Page tree


1.0 Overview



Business Context and Application Overview

Within Solvay, Corporate Business Services- Function cost application is a part of the Finance domain and uses data from various systems such as SAP systems, data from Cost Centers, Orders and WBS (SAP PS).

The Corporate Business Services are activities which combine or consolidate certain enterprise-wide needed support services, provided based on specialised knowledge, best practices, and technology to serve internal (and sometimes external) customers and business partners.

This Function is split in 4 parts:

  • Corporate (not re-invoiced)
  • Function services (re-invoiced and under guarantee)
  • R&D and engineering projects
  • Interco flows - It allows the identification of inter-company billing at company level


Application User Profile

For this Application the access is provided based on the BW menu "CBS - Function Costs" and it's done via Service one.

Fill the form
https://solvay-dwp.onbmc.com/dwp/app/#/itemprofile/622 

In SAP system select the "WBP - BW Business Warehouse" 

In WBP - BW Business Warehouse : Select the Business Role select the "CBS - Function Costs"

Target Users:

Users of this application include Corporate Controlling Controllers, Function Controllers, Plant Controller, Accountants and GBU controller

VERSION

DATE

MODIFIED BY 

DESCRIPTION

0.01

15.09.2023

Inês Vilares

Initial draft









Application Type


Data Product Type 
  • Dashboard
  • Report
  • Advanced analytics
  • AI 
  • Others <specify which one>
Technologies
  • BW
  • Tableau
  • Qliksense
  • Talend
  • Dataiku
  • Others <specify which one>

Data Sources 

Note: list of all applications and various environment

  • SAP PF1 (Production environment)
  • SAP WP1
  • SAP PI1
  • BW (versions)
  • iCare CRM 
  • CORE CRM
  • Others <specify the name of the source> 
  • Cytec Flatfile

2.0 Business Process


To understand the business process it's important to know the basic concept for the SAP CO module and how it's applicable in Solvay organization. 

The SAP CO module in the SAP ERP (Enterprise Resource Planning) system focus on financial controlling and management accounting functions within an organization. SAP CO is designed to provide tools and capabilities to effectively manage and control costs, perform internal and external accounting, and support decision-making processes related to financial aspects of the business. SAP CO is tightly integrated with other SAP modules, such as SAP FI (Financial Accounting) and SAP MM (Materials Management), providing a cohesive and comprehensive solution for managing financial data, controlling costs, and supporting financial decision-making throughout the organization.


CO Structure in Solvay:

PF1 Structure


CodeDescription
Operating concernFO01 Slv ERP Operating concer
Controlling areaCHEFERP SOLVAY

WP1 Structure


CodeDescription
Operating concernZ001 Solvay Engin.Plasti.Polan
Z006 Rhodia Europe
Z013Rhodia Europe
Z025Rhodia Latin America
Z026Rhodia Asia Pacific
Z028Solvay North America
Controlling area= Operating concern



Overview of the business process for CBS functions costs

For the CBS function costs we use the SAP information from the controlling part. For this it's important to understand the structure behind and how the business see the costs and be able to analyze the information to perform their activities during and end of month.


Model behind for PF1 and WP1:

Curently we have the WBS, cost centers and orders objects with values coming from the purchase orders and accounting entries. Each object is linked to a cost center which we call it "Responsible Cost Center" and this cost center is linked to a GBU. 

We have the primary postings and during the closing process we have the settlements cycles (which will allocate the costs to a final cost center) and the final cost centers has the correspondent cost element for COPA line items to be present in the P&L report for PF1 and WP1 using the respective value field. 


Reporting fixed costs challenges : reconciliation SAP/BFC:

In the controlling side we have primary posting in the CO objects for the fixed costs and during the closing we have the settlement cycles to transfer/allocate the costs to a final CO object and to be in the respective lines in P&L.


3.0 Application Feature Overview


For this scope we are using queries instead of workbooks. See below all the queries available:

1 - Solvay Group Fixed Costs

ReportsDefinitionPromptsBW Workbook QueryQuery Technical Name

CBS - Functions - during month (Core query)

In the report we can analyze the costs posted on function cost centers and CO objects with function CC as responsible CC for a specific period.

  • No categorization of costs
  • Highest level of detail: partner CO object
  • The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)

Default filters:

1 Organization

  • ZCBS-CORPO
  • ZCBS-FUNCT
  • ZCBS-PROJ

Mandatory:

  • Period/Fiscal Year.

Optional:

  • Auth Scope on Company Code;
  • 1 Organization;
  • GBU Function;
  • Function Grouping;
  • Function;
  • 3 Sub-funct Grouping;
  • 4 Sub-function;
  • Company Code;
  • Prompt Currency.
N.ABW_QRY_MPR_FC001_0003

CBS - Functions - end of month (Core query)

In the report we can analyze the costs posted on function cost centers only for a certain period or periods after the settlements for the analysis on a end of month perspective.

  • Categorization of costs following the structure described in the section ““Synthesis” & “Function – end of month”  report”.
  • Highest level of detail: partner CO object
  • The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)

Default filters:

1 Organization

  • ZCBS-CORPO
  • ZCBS-FUNCT
  • ZCBS-PROJ

Mandatory:

  • Period/Fiscal Year.

Optional:

  • Auth Scope on Company Code;
  • 1 Organization;
  • GBU Function;
  • Function Grouping;
  • 3 Sub-funct Grouping;
  • 4 Sub-function;
  • Function;
  • Company Code;
  • Prompt Currency.
N.ABW_QRY_MPR_FC001_0001 

CBS - Functions by Companies - during month (Core query)

In the report we can analyze the costs posted on function cost centers and CO objects with function CC as responsible CC for a specific period. Used more as a local reporting.

  • No categorization of costs
  • Highest level of detail: partner CO object
  • The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)
  • Same layout as “Functions – During the month”

Default filters:

1 Organization

  • ZCBS-CORPO
  • ZCBS-FUNCT
  • ZCBS-PROJ

Mandatory:

  • Period/Fiscal Year.

Optional:

  • Auth Scope on Company Code;
  • 1 Organization;
  • GBU Function;
  • Function Grouping;
  • Function;
  • 3 Sub-funct Grouping;
  • 4 Sub-function;
  • Company Code;
  • Prompt Currency.
N.ABW_QRY_MPR_FC001_0004

CBS - Functions by Companies - end of month (Core query)

In the report we can analyze the costs posted on function cost centers only for a certain period or periods. Used more as a local reporting.

  • No categorization of costs
  • Highest level of detail: partner CO object
  • The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)

Default filters:

1 Organization

  • ZCBS-CORPO
  • ZCBS-FUNCT
  • ZCBS-PROJ

Mandatory:

  • Period/Fiscal Year.

Optional:

  • Auth Scope on Company Code;
  • 1 Organization;
  • GBU Function;
  • Function Grouping;
  • Function;
  • 3 Sub-funct Grouping;
  • 4 Sub-function;
  • Company Code;
  • Prompt Currency.
N.ABW_QRY_MPR_FC001_0002

CBS - Synthesis of the Functions (Core query)

In the report we can analyze the costs posted on function cost centers only for a certain period or periods.

  • Categorization of costs following the structure described in the section ““Synthesis” & “Function – end of month”  report”.
  • Highest level of detail: cost center x cost element
  • The sign of the amount is seen from the function cost center ( +: costs increase / -: costs decrease)

Default filters:

1 Organization

  • ZCBS-CORPO
  • ZCBS-FUNCT
  • ZCBS-PROJ

Mandatory:

  • Period/Fiscal Year.

Optional:

  • Auth Scope on Company Code;
  • 1 Organization;
  • GBU Function;
  • Function Grouping;
  • Function;
  • 3 Sub-funct Grouping;
  • 4 Sub-function;
  • Company Code;
  • Prompt Currency.
N.ABW_QRY_MPR_FC001_0005


2 - Solvay Group detailed Fixed Costs

ReportsDefinitionPromptsBW Workbook QueryQuery Technical Name

BW - Detail costs by Orders - Rhodia (Core query)

The report is for Rhodia companies scope and show the costs for the selected order and all the details as partner cost center, partner activity, partner WBS element, partner order, CO document number and CO document line item for different periods in Amount (EUR) and Amount in Company Currency.

Mandatory:

  • Order.

Optional:

  • Prompt Currency;
  • Auth Scope on Company Code;
N.ABW_QRY_MPR_FC002_0001

BW - Detail costs by Orders - Solvay (Core query)

The report is the same as "BW - Detail costs by Orders - Rhodia (Core query)" but the scope is for Solvay companies.

Mandatory:

  • Order.

Optional:

  • Prompt Currency;
  • Auth Scope on Company Code;
N.ABW_QRY_MPR_FC002_0002 

BW - Detail costs by WBS Elements - Rhodia (Core query)

The report is for Rhodia companies scope and show the costs for the selected WBS Element and all the details as compay code, partner cost center, partner WBS element, partner order, CO document number and CO document line item for last closing period in Amount (EUR) and Amount in Company Currency.

Mandatory:

  • WBS Element.

Optional:

  • Prompt Currency;
N.ABW_QRY_MPR_FC002_0003

BW - Detail costs by WBS Elements - Solvay (Core query)

The report is the same as "BW - Detail costs by WBS Elements - Rhodia (Core query)" but the scope is for Solvay companies.


Mandatory:

  • WBS Element.

Optional:

  • Prompt Currency;
  • Auth Scope on Company Code;
N.ABW_QRY_MPR_FC002_0004

4.0 Functional Specification


4.1 General Data/Calculations 


For these reports, it’s important to understand some general concepts which are transversal to all the reports which allows the users to work with the reports in the same way as the SAP system and BFC tool.
Cost Center

A cost center is a specific organizational unit within a company that is responsible for incurring costs. It represents a location, department, or function where expenses are generated. Cost centers are used for tracking and controlling costs, allocating expenses, and monitoring budget compliance.

Responsible Cost Center

A responsible cost center is a subcategory of a cost center that is responsible for specific cost incurrences within the main cost center. It allows for more detailed tracking and allocation of costs within a broader cost center. Responsible cost centers help organizations drill down into expenses for greater accuracy in cost analysis and control.

Responsible Cost center is : 
-    the cost center linked to the Order and WBS of the line item (CO-OM, PS)
-    the cost center of the line item for CO-CCA 

Cost elementIt's a categorization used to track and classify expenses incurred by an organization. It represents a specific type of cost, such as wages, materials, rent, or utilities, and serves as a fundamental building block for cost accounting and reporting. Cost elements are essential for allocating and analyzing costs within the SAP CO module. It's the P&L account used to post the amounts in SAP CO document. 
PlantRefers to a specific physical location or facility within a company's organizational structure. 
Cost Center HierarchyRefers to a structured arrangement or organization of cost centers within a company. It establishes a hierarchical relationship among cost centers, typically based on their functions, responsibilities, or reporting structures. This hierarchy helps in organizing and managing cost centers efficiently for accounting, budgeting, and reporting purposes, allowing for better control and analysis of costs across the organization.

4.2 Process Detail 

4.2.1.  Report/Process Definition 

DomainFinance
ApplicationBW reports under CBS - Function Costs folder (queries option)
ProviderMPR_FC001 and MPR_FC002.

For the CBS function costs application we have the PF1 and WP1 systems and we are using the main CO objects cost centers, WBS and orders and with this information extracted we the data is splitted in two BW tools one side the GBU fixed costs and the other solution is CBS for the functions (For the GBU fixed costs scope the explanation it is in the "GBU Fixed Costs application"). For both applications we use the same data base and the same cubes but the multiproviders are different also because of the authorization part.

SAP BW High Level View 

To see the data from the source systems see below how the information is organized in the BW perspective: 


Hierarchy 

The below costs are included in the Corporate Business:

  • Actual costs only: Statistical costs are not taken into account
  • IFRS rules only: Costs posted using local gaap accounts are excluded (Brazilian entities)
  • Costs posted on CBS (Corporate Business Services) cost centers (directly or through orders or WBS). It corresponds to the cost centers included in the following groups of the cost centers hierarchy ZCBS
    • ZCBS-CORPO = Corporate
    • ZCBS-FUNCT = Function services
    • ZCBS-PROJ =Projects
    • ZCBS-ICO = Interco
  • Costs are organized with the cost elements group ZRCS-FC
  • Inter-company re-invoiced function service costs should be posted on cost centers of the group ZCBS-ICO

In SAP using the transaction KSH3 - Display cost center hierarchy 

In the Cost Element Hierarchy from 01 Jan 2022 the Cost Element Group ZRCS-FC it was replaced by the Cost Element Group ZSOLV. In the reports we have information for the ZSOLV group but the reports are still working for the filters and key figures with the old group. Discussions are on going to see the best solution to have the reports adapted with the new group ZSOLV. 


Restrictions 

To determine CBS Fixed Costs perimeters, there is restrictions on: 

  • Cost center
  • Cost element
  • Miscellaneous filters 

In CBS application the CBS hierarchy for PF1 and WP1 systems in BW was denormalized (levels of the hierarchy are translated as attributes of cost center and responsible cost center):


Cost centers hierarchy/restriction for this scope:

  • All cost centers included in the groups ZCBS-CORPO Corporate Function & ZCBS-FUNCT FUNCTION SERVICES are assigned to the Activity 1 CBSS in WP1 (=IECRA00569) or 50 in PF1.
  • Cost centers included in the group ZCBS-ICO INTERCOMPANIES are assigned to the Activity 1 CBSS in WP1 (=IECRA01148) or 50 in PF1.

  • All cost centers included in the group ZCBS-PROJ SERVICES PROJECTS (OUT OF GUARANTEE) are assigned to the Activity 1 NBDD (=IECRA00554) in WP1 or 89 in PF1.

  • All cost centers  included in the group ZCBS-OTH CBS NON FUNCTION COSTS are assigned to the Activity 1 CBNR (=IECRA00450) in WP1 or 59 in PF1

The sub-group:

  • ZCBS-OTH5 CBS NON FUNCTION COSTS - Scope F2G is used in the frame of the project F2G to manage the Co$ta - Anaplan & F2G Scope
  • ZCBS-OTHPO CBS NON FUNCTION COSTS - Scope PO2 was created in the frame of the project Power of 2 to follow-up the costs of the project

Restriction on cost element: 

In the cost element BW object the cost element hierarchy was denormalized (levels of the hierarchy are translated as attributes of cost element).

By default we must excluded some “Fixed cost group “  attributes values in the reports. The users can delete these default filters.


Cost element hierarchy ZRCS-FC : restrictions:

Miscellaneous filters:

Order Type : we exluded (investment) :

  • ZPM4
  • ZPM6

Project Type we exluded (investment) :

  • II
  • FD

Value type

  • 10- Real
  • 20-plan

Currency type

  • 10 company code currency 

Function cost tracking reports 

Design

5 queries available, corresponding to 2 approaches

  • Point of entry : function(s) or company(ies)
  • End of month (final settlement on function CC) or During the month (link to function CC before settlement)


End of MonthDuring the Month


to be used for reporting after the closing when all costs posted in orders are settled on CBS cost centersto be used during the month when orders are not yet settled
By Function

function controlling

BW_QRY_MPR_FC001_001 (star)

BW_QRY_MPR_FC001_005

BW_QRY_MPR_FC001_003
corporate controlling

By companylocal controllingBW_QRY_MPR_FC001_002 (star) (star)BW_QRY_MPR_FC001_004

(star) BW_QRY_MPR_FC001_001         CBS Functions - end of month => for reporting to corporate controlling

(star) (star) BW_QRY_MPR_FC001_002     CBS Functions by companies => for reconciliation FC vs BW

Possibility to analyze a “one-level-up” cost cascade

Data

  • CO documents: actual costs in local currency + report in other currency with BFC exchange rate
  • Entries on Cost Centers, Orders and WBS elements
  • Postings to COPA & Local Gaap cost elements are excluded

“Synthesis” & “Function – end of month” reports  

Additional axis : Structure with 6 categories


Category

Definition

Example

(1)

Gross

All costs excluding depreciation before any deduction (sales, capitalization, etc…)

all labour costs + travel + services + …

(2)

Depreciation

Postings with depreciation cost elements

depreciation costs

(3)

Sales

postings with sales cost elements (excluding capitalization) + postings with all other cost elements linked to Invoicing WBS element (partners with object class “Profitability Analysis”)

activity (man Hr) posted on invoicing WBS
-> time spent on IT project reinvoiced to customer

(4)

Costs going to be capitalized

postings linked to Investment WBS or Orders (partners with object class “Investment”)

activity (man Hr) posted on investment WBS
-> time spent on IT project for development phase

(5)

Cost transferred (star)

Credits from overheads CC WBS IO (partners with  class object “Overheads” - excluding sales cost elements)

activity (man Hr) posted on overhead WBS
-> time spent on IT project for training phase


Net Function

Balance of the cost center

(1) + (2) - (3) - (4) - (5)


(star) postings on function CC from WBS or internal order settlement are classified in Gross



Characteristics available in CBS reports 

Characteristics


SynthesisFunctions - End of monthFunctions by Companies - End of MonthReports - During Month

0 – Hierarchy

Level 0 of ZCBS hierarchy

X

X

X

X

1 – Organization

Level 1 of ZCBS hierarchy

X

X

X

X

2 – Function

Level 2 of ZCBS hierarchy

X

X

X

X

3 – Sub-Funct Group

Level 3 of ZCBS hierarchy

X

X

X

X

4 – Sub-Function

Level 4 of ZCBS hierarchy

X

X

X

X

Controlling area

Controlling area of the function CC

X

X

X

X

Company

Company of the function CC

X

X

X

X

Country

Country of the company

X

X

X

X

Geographical zone

Zone to which the country is attached

X

X

X

X

Cost center

Function cost center

X

X

X

X

Fixed Cost Group 1

Level 2 of ZRCS-FC hierarchy

X

X

X

X

Fixed Cost Group 2

Level 3 of ZRCS-FC hierarchy

X

X

X

X

Fixed Cost Group 3

Level 4 of ZRCS-FC hierarchy

X

X

X

X

Cost Element

Cost element used to post function costs

X

X

X

X

Partner Cost Center

Cost center with which the function CC exchanges costs (credit or debit)


X

X

X

Partner Activity Type

Type of activity used to transfer costs to the function CC from a partner CC


X

X

X

Partner WBS element

WBS with which the function CC exchanges costs (credit or debit/Posting or settlement )


X

X

X

Partner Order

order with which the function CC exchanges costs (credit or debit/Posting or settlement )


X

X

X

Partner Vendor

Vendor in purchase flows


X

X


Sender / Receiver

indicator that identifies the direction of the posting


X

X

X

Responsible Cost Center

Function CC responsible of an order or a WBS element




X

WBS element

WBS element with a function CC as a responsible CC




X

Order

Order with a function CC as a responsible CC




X

Cost Structure

slide ““Synthesis” & “Function – end of month”  reports

X

X




Cytect case for Non-ERP 

Cytec transaction in CBS was developped for cytec and after used to load non erp data (no new data was loaded from 2020).


CBS - Function costs - Troubleshooting

On , some users of the application CBS - Function costs were not able to refresh their personnal workbook created with the query BW_QRY_MPR_FC001_0001 CBS - Functions - end of month (Core query)

You can find below how this issue can be solved.



Step 1 - Add the authorization scope in the prompt 

Reminder

=> After  you must fill the authorization scope with SOLVAY, # or any others (ACETOW, BUTACHIMIE etc.)

Problem

When the workbook is refreshed, there is no more data

Solution

Open the prompt 

  1. You can delete the long list of Company codes by clicking 
  2. The field "Auth Scope on Company Code" can not remain blank

  1. Once the list of company codes is deleted, you have to enter the list of company codes, you want to display or enter  # to display all company codes you have access
  2. Enter the Auth Scope = SOLVAY and click  to enter (star)

(star) Obviously when you work for a Non-Solvay company or a company with restricted accesses (ex: Butachimie), you must fill the scope accordingly (ex: ACETOW, INDUPA etc.)



Step 2 - Specific update for personnal workbooks using the query BW_QRY_MPR_FC001_0001 CBS - Functions - end of month (Core query) 

Once the issue coming from the authorization scope is solved, you can face a second issue described below:

Problem

When the workbook is refreshed, there is only the column headings. 

Solution

  1. Go to the tab "Analysis"
  2. Click "Display" to open the design panel
  3. Drag and drop the structure from Data source pane to the "Raws" or "Columns" pane depending on how it used to be.  

Everything should be back to normal. If you have followed the procedure and there is still no data in your workbook, you may contact the Contact SBS Support..



Frequently Asked Questions 

How do I know my workbook is based on the query BW_QRY_MPR_FC001_0001 ? 

Go to the design panel and open the tab "information". In the pane "Information", you will see the name of the query used. 



Is it a one time event or can these issues happen again  ?

These issues should not happen again: 

  • Once the authorization scope is filled, there is no need to update it anymore
  • The disappearance of the "structure" is also a one time event and only happened in the query BW_QRY_MRP_FC001_0001. It is an error that was not detected when a developpment was transported from the developpment environnement to the production environnement impacting the query BW_QRY_MRP_FC001_0001 only. 



What can I do if after having followed the procedure, my workbook is not fixed ?

If you have followed the procedure and there is still no data in your workbook, you may contact the Contact SBS Support..



5.0 Non-functional Descriptions 


5.1 Usability

5.2 Regulatory Compliance

5.3 Security

5.4 Performance

5.5 Reliability

5.6 Scalability

5.7 Compatibility

5.8 Availability

5.9 Refresh of the Data

The loading it's the same logic as for GBU fixed costs since the use the same data base: 

Closing Time:

Outside of Closing: it's one time on a daily basis.