The purpose of this document is to define the conversion approach to create Maintenance Strategy in S/4 HANA.

Legacy Plant Maintenance Maintenance Strategy is using a diverse range of formats across the different systems. There are instances where the same Maintenance Strategy is duplicated within and across sources, with informal words. This results in data inconsistency. As per SyWay design, Maintenance Strategy will be standardized.


Conversion Scope

The scope of this document covers the approach for converting active Maintenance Strategy from Legacy Source Systems into S/4HANA following the Maintenance Strategy Master Data Design Standard.


The data from legacy system includes:

  1. All legacy strategies & packages assigned to valid legacy

    • strategy Task Lists
    • Maintenance Items

The data from legacy system excludes:

  1. All legacy strategies & packages NOT assigned to any valid legacy
    • strategy Task Lists
    • Maintenance Items


List of source systems and approximate number of records 

SourceScope

Source Approx No. of Records

Target SystemTarget Approx No. of Records

PF2, WP2

An initial extract will be provided to business to evaluate.

Additional data/records may be required and these will be constructed via DCT.

Enrichment of in-scope data may be required and will be added via transformation rules (business/technical).

352

S/4HANA

352

Additional Information

Multi-language Requirement

Maintenance Strategy description will be made available in English.
Multi language is supported for Maintenance Strategy. Login via a different language will have its description displayed in the logon language if the language key is maintained in the Maintenance Strategy.

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
T351STRATSTRATMaintenance StrategyCHAR6(0)
T351TSPRASSPRASLanguage KeyLANG1(0)Config Table: T002
T351TKTEXTTXWSTRADescription of maintenance strategyCHAR30(0)
T351ZEIEHDZEIEHUnit for the performance of maintenance tasksUNIT3(0)Config Table: T006
T351LEIEHLEIEHMaintenance strategy activity unitUNIT3(0)Config Table: T006
T351ZYK1GDZYK1_GESTotal cycle duration of a maintenance strategyFLTP16(16)
T351ZYK2GDZYK2_GESTotal cycle duration of a maintenance strategyFLTP16(16)
T351ZYK1KDZYK1_GGTSmallest step between two maintenance packagesFLTP16(16)
T351ZYK2KDZYK2_GGTSmallest step between two performance-based MaintPackagesFLTP16(16)
T351ANZP1ANZPAK1Number of MaintPackages in the MaintStrategyNUMC2(0)
T351ANZP2ANZPAK2Number of MaintPackages in the MaintStrategy (peformance)NUMC2(0)
T351TOLE1TOLERPLUSTolerance for Late Completion (%)NUMC3(0)
T351TOLE2TOLERNEGTolerance for Early Completion (%)NUMC3(0)
T351VERS1VERSCHPLUSShift Factor for Late CompletionNUMC3(0)
T351VERS2VERSCHNEGShift Factor for Early CompletionNUMC3(0)
T351TERMKTERMKNZScheduling indicatorCHAR1(0)
T351HORIZHORIZONTCall horizon for maintenance plan callsNUMC3(0)
T351HORIZ_QUALIFIEREAM_CC_CALLHORIZON_QUALIFIERCalculation Type of Call HorizonCHAR1(0)
T351FABKLFABKLFactory calendar keyCHAR2(0)Config Table: TFACD
T351AUTHGREAM_AUTH_GROUPAuthorization GroupCHAR4(0)Config Table: T370B


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System
1C1Description must not be blankKTEXT is blankSTRAT, KTEXTPF2, WP2, DCT
2C1Unit for the performance of maintenance tasks not in T006ZEIEH is not in T006STRAT, KTEXT, ZEIEHPF2, WP2, DCT

Informal Words **

Group 1

Group 2

Group 3

Group 4

Group 5

*DNU

Delete

donot

Formerly

Old #

..

Deletion

DONT USE

From

Old[ ]

/

DELISTED

DON'T USE

Incorrect

PLEASE USE

?

Discontinued

Dup Use

Invalid

Pls Use

@

Disposable

DUPLICATE

New

Previously

^

DNU

-DUPLICATE

NOT ACTIVE

Replace

+

Do Not

DUPLICATION

not in use

Replaced

++

Do Not Re

Duplicidad

Not Used

RESERVED

£

Do Not Sell

Duplikat

NOT VALID

Retired

Defective

Do Not Use

Former

Obsolete

ZZDEL


Conversion Process

The high-level process is represented by the diagram below:

For sites that are not on SAP-PF2 and WP2 systems, collection will be done manually in the data collection template.

The high-level process for DCT is represented by the diagram below:

Data Privacy and Sensitivity


Extraction

Syniti will extract data from source system based on relevancy rule. This is done only ONCE at the start of the project.

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

1

Syniti will extract data from source system based on relevancy rule. This is done only ONCE at the start of the project.

Syniti

2

The legacy data will then be used in Syniti Data construction page.

Syniti

Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set

Not Applicable






Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

Maintenance Strategy DCT Rules

Field NameField DescriptionRule
LegacySTRATLegacy StrategyMandatory(Key)
LegacyKTEXTLegacy DescriptionMandatory
LegacyZEIEHLegacy Unit for the performance of maintenance tasksMandatory
STRATStrategyS4/HANA value
KTEXTDescriptionS4/HANA value
ZEIEHUnit for the performance of maintenance tasksValues must exist in config table T006
LegacyHORIZLegacy Call horizon for maintenance plan calls
LegacyHORIZ_QUALIFIERLegacy Calculation Type of Call Horizon
LegacyLEIEHLegacy Maintenance strategy activity unit
LegacyZYK1GLegacy Total cycle duration of a maintenance strategy
LegacyZYK2GLegacy Total cycle duration of a maintenance strategy
LegacyZYK1KLegacy Smallest step between two maintenance packages
LegacyZYK2KLegacy Smallest step between two performance-based MaintPackages
LegacyANZP1Legacy Number of MaintPackages in the MaintStrategy
LegacyANZP2Legacy Number of MaintPackages in the MaintStrategy (performance)
LegacyTOLE1Legacy Tolerance for Late Completion (%)
LegacyTOLE2Legacy Tolerance for Early Completion (%)
LegacyVERS1Legacy Shift Factor for Late Completion
LegacyVERS2Legacy Shift Factor for Early Completion
LegacyTERMKLegacy Scheduling indicator
LegacyFABKLLegacy Factory calendar key
LegacyAUTHGRLegacy Authorization Group

Extraction Dependencies

Item #Step DescriptionTeam Responsible

Not Applicable




Transformation

The legacy data is maintained in Syniti Data Construction page. All mapping is performed in Syniti Data Construction page.

Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business

SyWay A2D Data Team

2

<Add steps from Syniti Migrate here>

SyWay A2D Data Team

3

Review and Validate Error and Preload Reports

SyWay A2D Data Team

4

Generate Load Files

SyWay A2D Data Team


Transformation Rules

All transformation and mapping is performed in Syniti Data Construction page.

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic





















Transformation Mapping

All transformation and mapping is performed in Syniti Data Construction page.
Mapping Table NameMapping Table Description


Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1

Ensure DCT completeness

Business & SyWay A2D Data Team

2

T006 configuration must be completed

Business & SyWay A2D Data Team


Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count

SyWay A2D Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

SyWay A2D Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields

  2. Field and Value Mapping Correctness

  3. Null Checks

  4. Text Length Checks

Review Error Reports

Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.


Business

Completeness

TaskAction

Verify Record Count

Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or produce the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible







Load Phase and Dependencies

Configuration

Item #Configuration Item
1T006  - Units of Measurement details


Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

SyWay A2D Data Team to verify that the Maintenance Strategy data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Business

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.


Accuracy

TaskAction

Conversion Accuracy

Verify that the Maintenance Strategy data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Maintenance Strategy is in scope based on data design and any exception requested by business.
  • Valid legacy data objects dependent on S4/HANA strategies have relevant S4/HANA strategy/packages mapped


See also

Change log

Version Published Changed By Comment
CURRENT (v. 10) Apr 02, 2026 13:43 ERGUIZA-ext, Pinky Love Changed Owner to Iesha
v. 205 Mar 03, 2026 13:16 TEE-ext, Paul
v. 204 Mar 03, 2026 12:03 TEE-ext, Paul
v. 203 Mar 03, 2026 08:57 TEE-ext, Paul
v. 202 Mar 03, 2026 08:29 TEE-ext, Paul
v. 201 Mar 03, 2026 06:44 TEE-ext, Paul
v. 200 Mar 03, 2026 06:31 TEE-ext, Paul
v. 199 Mar 03, 2026 06:26 TEE-ext, Paul
v. 198 Feb 27, 2026 12:45 TEE-ext, Paul
v. 197 Feb 27, 2026 12:30 TEE-ext, Paul

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels