T

The purpose of this document is to define the conversion approach to create 2005 - Material Master MRP views
in S/4 HANA.

Material Master - MRP Views are now used to make some of the Planning activities in both systems (PF2 & WP2). Most of the materials used in the planning process have these views updated, as they contain relevant information about the planning process. The aim is to get the conversion into S4 HANA in a standard way, so it can be used in the new planning processes already defined by the functional team and validated with the business.

While PF2 and WP2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design.

The data from legacy system may include:

  1. Uncleansed data or duplicated records

The data from legacy system excludes:

  1. All materials flagged for deletion
  2. Any blocked or obsolete materials
  3. Any inactive materials that are out of scope


Conversion Scope

The scope of this document covers the approach for converting active from Legacy Source Systems into S/4HANA following the Master Data Design Standard.


The data from legacy system includes:

The data from legacy system excludes:


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records





















Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
MARCAUSMEAUSMEUnit of issueUNIT3C
MARCFRTMEFRTMEProduction unitUNIT3C
MARCMMSTAMMSTAMaterial StatusCHAR2C
MARCMMSTDMMSTDValid FromDATS8C
MARCFEVORFEVORProdn SupervisorCHAR3

R
List of customizing values and mapping with AS IS will be build as per

MARCLGPROLGPROStorage LocationCHAR4

R
List of customizing values and mapping with AS IS will be build as per

MARCSFCPFCO_PRODPRFProd. Sched. ProfileCHAR6

R : Mapping with As Is values and to be values to be provided

MARCMATGRMATNRGROUPMat. GroupingCHAR20NU
MARCSERNPSERAILSerial Number ProfileCHAR4NU
MARASERLVSERLVSerLevelCHAR1NU
MARCOCMPFOCM_GPROFILEOverall profileCHAR6NU
MARCKZKRIKZKRIIndicator: Critical partCHAR1C
MARCKZECHKZECHBatch entryCHAR1C
MARAXCHPFXCHPFBatch Management
Requirement Indicator
CHAR1C
MARCINSMKINSMKPost to Inspection StockCHAR1C
MARAXGCHPXGCHPApproved Batch Record RequiredCHAR1NU
MARCXCHPFXCHPFBatch Management
Requirement Indicator for Plant
CHAR1C
MARCUNETOUNETOUnderdel. Tol.DEC3C
MARCUEETOUEETOOverdeliv. Tol.DEC3C
MARCUEETKUEETKIndicator: Unlimited
Overdelivery Allowed
CHAR1C
MARCRUEZTRUEZTSetup timeDEC5C
MARCTRANZTRANZInteroperationDEC5C
MARCDZEITDZEITIn-house production timeDEC3C
MARCBEARZBEARZProcessing timeDEC5C
MARCBASMGBASMGBase quantityQUAN13C


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System
01CNV-01Material is not active or is deletedMaterials that are not used for more than 3 years, no subject to migrateOnly active materials during the last 3 years will be migratedPF2/WP2
02CNV-02Material is not an "E" Procurement typeMaterials with "E" Procurement needs to have Work Scheduling ViewMaterials with no "E" procurement are out of scopePF2/WP2
03CNV-03Production Scheduling Profile is missingMaterials with WS View in Material Master must have Production Scheduling  ProfileMaterials with no Prod. Sched Profile needs to be updated by the businessPF2/WP2
04CNV-04Production Supervisor is MissingMaterials with WS view and No Prod Supervisor filled, needs to be checked by the Data OwnerProd Supervisor has been updated for all relevant materialsPF2/WP2
05CNV-05Production Storage Location is missingMaterials with WS view need to have Production Storage location definedProd Storage Location needs to be updated for all relevant materialsPF2/WP2
06CNV-06





Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract from MARC all Material/Plant relevant as Procurement Type E, and be updated as "A" means that the Work Scheduling view is updatedSinity / Data Team

2

Extract data from source system based on relevancy rule

SyWay Data Team

3

Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. 

SyWay Data Team

4Sinity will extract data and convert it into SQL data base ad share with the teamSinity team


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business

SyWay S2P Data Team

2

<Add steps from Syniti Migrate here>

SyWay S2P Data Team

3

Review and Validate Error and Preload Reports

SyWay S2P Data Team

4

Generate Load Files

SyWay S2P Data Team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1PF2/WQ2S_MARAMATNRMaterial NumberS/4HANAS_MARAMATNRMaterial NumberGenerate new Material number in Target System and maintain mapping in reference table































Transformation Mapping

Mapping Table NameMapping Table Description

Material Type

Mapping of legacy Material Types to target system value

Material Group

Mapping of legacy Material Groups to target system value

Product HierarchyMapping of legacy Product Hierarchies to target system value


Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1

Ensure DCT tables completeness

SyWay S2P Data Team

2

Value Mappings are according to the latest design - <List of Value Mappings>

SyWay S2P Data Team








Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count

SyWay S2P Data Team to verify that the total number of relevant records from the  DCT is equal to the total number of records in the Preload and Load Sheets.






Accuracy

TaskAction

Conversion Accuracy

SyWay S2P Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks

Review Error Reports

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.




Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Go to <Load Tool>

SyWay S2P Data Team

2

Load 3 records for < > to validate if data is loaded successfully without errors

SyWay S2P Data Team

3

Load 3 records for < > to validate if data is loaded successfully without errors

SyWay S2P Data Team

4

Proceed with full load if steps 2 and 3 are validated

SyWay S2P Data Team

5

Validate few records loaded by accessing standard transactions from S/4HNA eg. MM03

SyWay S2P Data Team

6

Generate post load report if step 5 is validated

SyWay S2P Data Team


Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 4) Apr 23, 2026 12:16 CASTRO MONCAYO-ext, Jose Luis
v. 22 Apr 23, 2026 12:13 CASTRO MONCAYO-ext, Jose Luis PDM-1680
v. 21 Feb 24, 2026 08:31 CASTRO MONCAYO-ext, Jose Luis
v. 20 Dec 11, 2025 11:39 CASTRO MONCAYO-ext, Jose Luis CR0209 Include DCT Layout
v. 19 Nov 14, 2025 11:34 CASTRO MONCAYO-ext, Jose Luis
v. 18 Oct 27, 2025 08:54 CASTRO MONCAYO-ext, Jose Luis
v. 17 Oct 13, 2025 13:39 CASTRO MONCAYO-ext, Jose Luis
v. 16 Oct 13, 2025 12:25 CASTRO MONCAYO-ext, Jose Luis
v. 15 Oct 13, 2025 12:14 CASTRO MONCAYO-ext, Jose Luis
v. 14 Oct 13, 2025 12:05 CASTRO MONCAYO-ext, Jose Luis

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels