The purpose of this document is to define the conversion approach to create the WBS - CAPEX, OPEX, Statistical

in S/4 HANA.

In SAP, a WBS element (Work Breakdown Structure element) is a key component in project structure. WBS elements are organized hierarchically and facilitates planning, execution, and control.


Conversion Scope

The scope of this document covers the approach for converting active WBS - CAPEX, OPEX, Statistical from Legacy Source Systems into S/4HANA following the WBS - CAPEX, OPEX, Statistical Master Data Design Standard. tems into S/4HANA: 


The guiding principle is that we should only migrate data necessary to support ongoing business operations. This may also involve cleansing activities within the source systems to align with the migration criteria.

In terms of Historical Data, it will not be migrated except where specific records are required to support application functionality, meet legislative obligations or ensure regulatory compliance.


WBS from the legacy system to be used for the basis of the system include projects from PF2 and WP2.

The data from legacy system includes:

  1. WBS elements not in closed status
  2. Closed CAPEX WBS elements which has current year postings..
  3. The parent WBS elements included in the above.

The data from legacy system excludes:

  1. WBS elements for company codes out of scope


WBS elements can be referenced in transactional data conversions, the conversions which may require WBS elements are

  • Financial postings CNV-9031 Project - Actual GL Line Items (PNL - WBS for AuC) and CNV-9032 GL Line Items (PNL - Internal Order, Statistical/ Opex WBS)
  • Maintenance processing CNV-9005 Work Order
  • Procurement CNV-9044 Purchase Requisition (Oos) and CNV-9045 Open Purchase Orders


Logic:

  1. WBS elements not in closed status
  2. Table PRPS

Key in field "Company Code" in scope.

Result: Object numbers of WBS that are in company codes in scope.

  1. Table JEST:

Field "Object number" = Key in the object numbers of WBS (from Step A)

Field "Status Inactive" = blank

Then filter object number that do not have status I0046 (Closed) or IFO07 (Closed) 

These WBS need to be migrated.

  1. Closed CAPEX WBS element that have cost in current year must also be migrated.

Logic:

  1. Table PRPS

Key in field "Company Code" in scope.

Result: Object numbers of WBS that are in company codes in scope.

  1. Table JEST:

Field "Object number" = Key in the object numbers of WBS (from Step A)

Field "Status Inactive" = blank

Then filter object number that has status I0046 (Closed) or IFO07 (Closed).

Result: Object number with status I0046 (Closed) or IFO07 (Closed).

  1. Table RPSCO:

Field "Object number" = Key in the object numbers of WBS (from Step B) 

Field "Fiscal Year" = Current year

Field "Value Type" = 4

Result = Object numbers that have cost in current year.

These WBS needs to be migrated.

  

  1. Parent WBS elements

For each WBS element with closed status include all superior level WBS elements.  If status of element is not closed superior WBS elements will also be not closed.

  1. Table PRHI:

Field “WBS elements” (All PS_POSNR from PRPS)

IF “UP” is Null no superior objects

Result = Field “UP” additional WBS to be migrated

Repeat until “UP” is Null.


Predecessor Objects


CNV-1024 Project Definition

List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2

S/4 Hana
WP2

S/4 Hana










Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
PRPSPOSIDPS_POSIDWBS elementCHAR24Mandatory
PRPSPS_POSNRPS_POSNRWBS Element internal numberCHAR8Conditional
PRPSOBJNRJ_OBJNRObject NumberCHAR8Conditional
PRPSPOST1PS_POST1DescriptionCHAR40Mandatory
PRPSVERNRPS_VERNRNo. of Person Resp.NUMC8Mandatory
PRPSASTNRPS_ASTNRApplicant no.NUMC8Mandatory
PRPSPBUKRPS_PBUKRCompany codeCHAR4Mandatory
PRPSPKOKRPS_PKOKRControlling areaCHAR4Mandatory
PRPSPRCTRPRCTRProfit CenterCHAR10Mandatory
PRPSPRARTPS_PRARTProject TypeCHAR2Mandatory
PRPSPLAKZPS_PLAKZPlanning ElementCHAR1System
PRPSBELKZPS_BELKZAcct asst elem.CHAR1Mandatory
PRPSFAKKZPS_FAKKZBilling ElementCHAR1Conditional
PRPSFKSTLPS_FKSTLResponsible CCCHAR10Mandatory
PRPSFKOKRPS_FKOKRCA resp. cost centerCHAR4Mandatory
PRPSFABKLFABKLFactory CalendarCHAR2Mandatory
PRPSPWPOSPS_PWPOSCurrencyCUKY5Mandatory
PRPSWERKSWERKS_DPlantCHAR4Mandatory
PRPSSCOPESCOPE_CVObject classCHAR2

Mandatory

PRPSXSTATPS_XSTATStatisticalCHAR1Conditional
PRPSKOSTLPS_KOSTLCCtr posted actualCHAR10Conditional
PRPSIMPRFIM_PROFILInvestment ProfileCHAR6Conditional
PRPSFUNC_AREAFKBERFunctional AreaCHAR16Mandatory
PRPSPSPHIPS_PSPIDProject DefinitionCHAR24Mandatory
PRPSSTUFEPS_STUFELevelCHAR3Mandatory
PRHILEFTPS_PHILEWBS_LEFTNUMC8Conditional
PRHIUPPS_PHIUPWBS_UPNUMC8Conditional
PRPSUSR10USR10PRPSIC RelevantCHAR1Conditional
PRPSZX01
CAPEX/ OPEXchar10Conditional
PRPSZX02
Maintenance event char40Conditional
PRPSZX03
Trading company codeCHAR4Conditional


Data Cleansing

Data cleansing tasks are set out in CNV-1024 which deals with projects and also by definition includes the closing of WBS elements in those projects.

IDCriticalityError Message/Report DescriptionRuleOutputSource System

1026-001

C3

Old projects with no actuals / commitment

If the old projects do not have any actual (and/or) commitments in the past year, set the project to status CLSD (CJ20N)

Old project set to closed

WP2/PF2





















Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into Syniti Migrate
. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state).  The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

1026-001

Confirm scope and extraction approach for each ECC source systems WP2, PF2 (direct DB or manual extract)

Data Team (I2M), Data Team (Syniti)

1026-002

Establish and validate Syniti connectivity to both ECC source systems

Technical / Basis Team, Data Team (Syniti)

1026-003

Perform full data extraction from relevant SAP WBS elements from both source systems WP2, PF2

Data Team (Syniti)

1026-004

Extract WBS via the application layer for additional validations for Manual Data Collection using DCTs

Data Team (I2M)

1026-005

Apply agreed Relevancy Criteria to filter only applicable WBS records for S/4HANA

Data Team (I2M), Data Team (Syniti)

1026-006

In case of restricted access or connectivity issues, receive pre-extracted reports/files from source system team and upload to Syniti Migrate manually

Data Team (I2M), Data Team (Syniti)

1026-008

Perform data quality checks on extracted records (e.g., missing fields, invalid dates, incorrect formats)

Data Team (I2M), Data Team (Syniti)

1026-009

Review and approve extracted data sample sets from each source system before transformation begins

Business / Functional Team


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1
PRPSPOSIDWBS elementS/4 HanaPRPSPOSIDWBS elementOld to new: Conversion Exit
2
PRPSPS_POSNRWBS Element internal numberS/4 HanaPRPSPS_POSNRWBS Element internal numberCopy from source to target system
3
PRPSOBJNRObject NumberS/4 HanaPRPSOBJNRObject NumberCopy from source to target system
4
PRPSPOST1DescriptionS/4 HanaPRPSPOST1DescriptionCopy from source to target system
5
PRPSVERNRNo. of Person Resp.S/4 HanaPRPSVERNRNo. of Person Resp.Old to new
6
PRPSASTNRApplicant no.S/4 HanaPRPSASTNRApplicant no.Old to new
7
PRPSPBUKRCompany codeS/4 HanaPRPSPBUKRCompany codeValue Mapping: Old to New Company Code
8
PRPSPKOKRControlling areaS/4 HanaPRPSPKOKRControlling areaValue Mapping:  Old to New Controlling Area
9
PRPSPRCTRProfit CenterS/4 HanaPRPSPRCTRProfit CenterValue Mapping:  Old to New Profit Centre
10
PRPSPRARTProject TypeS/4 HanaPRPSPRARTProject TypeOld to new
11
PRPSPLAKZPlanning ElementS/4 HanaPRPSPLAKZPlanning ElementCopy from source to target system
12
PRPSBELKZAcct asst elem.S/4 HanaPRPSBELKZAcct asst elem.Copy from source to target system
13
PRPSFAKKZBilling ElementS/4 HanaPRPSFAKKZBilling ElementCopy from source to target system
14
PRPSFKSTLResponsible CCS/4 HanaPRPSFKSTLResponsible CCValue Mapping:  Old to New Cost Centre
15
PRPSFKOKRCA resp. cost centerS/4 HanaPRPSFKOKRCA resp. cost centerValue Mapping:  Old to New Cost Centre
16
PRPSFABKLFactory CalendarS/4 HanaPRPSFABKLFactory CalendarOld to new
17
PRPSPWPOSCurrencyS/4 HanaPRPSPWPOSCurrencyValue Mapping: Currency From Company Code
Company Code Currency from T001-WAERS where BUKRS = PBUKR
18
PRPSWERKSPlantS/4 HanaPRPSWERKSPlantValue Mapping:  Old to New Plant
19
PRPSSCOPEObject classS/4 HanaPRPSSCOPEObject classCopy from source to target system, if source empty Default from Project Profile
20
PRPSXSTATStatisticalS/4 HanaPRPSXSTATStatisticalCopy from source to target system
21
PRPSKOSTLCCtr posted actualS/4 HanaPRPSKOSTLCCtr posted actualValue Mapping:  Old to New Cost Centre
22
PRPSIMPRFInvestment ProfileS/4 HanaPRPSIMPRFInvestment ProfileOld to new
23
PRPSFUNC_AREAFunctional AreaS/4 HanaPRPSFUNC_AREAFunctional AreaOld to new
24
PRPSPSPHIProject DefinitionS/4 HanaPRPSPSPHIProject DefinitionOld to new - updated for load - conversion exit
25
PRPSSTUFELevelS/4 HanaPRPSSTUFELevelCopy from source to target system
26
PRHILEFTWBS_LEFTS/4 HanaPRPSPRHI-LEFTWBS_LEFTWBS Element Mapping
27
PRHIUPWBS_UPS/4 HanaPRPSPRHI-UPWBS_UPWBS Element Mapping






PRPSUSR10IC Relevant
28



S/4 HanaPRPSZX01CAPEX/ OPEX IndicatorCopy from source to target system
29



S/4 HanaPRPSZX02Maintenance event Copy from source to target system
31



S/4 HanaPRPSZX03Trading company codeValue Mapping: Old to New Company Code


Transformation Mapping

Mapping Table NameMapping Table Description
T001Value Mapping: Currency From Company Code
Company CodeValue Mapping: Old to New Company Code
Controlling AreaValue Mapping:  Old to New Controlling Area
Cost CentreValue Mapping:  Old to New Cost Centre
PlantValue Mapping:  Old to New Plant
Profit CenterValue Mapping:  Old to New Profit Centre

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item
1Number Range
2Company Code
3Controling Area
4Project Type
5Factory Calendar
6Currency Code
7Plant
8Investment Profile
9Functional Area
10Trading company code

Conversion Objects

Object #Preceding Object Conversion Approach
1024Project Definition
1074Cost Centre
1070Profit Centre

Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 5) Apr 23, 2026 11:34 KOHN-ext, Jacob
v. 88 Apr 23, 2026 11:07 KOHN-ext, Jacob
v. 87 Apr 23, 2026 06:13 KOHN-ext, Jacob
v. 86 Apr 22, 2026 13:02 KOHN-ext, Jacob
v. 85 Apr 22, 2026 10:39 KOHN-ext, Jacob
v. 84 Apr 22, 2026 09:35 KOHN-ext, Jacob
v. 83 Apr 22, 2026 09:26 KOHN-ext, Jacob
v. 82 Apr 21, 2026 12:52 KOHN-ext, Jacob
v. 81 Mar 11, 2026 12:05 KOHN-ext, Jacob
v. 80 Mar 11, 2026 11:55 KOHN-ext, Jacob

Go to Page History

  • No labels