Purpose
The purpose of this document is to define the conversion approach to create 1056 - Resources in S/4 HANA.
Resources are used to identify the production lines, equipment and all the machines related to the production execution process. Resources are the main data to be used to design the Master Recipes for all the Syensqo plants.
Conversion Scope
The scope of this document covers the approach for converting active 1056- Resources from Legacy Source Systems into S/4HANA following the Resource Master Data Design Standard.
Stand alone rules
The data from legacy system includes:
- Active Resources as of > three (3) years with history and/or included in active Recipes / Process Orders
- Resources W/O Deletion Flag
- Resources that will be migrated to the To-Be Plant Mapping (Take in consideration the To-Be definition of Plants
The data from legacy system excludes:
- Inactive Resources with more than three (3) years.
- Resources marked for deletion
- Resources belonging to Deleted plants (New plant Definition according with the To-Be Plant mapping)
Relevancy rule
- Material/Plant with history and include active process orders - Materials defined via Status at global and Plant level (MARC/MARA)
- Defined materials which are recognised as active and contain 3 years process order history, these are then checked against active BOMS to define Master Recipe at Plant level
- Master Recipes defined as per the Material Master containing 3 years Process order History, define the Resource by Plant
Material Plant Active with three years Process order History
defines Active BOMS by Plant
defines Active Master Recipe by Plant
Defines the Resource by Plant.
Plant Merging
Plants will be defined accordingly as some plants will be merged into one plant. Plants will be defined as NEW plant codes and be transformed via a transformation table, which will be contained in Syniti.
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
PF2, WP2 | Resources will be extracted from PF2 and WP2 | PF2 - 6096 WP2 - 9077 | S/4 HANA | PF2 - 6096 WP2 - 9077 |
| DCT | Resources for Plant / Resources combination which do not have data existing from PF2 and WP2 | S/4 HANA |
Additional Information
Multi-language Requirement
English , French, Chinese, Spanish
Document Management
Legal Requirement
N/A
Special Requirements
N/a
N/a
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement | MDS Field Mapping in Scope | Field Value in MDS | |
|---|---|---|---|---|---|---|---|---|---|
| 1 | CRHD | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | In Scope | |
| 2 | CRHD | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 3 | CRHD | ARBPL | ARBPL | Work Center | CHAR | 8 | R | TBD | |
| 4 | CRHD | WERKS | WERKS_D | Plant | CHAR | 4 | R | TBD | |
| 5 | CRHD | VERWE | AP_VERWE | Work Center Category | CHAR | 4 | R | 0008 Processing Unit | |
| 6 | CRHD | PLANV | AP_PLANV | Key for task list usage | CHAR | 3 | R | 0008 Master Recipe + Process Order | |
| 7 | CRHD | STAND | AP_STAND | Work center location | CHAR | 10 | C | MFG Execution Config Register | |
| 8 | CRHD | VERAN | AP_VERAN | Person Responsible for the Work Center | CHAR | 3 | C | MFG Execution Config Register | |
| 9 | CRHD | VGWTS | VORGSCHL | Standard Value Key | CHAR | 4 | R | TBD | |
| 10 | CRHD | VGM01 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 11 | CRHD | VGM02 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 12 | CRHD | VGM03 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 13 | CRHD | VGM04 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | In Scope | |
| 14 | CRHD | VGM05 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 15 | CRHD | VGM06 | AP_VGW_MES | Rule for standard value maintenance | CHAR | 1 | C | ||
| 16 | CRHD | ZGR01 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 17 | CRHD | ZGR02 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 18 | CRHD | ZGR03 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 19 | CRHD | ZGR04 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 20 | CRHD | ZGR05 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 21 | CRHD | ZGR06 | IDZEITGRAD | Key for performance efficiency rate | CHAR | 3 | NU | ||
| 22 | CRHD | PRVBE | PRVBE | Production Supply Area | CHAR | 10 | C | ||
| 23 | CRHD | RGEKZ | RGEKZAP | Indicator: Backflushing | CHAR | 1 | C | ||
| 24 | CRHD | STEUS | STEUS | Control Key | CHAR | 4 | R | ||
| 25 | CRHD | VGE01 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 26 | CRHD | VGE02 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 27 | CRHD | VGE03 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 28 | CRHD | VGE04 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 29 | CRHD | VGE05 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 30 | CRHD | VGE06 | VGWRTEH | Unit of measure for the standard value | UNIT | 3 | C | ||
| 31 | CRHD | KAPAR | KAPART | Capacity category | CHAR | 3 | R | ||
| 32 | CRHD | KAPNAME | KAPNAME | Capacity name | CHAR | 8 | R | ||
| 33 | CRHD | FORT1 | AP_FORM_T1 | Formula for setup time | CHAR | 6 | NU | TBD | |
| 34 | CRHD | FORT2 | AP_FORM_T2 | Formula for the duration of processing time | CHAR | 6 | NU | TBD | |
| 35 | CRHD | FORT3 | AP_FORM_T3 | Formula for teardown time | CHAR | 6 | NU | TBD | |
| 36 | CRHD | FORTN | AP_FORM_TN | Formula for the duration of other types of int. processing | CHAR | 6 | NU | TBD | |
| 37 | CRTX | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | ||
| 38 | CRTX | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 39 | CRTX | SPRAS | SPRAS | Language | CHAR | 1 | R | ||
| 40 | CRTX | KTEXT | CR_KTEXT | Short description | CHAR | 40 | R | ||
| 41 | CRCA | OBJTY | CR_OBJTY | Object Type | CHAR | 2 | S | ||
| 42 | CRCA | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 43 | CRCA | CANUM | CR_CAPNUM | Capacity allocation number | CHAR | 6 | S | TBD | |
| 44 | CRCA | FORK1 | AP_FORM_K1 | Formula for Setup Capacity Requirements | CHAR | 6 | NU | ||
| 45 | CRCA | FORK2 | AP_FORM_K2 | Formula for Processing Capacity Requirements | CHAR | 6 | NU | ||
| 46 | CRCA | FORK3 | AP_FORM_K3 | Formula for Teardown Capacity Requirements | CHAR | 6 | NU | ||
| 47 | CRCA | FORKN | AP_FORM_KN | Formula for Other Capacity Requirements | CHAR | 6 | NU | ||
| 48 | CRCA | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 49 | KAKT | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 50 | KAKT | SPRAS | SPRAS | Language | CHAR | 1 | R | ||
| 51 | KAKT | KTEXT | CR_KTEXT | Capacity Text | CHAR | 40 | R | ||
| 52 | CRCO | OBJTY | CR_OBJTY | Object type | CHAR | 2 | S | ||
| 53 | CRCO | OBJID | CR_OBJID | Object ID | NUMC | 8 | S | ||
| 54 | CRCO | LASET | #N/A | Activity Type Set | CHAR | 6 | S | ||
| 55 | CRCO | ENDDA | ENDDATUM | End Date | DATS | 8 | R | 31/12/9999 | |
| 56 | CRCO | BEGDA | BEGDATUM | Start Date | DATS | 8 | R | ||
| 57 | CRCO | KOKRS | KOKRS | CO Area | CHAR | 4 | R | ||
| 58 | CRCO | KOSTL | KOSTL | Cost Center | CHAR | 10 | R | ||
| 59 | CRCO | LSTAR1 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 60 | CRCO | LEINH1 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 61 | CRCO | FORML1 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 62 | CRCO | LSTAR2 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 63 | CRCO | LEINH2 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 64 | CRCO | FORML2 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 65 | CRCO | LSTAR3 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 66 | CRCO | LEINH3 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 67 | CRCO | FORML3 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 68 | CRCO | LSTAR4 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 69 | CRCO | LEINH4 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 70 | CRCO | FORML4 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 71 | CRCO | LSTAR5 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 72 | CRCO | LEINH5 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 73 | CRCO | FORML5 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 74 | CRCO | LSTAR6 | LSTAR | Activity Type | CHAR | 6 | C | ||
| 75 | CRCO | LEINH6 | LEINH | Activity Unit | UNIT | 3 | C | ||
| 76 | CRCO | FORML6 | FORML | Formula key for costing | CHAR | 6 | R | ||
| 77 | KAKO | KAPID | KAPID | Capacity ID | NUMC | 8 | S | ||
| 78 | KAKO | AZMAX | KAPANZAHL | No. Ind. Capacities | INT2 | 5 | NU | ||
| 79 | KAKO | AZNOR | KAPANZAHL | No. Ind. Capacities | INT2 | 5 | R | ||
| 80 | KAKO | BASNE | KAPBASNEN | Denominator base cap | DEC | 5 | S | ||
| 81 | KAKO | BASZL | KAPBASZHL | Numerator base cap. | DEC | 5 | S | ||
| 82 | KAKO | BEGZT | KAPBEGZT | Start Time | INT4 | 10 | R | ||
| 83 | KAKO | ENDZT | KAPENDZT | End Time | INT4 | 10 | R | ||
| 84 | KAKO | KALID | CR_WFCID | Factory Calendar | CHAR | 2 | C | ||
| 85 | KAKO | KAPAR | KAPART | Capacity category | CHAR | 3 | R | ||
| 86 | KAKO | MEINS | KAPBASIS | Capacity Base Unit | UNIT | 3 | R | ||
| 87 | KAKO | MOSID | SCHGRUP | Shift Grouping | CHAR | 2 | C | ||
| 88 | KAKO | NAME | KAPNAME | Capacity | CHAR | 8 | NU | ||
| 89 | KAKO | NGRAD | NUTZGRAD | Capacity Utilization | NUMC | 3 | R | ||
| 90 | KAKO | PAUSE | KAPPAUSE | Break Duration | INT4 | 10 | R | ||
| 91 | KAKO | PLANR | KAPPLANER | Capacity Responsible Planner | CHAR | 3 | R | ||
| 92 | KAKO | POOLK | KAP_KZPOOL | Pooled Capacity Indicator | CHAR | 1 | C | ||
| 93 | KAKO | REFAN | KAPREFANZN | Number (ref. cap.) | INT1 | 3 | C | ||
| 94 | KAKO | REFAZ | KAPREFANZZ | Number (capacity) | INT1 | 3 | C | ||
| 95 | KAKO | REFID | KAPID | Capacity ID | NUMC | 8 | C | ||
| 96 | KAKO | SUPPK | KAP_SUPPLY | Avail. cap. limits | CHAR | 1 | C (if not entered, 100% will be the default) | ||
| 97 | KAKO | VERSA | KAPVERSAKT | Active Version | NUMC | 2 | R | ||
| 98 | KAKO | WERKS | WERKS_D | Plant | CHAR | 4 | NU | ||
| 99 | KAKO | KAPIE | KAPID | Capacity ID | NUMC | 8 | NU | ||
| 100 | KAKO | KAPTER | KAP_KZTER | Relevant to Finite Scheduling | CHAR | 1 | C | ||
| 101 | KAKO | KAPAVO | KAP_KZAVO | Can be used by several operations | CHAR | 1 | C | ||
| 102 | KAKO | UEBERLAST | UEBERLAST | Overload (%) | NUMC | 3 | C | ||
| 103 | KAKO | KAPLPL | KAP_KZLPL | No Long-Term Planning | CHAR | 1 | C | ||
| 104 | KAKO | KAPEH | CR_KAPEH | Capacity Unit | UNIT | 3 | C (if PP/DS is used) | ||
| 105 | KAKO | MEHR | KAP_MEHR | Has Individual Capacities | CHAR | 1 | C (if PP/DS is used) | ||
| 106 | KAKO | ANG_UNIT | KAPAZIT_VM_UNIT | Av. cap. unit | UNIT | 3 | C (if PP/DS is used) | ||
| 107 | KAKO | ANG_MIN | KAPAZIT_VM_MIN | Minimum capacity | QUAN | 13 | C (if PP/DS is used) | ||
| 108 | KAKO | ANG_MAX | KAPAZIT_VM_MAX | Max. capacity | QUAN | 13 | C (if PP/DS is used) |
Data Cleansing
Business will perform data cleansing in the current ECC system. This means ECC will serve as the single source of truth for Manufacturing Data prior to the migration to S/4HANA.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 1056-1 | C1 | Resource is not used for the last 3 years | All Resources not used for the last 3 years, won't be migrated | Active Resources during the last 3 years | PF2 /WP2 |
| 1056-2 | C1 | Resource is flagged for deletion | All Resources flagged for deletion won't be migrated | Resources with NO flag for deletion | PF2/WP2 |
| 1056-3 | C1 | Resources in Plants that are Out of Scope | Resources created in Plants Out of Scope won't be migrated | Resources valid in Active plants (To Be mapping) | PF2/WP2 |
| 1056-4 | C1 | Resources with No formulas for capacity, scheduling or costing | Resources with missing capacity, Scheduling and costing formulas won't be migrated | Only Resources with all formulas will be migrated | PF2/WP2 |
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into . There are 2 possibilities:
- The data exists. connects to the source and loads the data into . There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | SyWay Data Team |
| 2 | Google Sheet/ MS Excel/ SQL report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. | SyWay Data Team |
| 3 | Sinity will extract data and convert it into SQL data base ad share with the team | Sinity team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
Field Name | Field description | Rule |
| CRHD-ARBPL | Work Center | Represents a machine, group of machines, production line or a person assigned to an operation Data Type: Character Length: 8 |
| CRHD-WERKS | Plant | Key uniquely identifying a plant Data Type: Character Length: 4 |
| CRHD-VERWE | Work Center Category | Key differentiating resources according to their category (e.g. resource network, process unit) Data Type: Character Length: 4 |
| CRHD-PLANV | Key for task list usage | Controls which type of tasks list are allowed to use this resource Data Type: Character Length: 3 |
| CRHD-STAND | Work center location | Represents the physical location of the resource Data Type: Character Length: 10 |
| CRHD-VERAN | Person Responsible for the Work Center | The person or group of people who are responsible for the maintenance of the resource - Useful for Reporting purposes Data Type: Character Length: 3 |
| CRHD-VGWTS | Standard Value Key | The system uses standard values as parameters with origin "standard value" in formulas to calculate execution time, capacity requirements and costs Data Type: Character Length: 4 |
| CRHD-VGM01 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) Data Type: Character Length: 1 |
| CRHD-VGM02 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) Data Type: Character Length: 1 |
| CRHD-VGM03 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) Data Type: Character Length: 1 |
| CRHD-VGM04 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) Data Type: Character Length: 1 |
| CRHD-VGM05 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) Data Type: Character Length: 1 |
| CRHD-VGM06 | Rule for standard value maintenance | Determines how the system reacts when you enter or do not enter a standard value in an operation of a Master Recipe (must be entered, should be entered, should not be entered, cannot be entered) Data Type: Character Length: 1 |
| CRHD-PRVBE | Production Supply Area | Serves as a place for interim storage on the shop floor and is used to make material directly available for production purposes Data Type: Character Length: 10 |
| CRHD-RGEKZ | Indicator: Backflushing | Indicates that material components allocated to the operation are backflushed Data Type: Character Length: 1 |
| CRHD-STEUS | Control Key | Determines which business transactions should be executed for the object that belongs to the task list or order (for example scheduling or costing). Data Type: Character Length: 4 |
| CRHD-VGE01 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value Data Type: Unit Length: 3 |
| CRHD-VGE02 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value Data Type: Unit Length: 3 |
| CRHD-VGE03 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value Data Type: Unit Length: 3 |
| CRHD-VGE04 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value Data Type: Unit Length: 3 |
| CRHD-VGE05 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value Data Type: Unit Length: 3 |
| CRHD-VGE06 | Unit of measure for the standard value | Unit of the standard value. If you have specified a unit in the work center, your entry is taken as the default value Data Type: Unit Length: 3 |
| CRHD-KAPART | Capacity category | Field Categorizes the Capacity of a Work Center Data Type: Character Length: 3 |
| CRHD-KAPNAME | Capacity name | Capacity Name or Capacity Description Data Type: Character Length: 4 |
| CRHD-FORT1 | Formula for setup time | Formula used in scheduling to calculate the setup time of an operation Data Type: Character Length: 6 TBD not sure if this will be used - Functional to advise |
| CRHD-FORT2 | Formula for the duration of processing time | Formula used in scheduling to determine the operation processing time Data Type: Character Length: 6 TBD not sure if this will be used - Functional to advise |
| CRHD-FORT3 | Formula for teardown time | Formula used in scheduling to determine teardown time in an operation Data Type: Character Length: 6 TBD not sure if this will be used - Functional to advise |
| CRHD-FORTN | Formula for the duration of other types of int. processing | Formula for calculating the duration times of other types of internal processing in scheduling Data Type: Character Length: 6 TBD not sure if this will be used - Functional to advise |
| CRTX-SPRAS | Language | Language in which the resource description is maintained Data Type: Character Length: 1 |
| CRTX-KTEXT | Short description | Contains a brief description of the resource Data Type: Character Length: 40 |
| KAKT-SPRAS | Language | Language of the text displayed Data Type: Character Length: 1 |
| KAKT-KTEXT | Capacity Text | Description of Capacity Data Type: Character Length: 40 |
| CRCO-LASET | Activity Type Set | Represents the assignment number of an activity type within a work center's costing data Data Type: Character Length: 6 |
| CRCO-ENDDA | End Date | date that identifies the end of the validity period Data Type: Date Field Length: 8 DD/MM/YYYY |
| CRCO-BEGDA | Start Date | date that identifies the start of a validity period Data Type: Date Field Length: 8 DD/MM/YYYY |
| CRCO-KOKRS | CO Area | An organizational unit within an enterprise for which a complete cost accounting can be performed within a closed system Data Type: Character Length: 4 |
| CRCO-KOSTL | Cost Center | Represents a delimited location where costs occur Data Type: Character Length: 10 |
| CRCO-LSTAR1 | Activity Type | Activity types describe the activity produced by a cost center and are measured in units of time or quantity Data Type: Character Length: 6 |
| CRCO-LEINH1 | Activity Unit | The activity unit is either the time or quantity unit used to post the consumed activity quantities Data Type: Unit Length: 3 |
| CRCO-FORML1 | Formula key for costing | Refers to the formula used for Calculation of costs of a work center's activity type Data Type: Character Length: 6 |
| CRCO-LSTAR2 | Activity Type | Activity types describe the activity produced by a cost center and are measured in units of time or quantity Data Type: Character Length: 6 |
| CRCO-LEINH2 | Activity Unit | The activity unit is either the time or quantity unit used to post the consumed activity quantities Data Type: Unit Length: 3 |
| CRCO-FORML2 | Formula key for costing | Refers to the formula used for Calculation of costs of a work center's activity type Data Type: Character Length: 6 |
| CRCO-LSTAR3 | Activity Type | Activity types describe the activity produced by a cost center and are measured in units of time or quantity Data Type: Character Length: 6 |
| CRCO-LEINH3 | Activity Unit | The activity unit is either the time or quantity unit used to post the consumed activity quantities Data Type: Unit Length: 3 |
| CRCO-FORML3 | Formula key for costing | Refers to the formula used for Calculation of costs of a work center's activity type Data Type: Character Length: 6 |
| CRCO-LSTAR4 | Activity Type | Activity types describe the activity produced by a cost center and are measured in units of time or quantity Data Type: Character Length: 6 |
| CRCO-LEINH4 | Activity Unit | The activity unit is either the time or quantity unit used to post the consumed activity quantities Data Type: Unit Length: 3 |
| CRCO-FORML4 | Formula key for costing | Refers to the formula used for Calculation of costs of a work center's activity type Data Type: Character Length: 6 |
| CRCO-LSTAR5 | Activity Type | Activity types describe the activity produced by a cost center and are measured in units of time or quantity Data Type: Character Length: 6 |
| CRCO-LEINH5 | Activity Unit | The activity unit is either the time or quantity unit used to post the consumed activity quantities Data Type: Unit Length: 3 |
| CRCO-FORML5 | Formula key for costing | refers to the formula used for Calculation of costs of a work center's activity type Data Type: Character Length: 6 |
| CRCO-LSTAR6 | Activity Type | Activity types describe the activity produced by a cost center and are measured in units of time or quantity Data Type: Character Length: 6 |
| CRCO-LEINH6 | Activity Unit | The activity unit is either the time or quantity unit used to post the consumed activity quantities Data Type: Unit Length: 3 |
| CRCO-FORML6 | Formula key for costing | refers to the formula used for Calculation of costs of a work center's activity type Data Type: Character Length: 6 |
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Source System Availability
| Syensqo IT |
| 2 | Data Structure
| Syniti |
| 3 | Referential Integrity
| Syniti |
| 4 | Extraction Methodology
| Syniti |
| 5 | Performance and Scalability Considerations
| Syniti |
| 6 | Security and Compliance
| Syniti |
| 7 | Data cleansing of legacy Resource - If standardization within the DCT begins using relevant data from PF2 and WP2 before the cleansing is finalized, it is understood that the business will take due diligence to ensure any subsequent delta cleansing is verified and aligned within the DCT. | Business |
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Obtain DCT Sign-off from Business | SyWay Data Team |
| 2 | <Add steps from Syniti Migrate here> | SyWay Data Team |
| 3 | Review and Validate Error and Preload Reports | SyWay Data Team |
| 4 | Generate Load Files | SyWay Data Team |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2/WP2 | CRHD | OBJTY | Object type | S4 HANA | CRHD | OBJTY | Object type | System Generated Field |
| 2 | PF2/WP2 | CRHD | OBJID | Object ID | S4 HANA | CRHD | OBJID | Object ID | System Generated Field |
| 3 | PF2/WP2 | CRHD | ARBPL | Resource ID | S4 HANA | CRHD | ARBPL | Resource ID | Look at the file Resources equivalent for Plant - Resource Name as Existing Plant-New Plant mapping Check Resource name. |
| 4 | PF2/WP2 | CRHD | WERKS | Plant | S4 HANA | CRHD | WERKS | Plant | Map from Old Plants to New Plants |
| 5 | PF2/WP2 | CRHD | VERWE | Work Center Category | S4 HANA | CHRD | VERWE | Work Center Category | VALUE 0008 |
| 6 | PF2/WP2 | CRHD | PLANV | Key for task list usage | S4 HANA | CHRD | PLANV | Key for task list usage | Value Direct from the current system |
| 7 | PF2/WP2 | CRHD | STAND | Work center location | S4 HANA | CHRD | STAND | Work center location | Value set based upon MFG Execution Config Register C : Business Rule |
| 8 | PF2/WP2 | CRHD | VERAN | Person Responsible for the Work Center | S4 HANA | CHRD | VERAN | Person Responsible for the Work Center | Value set based upon MFG Execution Config Register C : Business Rule |
| 9 | PF2/WP2 | CRHD | VGWTS | Standard Value Key | S4 HANA | CHRD | VGWTS | Standard Value Key | TBD - STD Value Key maybe part of transformation and mapping |
| 10 | PF2/WP2 | CRHD | VGM01 | Rule for standard value maintenance | S4 HANA | CHRD | VGM01 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 11 | PF2/WP2 | CRHD | VGM02 | Rule for standard value maintenance | S4 HANA | CHRD | VGM02 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 12 | PF2/WP2 | CRHD | VGM03 | Rule for standard value maintenance | S4 HANA | CHRD | VGM03 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 13 | PF2/WP2 | CRHD | VGM04 | Rule for standard value maintenance | S4 HANA | CHRD | VGM04 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 14 | PF2/WP2 | CRHD | VGM05 | Rule for standard value maintenance | S4 HANA | CHRD | VGM05 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 15 | PF2/WP2 | CRHD | VGM06 | Rule for standard value maintenance | S4 HANA | CHRD | VGM06 | Rule for standard value maintenance | If the standard value is pulled and used then this field is required. Value Direct from the current system |
| 16 | PF2/WP2 | CRHD | PRVBE | Production Supply Area | S4 HANA | CHRD | PRVBE | Production Supply Area | Business Rule If the WC always gets its raw materials staged to a fixed area / integration with WM to determine destination bin |
| 17 | PF2/WP2 | CRHD | RGEKZ | Indicator: Backflushing | S4 HANA | CHRD | RGEKZ | Indicator: Backflushing | Business Rule If all components used at a machine/line should be automatically issued at confirmation |
| 18 | PF2/WP2 | CRHD | STEUS | Control Key | S4 HANA | CHRD | STEUS | Control Key | Mandatory Direct from the current system |
| 19 | PF2/WP2 | CRHD | VGE01 | Unit of measure for the standard value | S4 HANA | CHRD | VGE01 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 20 | PF2/WP2 | CRHD | VGE02 | Unit of measure for the standard value | S4 HANA | CHRD | VGE02 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 21 | PF2/WP2 | CRHD | VGE03 | Unit of measure for the standard value | S4 HANA | CHRD | VGE03 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 22 | PF2/WP2 | CRHD | VGE04 | Unit of measure for the standard value | S4 HANA | CHRD | VGE04 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 23 | PF2/WP2 | CRHD | VGE05 | Unit of measure for the standard value | S4 HANA | CHRD | VGE05 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 24 | PF2/WP2 | CRHD | VGE06 | Unit of measure for the standard value | S4 HANA | CHRD | VGE06 | Unit of measure for the standard value | If the rule of the corresponding standard Value is used then this unit should be filled |
| 25 | PF2/WP2 | CRHD | KAPART | Capacity category | S4 HANA | CHRD | KAPART | Capacity category | Value Direct from the current system |
| 26 | PF2/WP2 | CRHD | KAPNAME | Capacity name | S4 HANA | CHRD | KAPNAME | Capacity name | Value Direct from the current system |
| 27 | PF2/WP2 | CRHD | FORT1 | Formula for setup time | S4 HANA | CHRD | FORT1 | Formula for setup time | Registered as Not used, but this is to be decided, current SAP has values |
| 28 | PF2/WP2 | CRHD | FORT2 | Formula for the duration of processing time | S4 HANA | CHRD | FORT2 | Formula for the duration of processing time | Registered as Not used, but this is to be decided, current SAP has values |
| 29 | PF2/WP2 | CRHD | FORT3 | Formula for teardown time | S4 HANA | CHRD | FORT3 | Formula for teardown time | Registered as Not used, but this is to be decided, current SAP has values |
| 30 | PF2/WP2 | CRHD | FORTN | Formula for the duration of other types of int. processing | S4 HANA | CHRD | FORTN | Formula for the duration of other types of int. processing | Registered as Not used, but this is to be decided, current SAP has values |
| 31 | PF2/WP2 | CRTX | OBJTY | Object type | S4 HANA | CRTX | OBJTY | Object type | System Generated Field |
| 32 | PF2/WP2 | CRTX | OBJID | Object ID | S4 HANA | CRTX | OBJID | Object ID | System Generated Field |
| 33 | PF2/WP2 | CRTX | SPRAS | Language | S4 HANA | CRTX | SPRAS | Language | Value direct from the current SAP system, Languages will need to be configured, mostly set as EN (Language which the Resource is maintained) |
| 34 | PF2/WP2 | CRTX | KTEXT | Short description | S4 HANA | CRTX | KTEXT | Short description | Value direct from current SAP system, free text field, brief description of the Resource SPRAS Language |
| 35 | PF2/WP2 | CRCA | OBJTY | Object Type | S4 HANA | CRCA | OBJTY | Object Type | System Generated Field |
| 36 | PF2/WP2 | CRCA | OBJID | Object ID | S4 HANA | CRCA | OBJID | Object ID | System Generated Field |
| 37 | PF2/WP2 | CRCA | CANUM | Capacity allocation number | S4 HANA | CRCA | CANUM | Capacity allocation number | System Generated Field, The data value is TBD |
| 38 | PF2/WP2 | CRCA | KAPID | Capacity ID | S4 HANA | CRCA | KAPID | Capacity ID | System Generated Field |
| 39 | PF2/WP2 | KAKT | KAPID | Capacity ID | S4 HANA | KAKT | KAPID | Capacity ID | System Generated Field |
| 40 | PF2/WP2 | KAKT | SPRAS | Language | S4 HANA | KAKT | SPRAS | Language | Value direct from the current SAP system, Languages will need to be configured, mostly set as EN (Language which the Capacity is maintained) |
| 41 | PF2/WP2 | KAKT | KTEXT | Capacity Text | S4 HANA | KAKT | KTEXT | Capacity Text | Value direct from current SAP system, free text field, brief description of the Capacity SPRAS Language |
| 42 | PF2/WP2 | CRCO | OBJTY | Object type | S4 HANA | CRCO | OBJTY | Object type | System Generated Field |
| 43 | PF2/WP2 | CRCO | OBJID | Object ID | S4 HANA | CRCO | OBJID | Object ID | System Generated Field |
| 44 | PF2/WP2 | CRCO | LASET | Activity Type Set | S4 HANA | CRCO | LASET | Activity Type Set | System Generated Field |
| 45 | PF2/WP2 | CRCO | ENDDA | End Date | S4 HANA | CRCO | ENDDA | End Date | End date has value set to 31/12/9999 |
| 46 | PF2/WP2 | CRCO | BEGDA | Start Date | S4 HANA | CRCO | BEGDA | Start Date | Date value setting DD.MM.YYYY |
| 47 | PF2/WP2 | CRCO | KOKRS | CO Area | S4 HANA | CRCO | KOKRS | CO Area | Mandatory Value direct from current SAP system |
| 48 | PF2/WP2 | CRCO | KOSTL | Cost Center | S4 HANA | CRCO | KOSTL | Cost Center | Mandatory Value direct from current SAP system |
| 49 | PF2/WP2 | CRCO | LSTAR1 | Activity Type | S4 HANA | CRCO | LSTAR1 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 50 | PF2/WP2 | CRCO | LEINH1 | Activity Unit | S4 HANA | CRCO | LEINH1 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 51 | PF2/WP2 | CRCO | FORML1 | Formula key for costing | S4 HANA | CRCO | FORML1 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 52 | PF2/WP2 | CRCO | LSTAR2 | Activity Type | S4 HANA | CRCO | LSTAR2 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 53 | PF2/WP2 | CRCO | LEINH2 | Activity Unit | S4 HANA | CRCO | LEINH2 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 54 | PF2/WP2 | CRCO | FORML2 | Formula key for costing | S4 HANA | CRCO | FORML2 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 55 | PF2/WP2 | CRCO | LSTAR3 | Activity Type | S4 HANA | CRCO | LSTAR3 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 56 | PF2/WP2 | CRCO | LEINH3 | Activity Unit | S4 HANA | CRCO | LEINH3 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 57 | PF2/WP2 | CRCO | FORML3 | Formula key for costing | S4 HANA | CRCO | FORML3 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 58 | PF2/WP2 | CRCO | LSTAR4 | Activity Type | S4 HANA | CRCO | LSTAR4 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 59 | PF2/WP2 | CRCO | LEINH4 | Activity Unit | S4 HANA | CRCO | LEINH4 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 60 | PF2/WP2 | CRCO | FORML4 | Formula key for costing | S4 HANA | CRCO | FORML4 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 61 | PF2/WP2 | CRCO | LSTAR5 | Activity Type | S4 HANA | CRCO | LSTAR5 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 62 | PF2/WP2 | CRCO | LEINH5 | Activity Unit | S4 HANA | CRCO | LEINH5 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 63 | PF2/WP2 | CRCO | FORML5 | Formula key for costing | S4 HANA | CRCO | FORML5 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
| 64 | PF2/WP2 | CRCO | LSTAR6 | Activity Type | S4 HANA | CRCO | LSTAR6 | Activity Type | Business Rule Assign the correct activity type to the corresponding activity |
| 65 | PF2/WP2 | CRCO | LEINH6 | Activity Unit | S4 HANA | CRCO | LEINH6 | Activity Unit | If the corresponding standard value is assigned to the activity then the unit should be entered |
| 66 | PF2/WP2 | CRCO | FORML6 | Formula key for costing | S4 HANA | CRCO | FORML6 | Formula key for costing | Mandatory Value direct from current SAP system - Formula used to calculate cost of a work centers activity |
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
| Work Centre | Mapping of legacy Work Center to new Work Centers to target system value |
| Plant | Mapping of legacy Plants to new Plants to target system value |
| Standard Value Key | Mapping of legacy Standard Value Key to new Standard Value Key to target system value |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Ensure DCT tables completeness | SyWay Data Team |
2 | Value Mappings are according to the latest design - <List of Value Mappings> | SyWay Data Team |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
| Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | SyWay Data Team to verify that all fields below meet pass the checks:
|
| Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
Business
Completeness
| Task | Action |
|---|---|
| Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Go to <Load Tool> | SyWay Data Team |
| 2 | Load 3 records for < > to validate if data is loaded successfully without errors | SyWay Data Team |
| 3 | Proceed with full load if steps 2 and 3 are validated | SyWay Data Team |
| 4 | Validate few records loaded by accessing standard transactions from S/4HNA eg. CS04 | SyWay Data Team |
| 5 | Generate post load report if step 5 is validated | SyWay Data Team |
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
| 1 | T001W-Plants/Branches |
| 2 | TC30-Work Centre Category |
| 3 | TC23-Key for use of the work center in the task lists |
| 4 | T499S-Work Centre Location |
| 5 | TC24-Person responsible for the work center |
| 6 | TC21-Standard Value Key |
| 7 | PVKT-Production Supply Area |
| 8 | T430-Control Key |
| 9 | T006-Units of Measurement |
| 10 | TC26-Capacity Category |
| 11 | TKA01-Controlling Areas |
| 12 | OP54-Formula key for costing |
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| 1071 | Activity Type |
| 1074 | Cost Centre |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
| 1 | Work Centre has not been created in a Plant | Ensure the Work centre mapping is correct and or create the Work centre if it is valid |
| 2 | Mapping conversion errors with new data | Ensure the collection file includes any new data values and mapping is correct |
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
| Verify Count | SyWay S2P Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Accuracy
| Task | Action |
|---|---|
| Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Business
Completeness
| Task | Action |
|---|---|
| Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
Accuracy
| Task | Action |
|---|---|
| Conversion Accuracy | Verify that the Resource data in target S/4 HANA were loaded correctly via DSP Migrate post load reports or standard reports from S/4 HANA. |
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.