General presentation

Objective of the application


Manufacturing VC query (QV_BW_QRY_CPCOPC04_0001) is one of the components to calculate the FL ICM (Forward-looking Integrated Contribution Margin).

It combines BOM data for Actuals + Forecast.

The BOM (Bill of Material) brings the detailed costs for each component (down to raw material/activity) for each Finished Product/Plant.

The Variable Cost of a product is made up of Raw Materials + Packaging + Tolling + Utilities costs.

For projected months, we use forecasted prices for Raw Material and Energy (collected in the respective BI-IP workbooks) and multiply by the quantities from the BOM. If forecast prices are not found, we extrapolate from Actual last prices to calculate the FL Variable Cost.


Tool Leader + IT leader of the application: 

Usage information

History

Roles & Access

Roles and access

List of application role + menu role  and explanation if we have several applications role with specials rules.

Role CodeRole DescriptionExplanation
ZR_RCS_CA_M83Forward Looking ICM - ManufacturingRole Menu
ZBI_RCS_CO_A09Forward Looking ICM - ManufacturingAuthorization objects



Authorization variables

List of authorization variables mandatory for the application.

Authorization variablesObject
V_CPFCTR1_2_0006CPFCTR1_2
V_C_PLANT_0012C_PLANT
V_C_AUTHMA_0001C_PLANT__C_AUTHMA

Dataflow overview


BOM is loaded from WP1 and PF1 in different data flows.

There are 2 different BOM queries:

  • QV_BW_QRY_CPCOBOM1_0001 - for WP1 GBUs (for example Novecare)
  • QV_BW_QRY_CPCOBOM2_0001 - for PF1 GBUs (for example Specialty Polymers)


You can find the dimensions of each query here:


You can find FL-ICM overall architecture here:



Functional and Technical rules on Workbench + Reporting

Rules & Explanations


Novecare (in WP1) works with Standard Cost.

So beginning of month M, we have the cost for month M.


Specialty Polymers (in PF1) works with Actual Cost.

So beginning of month M, we have the cost for month M-1 (last closed month).


In order to have a common view, for a unique Running Period, this is the way we generate data in Manufacturing Cost query.


Note that for Novecare (WP1), there is a month lag in the Forecast price for the projected months.

We can only filter a single period to read BOM data, so in each CV, Run Period is calculated differently:


CV_FMCO_MAN_COST_RCS (WP1)

RUNPER is equal to FISCPER used to extract BOM


CV_FMCO_MAN_COST (PF1)

RUNPER = FISCPER from DTP +1


For example: to generate RUNPER 03/2022


DTP from WP1 with  FISCPER = 03/2022 (to extract BOM data from 03/2022)

CV will generate RUNPER 03/2022.


DTP from PF1 with FISCPER = 02/2022 (to extract BOM data from 02/2022)

CV will generate RUNPER 03/2022.

Dependencies with other applications

Data loadings

Info providers and objects loaded


Process chain PC_COPC_10 scheduled monthly on CD7

Loading frequency

Monthly on Day + 7

Average performance


Key FigureEstimation
~ Average Process Chain Runtime
~ Average nb of rows loaded per load
~ Total nb of rows loaded (if full)
~ Average Runtime for 10k lines

Record Keeping

Reporting

Main queries

Manufacturing Unit Cost query : QV_BW_QRY_CPCOPC04_0001

Main functionalities

It combines BOM (Bill of Material) data for Actuals + Raw Material Forecast.


Global properties


Variables

Definitions

Variable Name

Info-object

Selection Type

Required

Description/Explanation

0I_CALMO0CALMONTHIntervalNoCalendar Year/Month
V_C_PLANT_0012C_PLANTAuthorization with InputNoPlant
V_CPFCTR1_2_0006CPFCTR1_2Authorization with InputNoGlobal business Unit
V_C_MATNR2_0001C_MATNR2Select OptionNoRaw Material
V_C_AUTHMA_0001C_AUTHMAAuthorizationNoAuthorization Scope
V_0CALMONTH_0062C_RUNPERIntervalNoRun Period

Variable Sequence

Filters

Key figures

Characteristics

Broadcast