This indicator explores the time taken to confirm an order in SAP by comparing the order line creation date and the confirmation date. The target is to be less than 48 hrs (=< 2 business days).
It measures also a "Stability" : did we change the first confirmation date afterwards ? how many times.
Scope:
    • Deleted order lines are excluded
    • Order lines with a “Reason for rejection” have been excluded, except for the WP1 reason "98 - Incompleted delivery, tb closed-not OTIF".
    • Filter on Sales Order Types, same as OTIF scope

Business day: We take into account server location: Week ends and Belgian holidays excluded.
Process of order promissing:

Promising Split: Each order line is categorized in 5 possible Confirmation Status. We are supposed to confirm an order line within 2 business days. In this case, we are good, otherwise, we failed.
Good < 2 days
Order line was confirmed  =< 2 business days
Failed 3-9 days
Order line confirmation date is  between 3 and 9 business days after the creation date
Failed 10-30 days
Order line confirmation date is  between 10 and 30 business days
Failed > 30 days
Order line confirmation date is more than 30 business days
Failed with allocation
  • For WP1: if order line has failed to be confirmed within 2 business days and has ever had ZPEN flag on order line level (supply issue)
  • For PF1: there is no common process, therefore this category is not defined for PF1 GBUs
See all definitions and rules here
Key figuresCalculation
Order Promising ratio
# of GOOD confirmed <= 2 business day
——————————————————————

# total orders lines
Confirmed within 2 business days
Order Promising Cycle Time
Number of business days between Order line creation date and the first ATP confirmation date
  • In case of credit block the KPI measures: Number of business days between the first credit release  and the 1st ATP confirmation date
  • If the order hasn’t been confirmed yet we calculate number of business days with today’s date
  • When we don’t have the order confirmation date and the good issue is done then we consider that the order was immediatly confirmed. Fisrt confirmation date = Orderline confirmation date
Failed Orders
Total of orders with a Failed Confirmation Status
# of Confirmations
Count how many times the order has been confirmed in the change log (after quantity or requested date change) 
If the order line was confirmed immediately and there is no confirmation in the change log, then count as 1 confirmation and use order line creation date in cycle time.
Stability
Stable Y = 1 confirmation  
Stable N = more than 1 confirmation
No GI date = if the order has no GI date, it is considered not possible to calculate the KPI
Reference Date
For the KPI % Order Promising and the Cycle Time the  reference date is Order Line Creation date. Order lines are taken into consideration as soon as they are entered in the system. (data load delay of 1 day, night batch)
First Confirmation Date
  • For WP1: First Confirmed quantity date from Change Log. If there is no change in the quantity in the change log and the order line has been delivered, BW takes the order line creation date assuming that the order was confirmed immediately.
  • For PF1: BW uses a dedicated field ZZERDAT "1st committed delivery date"

Target Users

  • Supply Chain Managers
  • Supply Chain Operational
  • Supply Chain Excellence
  • Logistics
  • Customer Service
  • Account Managers

Authorization & Rights

All the accesses must be validated by:
The GBU representative or Supply Chain Excellence
Click here for the Access form to get access to the Global Supply Chain Dashboard.
Technical Documentation
Source:
CORE -  BW_QRY_CPSDCH01_0001
QlikView - QV_BW_QRY_CPSDCH01_0001
Update: Daily
Material types:
  • PF1/Z703 
  • WP1/ZDIE WP1/ZVER WP1/ZUNB 


Dimensions: Global Overview of Dimensions




Order Promising
Global Filters
Period
Date
[C_ITM_SD__C_CDATE2] Order line creation date
Organization
GBU
BFC GBU [CPFCTR1_2]
Group of Activity
BFC Group of activ C_SUBACT2__CPFCTR2_2
Sub-Activity
BFC Activity 1 C_SUBACT2__C_MAGNITU
Company
[C_COMPCDE] Company_code
Plant
Zone
Geographie/Zone [C_PLANT] Plant\Attributes\[C_GZONE]
Country
Country key [C_PLANT] Plant\Attributes\[0COUNTRY]
Corporate Group
Ship-to Corporate group [C_SHIPTID__C_CORPGR]
Plant
Plant [C_PLANT]
Ship Destination
Zone
Geographie/Zone [C_SHIPTID__C_GZONE]
Country
Ship-to Country [C_SHIPTID__C_0COUNTRY]
Ship Destination
Ship-to [C_SHIPTID]
Product
Product Hierarchy
Prod.hierarchy [C_MATNR2__0PROD_HIER]
Product
Com Prod / Mat Grp [C_MATNR2__C_PROD]
Bulk/Packed
Transportation Group [C_MATNR2] Material\Attributes\[C_BULKPAC]
Transport Mode
Transportation mode [C_SHIPCD2__C_TR_MODE]
Specific Filters

Sales Office
Sales Office [C_SAL_OFF]
Packaging Type
Packaging type [C_MATNR2] Material\Attributes\[C_PACKAG]
Customer Rep/ ZI Partner
CSR (Sold-to) [C_CUSTSAL__C_ZIPART]
Value Stream
Value Stream [C_MATPNT2__C_VALSTR]