You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

General presentation

Objective of the application


Manufacturing Unit Cost query (QV_BW_QRY_CPCOPC04_0001) is one of the components to calculate the FL ICM.

It combines BOM (Bill of Material) data for Actuals + Raw Material Forecast.

The BOM brings the breakdown of the Variable Cost (Raw Materials, Packaging, Tolling and Utilities).

For projected months, if forecast prices are not found for a raw material, the query extrapolates the costs from Actuals.

Latest update from Raw Material Forecast does the extrapolation of the unconfirmed prices, from the first previous confirmed price.

Therefore Manufacturing extrapolation with Actuals is only done now for prices not forecasted in the first months of the projection.


Tool Leader + IT leader of the application: 

Usage information

History

Roles & Access

Roles and access

List of application role + menu role  and explanation if we have several applications role with specials rules.

Role CodeRole DescriptionExplanation









Authorization objects

List of autorisation objects mandatory for the application.

Authorization objectExplanation
C_AUTHMAAuthorization Scope




Dataflow overview


BOM is loaded from WP1 and PF1 in different data flows.

There are 2 different queries:

  • QV_BW_QRY_CPCOBOM1_0001 - for WP1 GBUs (eg Novecare)
  • QV_BW_QRY_CPCOBOM2_0001 - for PF1 GBUs (eg Specialty Polymers)


WP1 data flow is a replication of the solution used by Novecare before.

PF1 data flow is totally new and relies on a custom table (ZCO_PRICE_RM) populated in PF1.

Calculation view CV_FMCO_BOM was created to harmonize BOM data from both sources.


Then Manufacturing Cost is loaded in ABCOPC06


A new flow has been added from Raw Material object ABCOPC01 directly to Manufacturing object ABCOPC06, in order to load Non BOM products which are excluded through Calculation Views and the inner join with BOM.

Functional and Technical rules on Workbench + Reporting

Rules & Explanations


Novecare (WP1) works with Standard Cost.

So beginning of month M, we have the cost for month M.


SpP (PF1) works with Actual Cost.

So beginning of month M, we have the cost for month M-1 (last closed month).


In order to have a common view, for a unique Running Period, this is the way we generate data in Manufacturing Cost query.


We can only filter a single period to read BOM data, so in each CV, Run Period is calculated differently:


CV_FMCO_MAN_COST_RCS (WP1)

RUNPER is equal to FISCPER used to extract BOM


CV_FMCO_MAN_COST (PF1)

RUNPER = FISCPER from DTP +1


For example: to generate RUNPER 03/2022


Run DTP from WP1 with  FISCPER = 03/2022 (to extract BOM data from 03/2022)

CV will generate RUNPER 03/2022.


Run DTP from PF1 with FISCPER = 02/2022 (to extract BOM data from 02/2022)

CV will generate RUNPER 03/2022.

Dependencies with other applications

Data loadings

Info providers and objects loaded


Process chain PC_COPC_10 scheduled monthly on CD7

Loading frequency

Monthly on Day + 7

Average performance


Key FigureEstimation
~ Average Process Chain Runtime
~ Average nb of rows loaded per load
~ Total nb of rows loaded (if full)
~ Average Runtime for 10k lines

Record Keeping

Reporting

Main queries

Manufacturing Unit Cost query : QV_BW_QRY_CPCOPC04_0001

Main functionalities

It combines BOM (Bill of Material) data for Actuals + Raw Material Forecast.


Global properties


Variables

Definitions

Variable Name

Info-object

Selection Type

Required

Description/Explanation

CALMONT20CALMONTHIntervalYesCalendar Year/Month
C_PLANT02C_PLANTSelect OptionNoPlant
CPFCTR1_2_0001CPFCTR1_2Select OptionNoGlobal business Unit
V_C_MATNR2_0001C_MATNR2Select OptionNoRaw Material
V_C_AUTHMA_0001C_AUTHMAAuthorizationYesAuthorization Scope
V_0CALMONTH_0062C_RUNPERIntervalNoRun Period

Variable Sequence

Filters


Key figures


Characteristics


Broadcast

Maintenance

Known bugs

Recurring procedure

Planned Evolution


  • No labels