transportation mode]="PICK UP";If(DaysBetween([V_Max Last ATP];[Achieved Delivery Date])<0;0;DaysBetween([V_Max Last ATP];[Achieved Delivery Date])))
Achieved Shipment Date
=If([Transportation mode]="PICK UP" Or [Order Document Type Code]="KE";[V_Max Actual GI Date])
OTS CR
=If([Transportation mode]="PICK UP";If(DaysBetween([V_Max Last Req GI]; ";[V_Max Actual GI Date] )<0;0;DaysBetween([V_Max Last Req GI]; ";[V_Max Actual GI Date]
OTS FC
=iF([Transportation mode]="PICK UP";If(DaysBetween([V_Max 1st ATP GI]; ";[V_Max Actual GI Date] <0;0;DaysBetween([V_Max 1st ATP GI]; [V_Max Actual GI Date] )))
OTS LC
=If([Transportation mode]="PICK UP";If(DaysBetween([V_Max Last ATP GI]; ";[V_Max Actual GI Date] <0;0;DaysBetween([V_Max Last ATP GI]; ";[V_Max Actual GI Date]
DAYS DELAY NET (APPLY THE TOLERANCE)
TOLERANCES
AB";"AC";"AE";"AF => 7 days (ocean)
AJ => 1 day (LTL)
AK AH AI => 0 (FTL)
AU AP => 3 (Barge / Rail)
AV => 2 (multimodal)
“AL” “AW” “AX” => 0 999 days) (Pick Up)
=If([OTD CR - Delay Days]=999;999;If([OTD CR - Delay Days]=0;0;If(Abs([OTD CR - Delay Days])<=[Tolerance Days];0;If([OTD CR - Delay Days]<0;[Tolerance Days]+[OTD CR - Delay Days];[OTD CR - Delay Days]-[Tolerance Days]))))
IN FULL
IN FULL REQUESTED – IFR
(Order line qty – Sum Delivery quantity) + tolerance that comes from the sales order
IN FULL CONFIRMED – IFC
(Sum Scheduled Confirmed Qty by sales order item – Sum Delivery quantity) + tolerance that comes from the sales order
LEAD TIMES
7 lead-times have been defined by SCE (to be challenged for rationalisation)
Leadtime 1 : The Lead-time is the difference, in days, between the customer PO Date (order line level - VBKD-BSTDK), and the requested material availability date (Max in the scheduled line level).
=DaysBetween([V_Max Cust PO];[V_Max Req Material Availability])
Leadtime 2 : The Lead-time is the difference, in days, between the customer PO Date (VBKD-BSTDK), and the achieved GI date
=DaysBetween([V_Max Cust PO];[Max Actual GI Date])
Leadtime 3 : The Lead-time is the difference, in days, between the customer PO Date, and the requested delivery date.
=DaysBetween([V_Max Cust PO];[V_Max Last Req Delivery])
Leadtime 4 : The Lead-time is the difference, in days, between the customer PO Date, and the achieved delivery date
=DaysBetween([V_Max Cust PO];[Achieved Delivery Date])
Leadtime 5 : The Lead-time is the difference, in days, between the creation date and the last customer req Goods Issue date
Leadtime 6 : The Lead-time is the difference, in days, between the creation date and the schedule line 1st ATP (confirmed) GI date
Leadtime 7 : The Lead-time is the difference, in days, between the creation date and the actual GI date
QUERY FILTER
1 - Sales Documents In List
Below Rhodia’s codes, check Solvay
My proposition with PF1 is to use the same documents used for Order Book OBAS:
GCTA | Standard Order |
KE | Consig issue |
SB | SB Third-p.dir order |
SO | SO Rush Order |
TA | Standard Order |
TAF | Standard Order (FPl) |
TAM | Delivery Order |
TAV | Standard Order (VMI) |
TD | TD Standard Order |
TDIV | TDIV Misc Op |
TSA | Telesales |
ZITI | Sales Order ITI BR |
ZORB | Standard Order BR |
ZOUT | Other Outputs BR |
ZPVA | ZPVA Ord.immed.ship. |
ZVEX | Fut. Dely Invoice BR |
ZVEY | Fut. Dely Shipmnt BR |
Also we do not have the NB types (purchase order) together in the same DSO because the data structure is different and we do now, with BW, a straight extraction!. Are you sure that is necessary measure the OTIF for the NB Orders? For information with Order Book, we have one for sales order and another for PO's.
2 – Flag Intra GBU = NO
3 – Reason for rejection: VBAP-ABGRU is null or equal 98
2- Rules for OTIF Calculation (Rhodia)
2.1 - In Full Calculation "In Full Request Order Quantity fits with Delivery Quantity In Full Confirmed Scheduled Line Confirmed Quantity fits with Delivery Quantity "
2.2 - On Time Calculation
2.2.1 - On Time Delivery "On Time Delivery: it means that the calculation is based on date of arrival, they compare an achieved arrival date with a target arrival date. Achieved Delivery Date:
For “PICK UP” transportation mode : Last transfer order confirmation date for the order line --> FIELD LTAP-QDATU else Last Good Issue date
For other transportation mode : The last “Actual Shipment end” if it exists else the last “ planned shipment end” if it exists else the last “Actual good Issue”
OTD CR: If Difference between Achieved delivery date and Order line requested delivery Date is lower than – Early tolerance then “EARLY” else if Difference between Achieved delivery date and Order line requested delivery Date is greater than Late tolerance then ""LATE"" else ""OTD""
OTD FC: If Difference between Achieved delivery date and Orderline 1st confirmed delivery Date is lower than – Early tolerance then “EARLY” else if Difference between Achieved delivery date and Order line 1st conf delivery Date is greater than Late tolerance then ""LATE"" else ""OTD""
OTD LC: If Difference between Achieved delivery date and Order line last confirmed delivery Date is lower than – Early tolerance then “EARLY” else if Difference between Achieved delivery date and Order line last conf delivery Date is greater than Late tolerance then ""LATE"" else ""OTD"" "
2.2.2 - On Time Shipment "On Time Shipment: it means that the calculation is based on date of good issue, they compare an achieved shipment date with a target shipment date (calculated in SAP from requested delivery date, 1confirmed delivery date and last confirmed delivery date). Achieved Shipment Date: For “PICK UP” transportation mode : Last transfer order confirmation date for the order line --> FIELD LTAP-QDATU else Last Good Issue date For other transportation mode : The last “Actual GI” date
OTS CR: If Difference between Achieved shipment date and Order line requested GI Date is lower than – Early tolerance then “EARLY” else if Difference between Achieved shipment date and Order line requested GI Date is greater than Late tolerance then ""LATE"" else OTS.
OTS FC: If Difference between Achieved shipment date and Order line 1st confirmed GI Date is lower than – Early tolerance then “EARLY” else if Difference between Achieved shipment date and Order line 1st Conf GI Date is greater than Late tolerance then ""LATE"" else ""OTS""
OTS LC: If Difference between Achieved shipment date and Order line last confirmed GI Date is lower than – Early tolerance then “EARLY” else if Difference between Achieved shipment date and Order line Last confirmed GI Date is greater than Late tolerance then ""LATE"" else ""OTS"""
3- Tolerances:
"Number of days based on Transportation Mode (Order Shipping Condition) OCEAN = 7 RAIL = 3 BARGE = 3 INTERMODAL = 2 ROAD = 1 AIR = 0 OTHER = 0 "
4 - Exceptions:
"Customer Pick Up: uses Last transfer order confirmation date in calculation Customer Pick Up Early = OTIF Order Non OTIF Reason code starting with 7 = OTIF "
5 - DOCUMENTS TYPES
The document types to be considered are:
PS: NOT CONSIDER NB TYPE - CAUSE THEY ARE IN THE PO'S PART
Roles and access
List of application role + menu role and explanation if we have several applications role with specials rules.
Role Code | Role Description | Explanation |
|---|---|---|
| ZBI_RCS_SD_A01 | Application role for OBAS project / SD data / Orderbook | role menu for TIERS, gives access to all cubes under infoarea IA_SD* |
| ZR_RCS_CA_M49 | SD - Sales and Distribution | menu role |
NB: The role menu ZR_RCS_ALL_MENU "Role composite with all role Menu and perimeters" gives access to all role menu. When asking for a new role menu, do not forget it is added to that one.
Authorization objects
List of authorization objects mandatory for the application.
Authorization object | Explanation |
|---|---|
| ZRCSCAP05 | Global Business Unit (CPFCTR1_2) |
| ZTOUTCAP01 | Company Code (C_COMPCDE) |
| Sales Office (C_SAL_OFF) |
See also file maintained by Authorization team :
- BW Catalog of Roles: Authorization catalog
- BW Authorization: BW Authorizations
Dataflow overview
Multi Provider MVSDSO50 - OTIF Global
Details
Cubes
CRSDSO10 - Solvay
CRSDSO50 - Rhodia
Functional and Technical rules on Workbench + Reporting
Rules & Explanations
Main documentation:
Preparation
Design
- Functional Specification
- Map of Datasources
- Profiles Management
- Queries Definition
- Technical documentation
Deployment
Rule to get the GBU code
For Rhodia
Using distribution channel and division from material, get the IECRA code in master data C_CDSA
Using IECRA code, get the sub-activity in master data g_cwwe01
For Solvay
using business area, get the technical business area in master data c_techba
The function above is used to fill zeros left
The code above takes the GBU code from master data sub-activity (g_cwwe01)
Rule to define picked good issue (PGI) If doc type is KE or incorterm is ERW or FCA
Calculation Rules
Rule to define other date types and ship end date variable according to the content of fields actual shipment, planned shipment of GI date
Rule to define the good issue date
Rule to redefine the good issue date when the order is a pickup
Rule to define the achieved delivery date and achieved shipment datte
Rule to determine In Full requested considering the lower and upper tolerance
Rule to generate the in full requested detailed with terms light, heavy or yes
Rule to determine In Full confirmed measure considering the lower and upper tolerance
Rule to generate the in full confirmed detailed with terms light, heavy or yes
Rule to determine the differences between delivery quantity and requested quantity
Rule to generate on time delivery customer request (OTD CR)
Rule to Consider special NON OTIF reasons as OTIF
Rule to generate group of delays for OTDCR
Rule to generate OTDCR delay days
The same rules are applied for OTDFC, OTDLC, OTSCR, OTSFC, OTSLC just changing the date to be considered, see below:
For OTDFC uses the dates → v_dif_date = v_fstatp - v_shp_eact (difference between max first ATP and shipment end date)
For OTDFC uses the dates → v_dif_date = v_lstatp - v_shp_eact (difference between max last ATP and shipment end date)
Rule to define the dates used in OTS CR (ON TIME SHIPMENT Cust request)
For OTSCR used the dates → v_dif_date = v_lstrqgi - v_gi_date (difference between max actual GI date and last req delivery)
For OTSFC used the dates → v_dif_date = v_firstgi - v_gi_date(difference between max actual GI date and first ATP GI)
For OTSLC used the dates → v_dif_date = v_lastgi - v_gi_date (difference between max actual GI date and last ATP GI)
Special rule to determine the delivery date for SP (Special Pelimerer)
Unit conversions
The Unit conversion is done in the Bex queries (Quantity Conversion Type), after user chooses the unit conversion on reports
Transactionnal data are stored in sales unit
if base unit / po unit is managed in dimension MASS, conversion within table T006 works well
if base unit / po unit is not managed in dimension MASS, conversions for KG/LB/TO have to be managed on ERP side (MM03 / Alternative Conversion).
There are many "special" units on Solvay ERP, ie: 1KG, 1TN, VKG, KRE,
Important :
Quantities are not converted when loading data, and are not store into cubes (The conversion is done when running the report)
So, if a conversion is missing for a material ask the material referent to
1- manage the conversion on ERP Side by managed the material master (MM03) / unit of measure tab
2- the day after, when the DSO UOMCMAT2 is filled, the conversion is applied in the reports. It applies to whole data without any reloading.
The conversion type created by TIERS queries is QCT_MATNR4 (see below the setup for it).
BW Updated Qty Unit by Material
Dependencies with other applications
- It shares extractors (2LIS_08TRTK, 2LIS_08TRTLP, 2LIS_08TRFKZ) with the legacy TR application for WP1 and PF1.
- It was created some master data in order to have the attributes shared with several applications: shipment doc, delivery doc and shipment cost item doc.
- Data is consumed by Qlikview dashboard. The loadings in QV are daily. It runs a fixed scheduled, the loadings must be finished when the next start.
- There is an integration with SPRINT (purchase schedule lines) to store there the service purchases (freight)
- There are links between TIERS and Value Stream and Industrial dashboard (both for Rhodia legacy)
- There is an integration with SPRINT to store the profit center (C_SUBACT2) for purchase services
Rhodia PO schedule lines (DB_PUSL1)
Solvay PO schedule lines (DB_PUSL2)
- There is an integration with Value Stream to store there the cost of transports
Rhodia CUB_VS (value stream)
- There is an integration with Industrial dashboard to store there the cost of transports
Rhodia CUB_DIPL (industrial dashboard)
Data loadings
Info providers and objects loaded
1 - Main Process Chain
This process chain is responsible to trigger and syncronize all TIERS processes chains for Solvay and Rhodia. It is scheduled to run every workday inside the Daily process chain (RSP_DAILY) after general master data PC, around 3AM (French time).
2 - Propagation Layer
This process chain is responsible to run the loads between source system and first layer in BW.
3 - Business Layer
This process chain is responsible to load the second and third layers from propagation layer.
4 - Master data
This process chain is responsible to load all the master data attributes in BW.
5 - Text & maintenance
This process chain is responsible to load all the master data texts in BW.
Loading frequency
Daily inside the daily process chain
Average performance & monitoring
Daily process chain is loaded in 2 hours with around 30k lines in DELTA mode for a total of 10M lines in cubes.
See below an extract of 1 month of monitoring
Key Figure | Estimation |
|---|---|
| ~ Average Process Chain Runtime | 90 to 120 minutes |
| ~ Average nb of rows loaded per load | Shipment Header: Solvay 6K, Rhodia 2K Shipment&Deliveries: Solvay 40K, Rhodia 10K Shipment Costs: Solvay 9K, Rhodia 4K Shipment&Purchases: Solvay 110K, Rhodia 24K Shipment Conditions: Solvay 32K, Rhodia 152K 1.200K records (all providers) |
| ~ Total nb of rows loaded (if full) | Data is stored since 2014 Propagation Layer - Solvay 20.000K, Rhodia 10.000K Business Layer - Solvay 15.000K, Rhodia 8.000K Reporting - Solvay 15.000K, Rhodia 8.000K Master data - Solvay 11.000K, Rhodia 5.000K |
| ~ Average Runtime for 10k lines | 30 minutes |
For details about application load monitoring, click in following link: Application Monitoring
Record Keeping
User defined that 3 full years stored is enough to be maintained in BW.
There is no automatic process to remove historical data, so any request about historical deletion should be done by user using Freshdesk ticket.
Modeling
Info areas
Master Data
Propagation Layer
Business Layer
Reporting Layer
Virtual Layer
Multi provider
1 - MVSDTR01 - Shipm & Delivery & Cost & Cond & PO/Inv (Sol&Rho)
Data Flow
Dimensions
Key figures
2 - MVSDTR02 - TR Vir: Shipment Events (Solvay & Rhodia)
Data Flow
Dimensions
Key figures
Main KPI calculations
Main functionalities
Main datasources based on SAP tables
- 2lis_08TRTK – Shipment Header
2lis_08TRTLP – Shipment & Deliveries
- 2lis_08TRFKZ – Shipment Costs
- DTS_TRKONV – Shipment Conditions
- DTS_TRFI_ESSR – Invoices & Purchases History
- DTS_TRFI_VFKP – Invoices & Purchases Issues
Main dimensions for the data
- C_POINT2 – Connection Point (it can be a customer, vendor, plant, node point or shipping point)
C_3RPARTY – 3rd Party (Cust / Vend) - it cab be a vendor or a customer
- C_ROUTE – Route
- C_SHIPNU2 – Shipment Number
- C_SHCSTI2 – Shipment Cost item
- C_DELITM2 – Delivery Item
- C_CNDTYP2 – Condition Type
- C_SHPTP_2 – Shipping Type
- C_SHPMTP2 – Shipment Type
- C_SHCITTY – Item category shipment costs
- C_VTADD01 – Ship. Shipping Line
- C_SHIPCD2 – Shipping conditions
- 0TRZONE – Transportation Zone
- C_TRPPNT2 – Transportation planning point
- C_VSTGA – Event Reason f.deviation
- C_EVTTYP – Event Type
Reporting
Calculated & Restricted key figures
| Name | Description | Formula |
| BW_CKF_MVSDTR01_0001 | No of Containers | |
| BW_RKF_MVSDTR01_0001 | Number of Legs |
Main queries
1 - Shipment cost details analysis
- Technical Name: BW_QRY_MVSDTR01_0010
- Propose a detailed analysis of shipment cost accruals, detailled by materials. Make shipment costs accruals understandable.
- Allows benchmarking between materials, between customers.
- Gives some possibilities of drill down to get details on a macro figure.
- Public: sites log managers / GBU log process teams, base for Qlikview reportings
Configuration
2 - Shipment cost vs invoice analysis
- Technical Name: BW_QRY_MVSDTR01_0011
- Propose advanced cost analysis functionalities including invoice / accrual comparision and other ratios that can't be available at material level.
- Detect / evaluate unbilled payables.
- Audit tarif calculation
- Public: finance / controlling, sites & GBU logistics managers, data log and support teams
3 - Shipment status and events
- Technical Name: BW_QRY_MVSDTR01_0012
- Propose tracking of events on shipments. without cost considerations.
- Propose a reporting on volumetry : number of files (delivery or shipment) per flow, average value on some indicators...
- Load plan of shipping points
- Public: LOG data and support teams, GBUs sites log managers and sites operations supervisors, Transport managers
4 - CO² Emissions
- Technical Name: BW_QRY_MVSDTR01_0013
The propose is to show the calculations about quantity of carbonic gase that is released in atmosphere considering all the shipments by zone
Public: users that manage the environment effects and reports to governments
Configuration
First Result
5 - Shipment Events
- Technical Name : BW_QRY_MVSDTR02_0001
- The propose is to show the events (problems) involving the hauliers that happened during the logistic process
Public: GBUs sites log managers and sites operations supervisors, transport managers
Configuration
First Result
Queries used to load QV applications
Matrix between queries and info objects
| Query description | Cost deatailed analysis | Accrual vs invoice | Statuses and events | Event reporting | CO2 Footprint |
| Technical name | MVSDTR01_0010 | MVSDTR01_0011 | MVSDTR01_0012 | MVSDTR002_0001 | MVSDTR01_0013 |
General "Core entry keys" | COMPANY | COMPANY | COMPANY | COMPANY | COMPANY |
| PROMPT UNIT | PROMPT UNIT | PROMPT UNIT | PROMPT UNIT | ||
| PROMPT CURRENCY | PROMPT CURRENCY | ||||
| System origin | System origin | System origin | System origin | System origin | |
| BFC GBU | BFC GBU | BFC GBU | BFC GBU | BFC GBU | |
| Site (PUSITE) - C-PSITE | Site (PUSITE) | Site (PUSITE) | Site (PUSITE) | Site (PUSITE) | |
| Actual completion Year / Month | Actual completion Year / Month | Actual completion Year / Month | Actual completion Year / Month | Actual completion Year / Month | |
| Shipment departure country | Shipment departure country | Shipment departure country | Shipment departure country | Shipment departure country | |
| Shipment destination country | Shipment destination country | Shipment destination country | Shipment destination country | Shipment destination country | |
| Forwd. Agent | Forwd. Agent | Forwd. Agent | Forwd. Agent | ||
Query Specific axes | Product Hierarchy | ||||
| Material plant | |||||
| Bulk / Packed | PO number | Route | Event type | Zone | |
| 3RD Party | Shpiment cost item category | DG class | Event reason for deviation | ||
| Shpiment cost item category | |||||
| Transportation Mode | Transportation Mode | Transportation Mode | Transportation Mode | Transportation Mode | |
For those who want to detail | Plant | Plant | Plant | Plant | Plant |
| Departure Geo Zone | Departure Geo Zone | Departure Geo Zone | Departure Geo Zone | Departure Geo Zone | |
| Transportation planning point | Transportation planning point | Transportation planning point | Transportation planning point | Transportation planning point | |
| Planed completion date | Planed completion date | Planed completion date | Planed completion date | Planed completion date | |
| Actual completion date | Actual completion date | Actual completion date | Actual completion date | Actual completion date | |
| Shipment number | Shipment number | Shipment number | Shipment number | Shipment number | |
| Shipping condition | Shipping condition | Shipping condition | Shipping condition | Shipping condition | |
| Shipment type | Shipment type | Shipment type | Shipment type | Shipment type | |
"By default" shown Measures (among those available) | Accrual Net value shipment (CP) | Accrual Net value shipment (CP) | Gross weight | Nb of event | Gross Weight |
| Gross Weight (PU) | Invoiced value (CP) | Nb of shipments | Event duration | Distance | |
| Net Weight (PU) | Net weight (PU) | Nb of containers | CO2 Tons | ||
| Cost per Unit (Net) | Gross Weight (PU) | Nb of deliveries | |||
| Cost per unit (Gross) | Cost per unit (Net) | Nb of HU | |||
| Cost per unit (Gross) | # ship relevant for loading duration | ||||
| Invoice - accrual Gap | # ship relevant for On site duration | ||||
| Provisionning accuracy | # ship relevant for Queue time | ||||
| # ship relevant for Trnasit time | |||||
| Average loading duration | |||||
| Keep all others as optional | Keep all others as optional | Average On site duration | |||
| Average Queue time | |||||
| Average Transit duration | |||||
| % OTD | |||||
| % OTS | |||||
| Average distance | |||||
| "By default" shown Rows (among those available) | Source sytem | Source System | Source sytem | Source System | Source system |
| Site (CPLANT PSITE) | Site (CPLANT PSITE) | Site (CPLANT PSITE) | Site (CPLANT PSITE) | Site | |
| Shipment destination Country | Forward agent | Forward agent | Forward agent | Ship Shipping type | |
| Event type | |||||
| Event reason | |||||
| All navigational attributes : | |||||
| Organization | Source system | Source system | Source system | Source system | Source system |
| BFC GBU | BFC GBU | BFC GBU | BFC GBU | BFC GBU | |
| Plant | Plant | Plant | Plant | Plant | |
| Site (Plant C-PSite) | Site (Plant C-PSite) | Site (Plant C-PSite) | Site (Plant C-PSite) | Site (Plant C-PSite) | |
| Company code | Company code | Company code | Company code | Company code | |
| Shipment | Shipment number | Shipment number | Shipment number | Shipment number | |
| Departure country | Departure country | Departure country | Departure country | ||
| Destination country | Destination country | Destination country | Destination country | ||
| Forwarding agent | Forwarding agent | Forwarding agent | Forwarding agent | ||
| Transportation planning point | Transportation planning point | Transportation planning point | Transportation planning point | ||
| Actual Completion date | Actual Completion date | Actual Completion date | Actual Completion date | ||
| Actual completion date (Month) YYYY/MM | Actual completion date (Month) YYYY/MM | Actual completion date (Month) YYYY/MM | Actual completion date (Month) YYYY/MM | ||
| Actual completion date (Quarter) YYYY/Q | Actual completion date (Quarter) YYYY/Q | Actual completion date (Quarter) YYYY/Q | Actual completion date (Quarter) YYYY/Q | ||
| Actual completion date Year (YYYY) | Actual completion date Year (YYYY) | Actual completion date Year (YYYY) | Actual completion date Year (YYYY) | ||
| Actual date for Start of shipment | Actual date for Start of shipment | Actual date for Start of shipment | Actual date for Start of shipment | ||
| Planned shipment completion date | Planned shipment completion date | Planned shipment completion date | Planned shipment completion date | ||
| Planned shipment completion date (YYYY-MM) | |||||
| Shipment destination point | Shipment destination point | Shipment destination point | Shipment destination point | ||
| Shipment destination point type | Shipment destination point type | Shipment destination point type | Shipment destination point type | ||
| Shipment departure point | Shipment departure point | Shipment departure point | Shipment departure point | ||
| Shipment departure point type | Shipment departure point type | Shipment departure point type | Shipment departure point type | ||
| Route | Route | Route | |||
| Shipment packaging material | Shipment packaging material | Shipment packaging material | |||
| Shipment shipping type | Shipment shipping type | Shipment shipping type | |||
| Transportation mode | Transportation mode | Transportation mode | Transportation mode | Transportation mode | |
| Departure point - TR zone | |||||
| Departure point - Zip code | |||||
| Destination point TR zone | |||||
| Destination point Zip code | |||||
| Shipment Shipping line | Shipment Shipping line | ||||
| Shipment stage | Ship Stage sequence number | Ship Stage sequence number | Ship Stage sequence number | ||
| Ship stage departure point | Ship stage departure point | Ship stage departure point | |||
| Ship stage departure point type | Ship stage departure point type | Ship stage departure point type | |||
| Ship stage destination point | Ship stage destination point | Ship stage destination point | |||
| Shipment stage destination point type | Shipment stage destination point type | Shipment stage destination point type | |||
| Leg indicator | Leg indicator | Leg indicator | |||
| Delivery | Delivery | ||||
| Delivery Item | |||||
| Delivery distribution channel | |||||
| Material | |||||
| Material plant | |||||
| DG class | DG class | ||||
| UN number | UN number | ||||
| 3rd Party | 3rd Party | ||||
| 3rd Party type | 3rd Party type | ||||
| 3rd partry - TRzone | |||||
| 3rd party - Location | |||||
| 3rd party - Zip code | |||||
| Transportation group (Bulk / Packed) | Transportation group (Bulk / Packed) | ||||
| Transportation group detail | Transportation group detail | ||||
| Material hierarchy | Material hierarchy | ||||
| Shipment x delivery | Shipping condition | Shipping condition | Shipping condition | ||
| Shipment cost item | Shipment cost number | Shipment cost number | |||
| Item number | Item number | ||||
| Service agent | Service agent | ||||
| Shipment cost item category | Shipment cost item category | ||||
| Shipment cost posting date | Shipment cost posting date | ||||
| Shipment cost posting date - Month (YYYY/MM) | Shipment cost posting date - Month (YYYY/MM) | ||||
| PO Number | |||||
| Invoice Number | |||||
| Cost condition | Condition type | Condition type | |||
| Event | Event actual start date (day) | ||||
| Event actual end date (day) |
For more details about each query please click in following link: TIERS: Reporting Solution
Broadcast
- None
Maintenance
Known bugs
- Shipment conditions deleted in ERP (WP1 & PF1) sometimes are not deleted in BW, because the extractor is generic based on a view, so the delta is not possible because several lines can be changed at the same time. When the shipment cost document is deleted in ERP, in this case the shipment condition is deleted in BW.
- The shipment condition value is not correctly linked with currency when these is more than 1 currency. The extractor DTS_TRKONV extracts data from ERP table KONV and the currency is not aligned correctly in this table. Solution proposed is to take the currency from shipment cost, that is aligned with shipment condition value.
- Sometimes the unit conversion is not done in query due the unit is not mapped correctly in table UOMCMAT2 by material.
Recurring procedure
- When the process chain fails, the process type must be analyzed and repeated.
- Sometimes a full load by period is required by user in order to syncronize all transportation data.
Planned Evolution
- Most part of enhancements in standard extractors should be removed in future in order to obtain a better performance.
- The old transportation flow (CUB_TR001, CUB_TR002, CUB_TR005, CUB_TR006, CUB_TR007, CUB_TR008) will be deleted and removed from schedule in 2016.
- Some broadcasts existed in old transportation flow should be developed in new TIERS.
Useful transactions to be used for checking data
Transaction | Description | Corresponding table | Comments |
|---|---|---|---|
| VT03N | Shipments | VTTK, VTTS | in ERP |
| VI03 | Shipment Costs | VFKK, VFKP | in ERP |
| VL03N | Deliveries | LIKP, LIPS | in ERP |
| VA03 | Sales Orders | VBAK, VBAP | in ERP |
| ME23N | Purchase Orders | EKKO, EKPO, EKBE | in ERP |
| RSUOM | Unit conversion | T005 | in BW |
| RSCUR | Currency conversion | TCURR | in BW |
https://wiki.solvay.com/display/TECHREP/BW+Authorizations?src=contextnavpagetreemode