The purpose of this document is to define the conversion approach to create Portfolio Initiatives in S/4 HANA.

Portfolio Initiatives represents a Program of work in EPPM. A Portfolio Initiative is group of related projects (Portfolio Items) potentially belonging to different Portfolio Buckets for reporting purposes.


Conversion Scope

The scope of this document covers the approach for uploading the  Portfolio Initiatives into S/4HANA following the Portfolio Initiatives Master Data Design Standard 

This is a completely new object for Syensqo with the data being sourced using DCT (Data Collection Template).

No action is required for the Initiative decision points from a data migration perspective.

List of source systems and approximate number of records

SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

DCT

All Records


S/4HANA

?


Replicate Initiative to Other Instances: Migration load to be done to ROW instance with replication to other S/4 Hana instances (CUI and China) done by batch job as per the business process.  To be included in cut-over strategy document. 

In the Global Initiative is created. This means the Initiative includes PPM items (Projects) from other instances. then the Initiative is replicated in CUI and China instance. This is to allow the assignment of China and CUI specific PPM items to the  Global Initiative. The Initiative reporting is performed in the SAC reporting tool.

Additional Information

Multi-language Requirement

Initiative  names and texts will be maintained in English Language only.

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable


Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
INM_INITIATIVEGUIDINM_TV_GUIDUnique IdentifierRAW16System generated
INM_INITIATIVEITEM_GUIDRPM_TV_GUIDGuid for application objectsRAW16System generated
INM_INITIATIVEDPR_GUID

DPR_TV_GUID

Application Object GUIDRAW16System generated
INM_INITIATIVEEXTERNAL_IDINM_TV_EXTIDInitiative IDCHAR24Mandatory
CRM_JESTSTAT

CRM_J_STATUS

System statusCHAR5Mandatory
/RPM/ITEM_DPORTFOLIO_GUID/RPM/TV_GUIDGuid for application objectsRAW16System generated
/RPM/ITEM_DPORTFOLIO_ID/RPM/TV_EXTIDPortfolio IDCHAR24Mandatory
/RPM/ITEM_DBUCKET_ID/RPM/TV_EXTIDParent Bucket IDCHAR24Mandatory
INM_INITIATIVEITEM_TYPE/RPM/TV_ITEM_IDInitiative TypeCHAR15Mandatory
CGPL_TEXTNAMECGPL_TEXT1Initiative NameCHAR40Mandatory
STXLCLUSTDSTXLDUMMY2Initiative DescriptionLRAW7902Conditional
RPM_OBJ_LINKOBJECT_KEYRPM_TV_OBL_OBJECT_KEYKey of the linked objectSTRING0System generated
/RPM/ITEM_DCurrency keyRPM_TV_CURRENCYCurrency keyCUKY5Mandatory
/RPM/ITEM_DPLANNED_STARTRPM_TV_PLAN_STARTPlanned StartDATS8Optional
/RPM/ITEM_DPLANNED_FINISHRPM_TV_PLAN_FINISHPlanned FinishDATS8Optional
/RPM/ITEM_DCAP_PERIODTYPE/RPM/TV_CAP_PERIOD_TYPECapacity Period BreakdownNUMC2Mandatory
/RPM/ITEM_DUNITRPM_TV_UNITUnitCHAR3Mandatory
/RPM/ITEM_DPERIODTYPE/RPM/TV_PERIOD_TYPEFinancial Period BreakdownNUMC2Mandatory
/RPM/ITEM_DZX001HROBJIDProgram ManagerNUMC8Mandatory
/RPM/ITEM_DZX002STEXTProgram Manager Position NameSTEXT40System generated


Data Cleansing

Not applicable, as data object Portfolio initiatives does not exist in legacy system and will be collected specifically for data migration.

IDCriticalityError Message/Report DescriptionRuleOutputSource System








Conversion Process

The high-level process is represented by the diagram below:

Data Privacy and Sensitivity

Not Applicable.

Extraction

Extract data from a source into . 

The data does not exist (or cannot be converted from its current state).  The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Ensure DCT is collected for BucketsData Team
2Perform preliminary completeness checkData Team
3

Raise issues as defects if Req # 1 to 2 are not met

Data Team
4

Repeat Req # 1 to 3 if required

Data Team

Selection Screen

Not Applicable
Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set

None


Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Portfolio initiative data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule
EXTERNAL_IDInitiative IDUnique Identifier for the Initiative, system generated number. (IN-999999)
STATSystem statusRepresent the system status of an initiative.  Default Status is set upon creation of PPM Initiative. It can be modified by the Program Manager at any point during the Initiative's lifecycle.
PORTFOLIO_IDPortfolio IDLocked and Defaulted "Syensqo"
BUCKET_IDParent Bucket IDUnique Identifier for the initiative's parent Bucket. In SyWay it is the ID of the L3 bucket where item is assigned
ITEM_TYPEInitiative TypeInitiative types define the structure and behavior of the portfolio initiative. In Syway there will be only one Initiative type.
TEXT1Initiative NameName of the Initiative.
CLUSTDInitiative DescriptionConditional for initiatives where additional program information is required
PLANNED_STARTPlanned Start

Planned start of Initiative

Optional Format (YYYYMMDD)

PLANNED_FINISHPlanned Finish

Planned Finish of Initiative

Optional Format (YYYYMMDD)

ZX001Program ManagerThis field represent Position of the Program Manager and is mandatory for all Initiatives to determine the responsibility

Object Link - Item to Initiative

Extraction Dependencies

No Dependencies for Extract

Item #Step DescriptionTeam Responsible

None


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business

Data Team

2

Execute and Load and perform Transformation 

Data Team

3

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Data team

4

Review and Validate Error and Preload Reports

Data Team

5

Generate data load count.

Data team

6

Generate Load Files

Data Team

7

Log errors as defects, if any and address resolutions. Close defects.Data team
8Re-transform and re-validate the Pre-load reports if necessary.Data team
9Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.Business
10Analyse and resolve any pre-load defects logged by business.Data team
11Repeat steps 7 to 10 if necessaryData team
12Proceed to pre-load validationsData team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCT
EXTERNAL_IDInitiative IDS/4 HanaINM_INITIATIVEEXTERNAL_IDInitiative IDCopy from source to target system
2DCT
STATSystem statusS/4 HanaINM_INITIATIVESTATSystem statusCopy from source to target system
3DCT
PORTFOLIO_IDPortfolio IDS/4 HanaINM_INITIATIVEPORTFOLIO_IDPortfolio IDCopy from source to target system
4DCT
BUCKET IDParent Bucket IDS/4 HanaINM_INITIATIVEBUCKET_IDParent Bucket IDCopy from source to target system
5DCT


S/4 HanaINM_INITIATIVEITEM_TYPEInitiative TypeDefault "Z001"
6DCT
NAMEInitiative NameS/4 HanaINM_INITIATIVENAMEInitiative NameCopy from source to target system
7DCT


S/4 HanaINM_INITIATIVECURRENCYCurrency keyDefault "EUR"
8DCT
PLANNED_STARTPlanned StartS/4 HanaINM_INITIATIVEPLANNED_STARTPlanned StartCopy from source to target system
9DCT
PLANNED_FINISHPlanned FinishS/4 HanaINM_INITIATIVEPLANNED_FINISHPlanned FinishCopy from source to target system
10



S/4 HanaINM_INITIATIVECAP_PERIODTYPECapacity Period BreakdownDefault to "12"(Annually)
11



S/4 HanaINM_INITIATIVEUNITUnitDefault to "TAG"(Day)
12



S/4 HanaINM_INITIATIVEPERIODTYPEFinancial Period BreakdownDefault to "12"(Annually)
13DCT
ZX001Program ManagerS/4 HanaINM_INITIATIVEZX001Program ManagerCopy from source to target system
14



S/4 HanaINM_INITIATIVEZX002Program Manager Position NameValue Mapping: Position Name from Position
Mapped from table field HRP1000-STEXT where HRP1000-OBJID= ZX001
17DCT
LTEXTInitiative DescriptionS/4 HanaINM_INITIATIVELTEXTInitiative DescriptionCopy from source to target system

List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.

Standard Initiative upload template

Transformation Mapping


Mapping Table NameMapping Table Description

HRP1000

Infotype 1000 DB Table

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Position table HRP1000 has been maintained (HRP1000)
2Ensure all the fields that require value mapping, as stipulated. Mapping tables, have the correct values mapped and imported into tool

Data Team 


Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count

SyWay I2M Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

SyWay I2M Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks

Review Error Reports

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source (DCT) data.

Business

Completeness

TaskAction

Verify Record Count

Business Data Owner/s to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.

Accuracy

TaskAction

Conversion Accuracy

Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
  3. Migration load to be done to ROW instance with replication to other S/4 Hana instances done by batch job as per business process.  To be included in cut-over strategy document.

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Go to RPM_DX_INITIATIVE

SyWay I2M Data Team

2

Load 3 records for < > to validate if data is loaded successfully without errors

SyWay I2M Data Team

3

Load 3 records for < > to validate if data is loaded successfully without errors

SyWay I2M Data Team

4

Proceed with full load if steps 2 and 3 are validated

SyWay I2M Data Team

5

Validate few records loaded by accessing Portfolio Initiative App

SyWay I2M Data Team

6

Generate post load report if step 5 is validated

SyWay I2M Data Team


Load Phase and Dependencies


Configuration


Item #Configuration Item
1Initiative Type 
2Override Default Global Settings  (Master Switches  0002   Switched off - Portfolio & Bucket will have manual ID)
3Define Currency Units
4Define Period Types
5Define Capacity Units
6Configure Fields for Mass Import

Conversion Objects

Object #Preceding Object Conversion Approach
1113Portfolio Bucket Hierarchy

Error Handling


Invalid Data

Invalid Portfolio

Validate DCT default content

Invalid Data

Invalid Bucket ID

Validate DCT default content

Invalid date formatInvalid datesValidate DCT default content


Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

SyWay I2M Data Team to verify the record count created in target S/4 HANA by accessing post load reports or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).

Accuracy

TaskAction
Conversion AccuracyVerify that the Portfolio Initiatives in target S/4 HANA were loaded correctly via Initiative Dashboard App display and table V_INM_INIT_DB in S/4 HANA

Business

Completeness

TaskAction

Verify Count

Extract Initiative details from Initiative dashboard App in S/4 HANA

Accuracy

TaskAction
Verify AccuracyExtract Initiative details from Initiative dashboard App in S/4 HANA


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Portfolio Initiatives is in scope based on data design and any exception requested by business.

Jira Task:



See also

Change log

Version Published Changed By Comment
CURRENT (v. 9) Apr 21, 2026 13:11 NADAR-ext, Parvati
v. 21 Apr 01, 2026 18:56 NADAR-ext, Parvati
v. 20 Mar 24, 2026 11:28 NADAR-ext, Parvati
v. 19 Mar 23, 2026 09:46 NADAR-ext, Parvati
v. 18 Mar 09, 2026 20:01 NADAR-ext, Parvati
v. 17 Feb 19, 2026 09:37 NADAR-ext, Parvati
v. 16 Nov 12, 2025 14:49 NADAR-ext, Parvati
v. 15 Nov 10, 2025 16:31 NADAR-ext, Parvati
v. 14 Oct 06, 2025 16:01 NADAR-ext, Parvati
v. 13 Oct 03, 2025 16:28 NADAR-ext, Parvati

Go to Page History

  • No labels