Purpose

The purpose of this document is to define the conversion approach to create the WBS - CAPEX, OPEX, Statistical

in S/4 HANA.

In SAP, a WBS element (Work Breakdown Structure element) is a key component in project structure. WBS elements are organized hierarchically and facilitates planning, execution, and control.


Conversion Scope

The scope of this document covers the approach for converting active WBS - CAPEX, OPEX, Statistical from Legacy Source Systems into S/4HANA following the WBS - CAPEX, OPEX, Statistical Master Data Design Standard.


The templates will be prepopulated with relevant information from Capital and Budget Managed Operating PS Project Definitions in scope for migration but while these systems serve as sources, extensive enrichment will be necessary to produce properly formatted data load sheets for S/4 HANA.

Additionally WBS elements will be captured directly in the DCT without reference to the source systems


Relevancy Criteria


The data from legacy system to be included in the initial extract includes:

    1. The data from legacy system includes:

        1. Capital projects (e.g. Industrial, Facility, IT and R&I) open as at migration date with postings in the last 3 years or has AUC balance.
        2. Budgeted Operating projects (e.g. Budgeted Maintenance, Marketing, Demolition projects) open as at migration date with postings in the last 3 years.
        3. Closed Capital Projects with postings within the agreed timeframe.
        4. Closed Budgeted Operating projects with postings within the  agreed timeframe. 
        5. Specifically also included are IT and R&I Projects (open as at migration date and (closed projects with postings the agreed timeframe) with postings in the last 3 years

      The data from legacy system excludes

        1. Project Definition in out of scope Company Codes
        2. Project Definitions in out of scope Plants.
        3. Project which has deletion indicator set.
        4. Project marked as closed and not included in C, D and E above
        5. Non Budgeted Maintenance Projects.


Additionally WBS elements without any initial extract will be created in the DCT only, this includes - 

  1. WBS elements with reference to PPM item and template project- 
    1. Capital Lease (Level 2 One WBS per Company Code/Plant, with statistical active)
    2. Direct Asset Purchases (Level 2 WBS per GBU/Company Code/Plant/Cost Centre)
    3. Capitalized Spares (Level 2 WBS per GBU/Company Code/Plant/Cost Centre)
  2. WBS elements with no reference to PPM items -
    1. For the Provisions (One WBS per Company code/Plant)
    2. Intercompany recharge (One Level 1 WBS per Company Code, Level 2 WBS per Trading Partner)


List of source systems and approximate number of records


SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2Relevant WBS elements
S/4 HanaTBD
WP2Relevant WBS elements
S/4 HanaTBD




Additional Information

Multi-language Requirement

The WBS element name is maintained in a single language only, no translation required.

Document Management

Not required.

Legal Requirement

Special Requirements




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
PRPSPOSIDPS_POSIDWBS elementCHAR24Mandatory
PRPSPOST1PS_POST1DescriptionCHAR40Mandatory
PRPSVERNRPS_VERNRNo. of Person Resp.NUMC8Mandatory
PRPSASTNRPS_ASTNRApplicant no.NUMC8Mandatory
PRPSPBUKRPS_PBUKRCompany codeCHAR4

Mandatory

Only 1 Company Code allowed per PSPHI

PRPSPKOKRPS_PKOKRControlling areaCHAR4

Mandatory

PRPSPRCTRPRCTRProfit CenterCHAR10

Mandatory

PRPSPRARTPS_PRARTProject TypeCHAR2Mandatory
PRPSPLAKZPS_PLAKZPlanning ElementCHAR1System Generated
PRPSBELKZPS_BELKZAcct asst elem.CHAR1

Conditional

 It will be checked in below conditions-
1. For WBS elements governed by CAPEX project profiles, activation of this checkbox is mandatory for all elements at level 3 and subordinate levels.
2. For WBS elements governed by Operational, Statistical & Recharge project profiles, activation of this checkbox is mandatory for all WBS elements.

PRPSFAKKZPS_FAKKZBilling ElementCHAR1

Conditional

Only relevant for project profile of project maintained in  PSPHI is a Recharge Project

PRPSFKSTLPS_FKSTLResponsible CCCHAR10Mandatory
PRPSFKOKRPS_FKOKRCA resp. cost centerCHAR4Mandatory
PRPSFABKLFABKLFactory CalendarCHAR2Mandatory
PRPSPWPOSPS_PWPOSCurrencyCUKY5Mandatory
PRPSWERKSWERKS_DPlantCHAR4

Mandatory

Only 1 Company Code allowed per PSPHI

PRPSSLWID
Field keyCHAR

System Generated

PRPSUSR08USR08Exp Capital'ionDAT8

Conditional

Required if IM_PROFIL is not initial


PRPSUSR10USR10Cross SystemCHAR1

Conditional


PRPSSCOPESCOPE_CVObject classCHAR2

System Generated

PRPSXSTATPS_XSTATStatisticalCHAR1

Conditional

PRPSKOSTLPS_KOSTLCCtr posted actualCHAR10

Conditional

This field will be mandatory for all statistical WBS element (XSTAT = X)

PRPSIMPRFIM_PROFILInvestment ProfileCHAR6

Conditional

Required for CAPEX projects (with Project Profile ZPS0001) at Level 3 WBS elements if the CAPEX field is selected (STUFE=3).

PRTEPEINH
Unit of measureCHAR4System Generated
PRTEEEINH
Unit of measureCHAR4System Generated
PRTEIEINH
Unit of measureCHAR4System Generated
PRPSFUNC_AREAFKBERFunctional AreaCHAR16

Mandatory

PRPSPSPHIPS_PSPIDProject DefinitionCHAR24Mandatory
PRPSSTUFEPS_STUFELevelCHAR3Mandatory
PRHIUPPS_PHIUPWBS_UPNUMC8

Conditional

Required if (STUFE>1).

Can only be a WBS element within the same PSPHI.

PRHILEFTPS_PHILEWBS_LEFTNUMC8

Conditional

Can only be a WBS element within the same PSPHI.

PRPSZX01
CAPEX/ OPEXCHAR10

Conditional

For project profile ZPS0001 this field will be mandatory for all STUFE >= 3

All Other profiles mandatory at all levels

PRPSZX02
Maintenance event CHAR40

Conditional

This field will be applicable when PRART =  Turnaround Projects and STUFE = 3

PRPSZX03
Trading company codeCHAR4

Conditional

Required for project profile ZPS0004 when  STUFE = 2


Data Cleansing

Data cleansing tasks are set out in CNV-1024 which deals with projects and also by definition includes the closing of WBS elements in those projects.

IDCriticalityError Message/Report DescriptionRuleOutputSource System

1026-001


Projects with no actuals / commitment / used in account assignment for maintenance orders

If the projects do not have any actual or commitments or settlement assignments in the past year, set the project to status CLSD (CJ20N)

Old project set to closed

WP2/PF2

1026-002
Internal OrdersIF the internal order does not have any actual (and/or) commitments, settlement assignments in the past year set the order status to Closed (Old orders set to closedWP2/PF2














Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into Syniti Migrate
. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state).  The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

1

Confirm scope and extraction approach for each ECC source systems WP2, PF2 (direct DB or manual extract)

Data Team (I2M), Data Team (Syniti)

2

Establish and validate Syniti connectivity to both ECC source systems

Technical / Basis Team, Data Team (Syniti)

3

Perform full data extraction from relevant SAP WBS elements from both source systems WP2, PF2

Data Team (Syniti)

4

Extract WBS via the application layer for additional validations for Manual Data Collection using DCTs

Data Team (I2M)

5

Apply agreed Relevancy Criteria to filter only applicable WBS records for S/4HANA

Data Team (I2M), Data Team (Syniti)

6

In case of restricted access or connectivity issues, receive pre-extracted reports/files from source system team and upload to Syniti Migrate manually

Data Team (I2M), Data Team (Syniti)

8

Perform data quality checks on extracted records (e.g., missing fields, invalid dates, incorrect formats)

Data Team (I2M), Data Team (Syniti)

9

Review and approve extracted data sample sets from each source system before transformation begins

Business / Functional Team


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule
PSPHIProject Definition

Project ID assigned to the WBS elements. Refer table PROJ-PSPHI for allowed values. 

Dropdown values from PROJ-PSPHI

POSIDWBS element

Unique Identifier for the WBS Element as per project coding mask.

The position ID assigned to the WBS element is based on the Project Definition created in S/4.

POST1Description40 character description of the WBSE
VERNRNo. of Person Resp.

This field represents the position of the Person Responsible for a WBS Element and is mandatory field. It will be derived from the Project Definition and can be overwritten.

Dropdown values from TCJ04-PS_VERNR

ASTNRApplicant no.

This field represent the position of the Project Financial Controller. It will be derived from the Project Definition and can be overwritten.

Dropdown values from TCJ05-ASTNR.

PRCTRProfit Center

In Syway, Profit Center represent a plant or a site or generic for GBU and inherited from the Project Definition

Dropdown values from CEPC-PRCTR

PRARTProject TypeIt is an attribute that serve as classification field that help to define the nature, purpose, and governance of a WBS element. They are useful for reporting, controlling, and compliance alignment.
Dropdown values from TCJ1-PRART
BELKZAcct asst elem.

This indicator enables financial posting on the WBS element.


FKSTLResponsible CC

Cost Center responsible for delivery of work. Required for WBS elements of Expense Project (Budget-managed) only.

Dropdown values from KOSTL-KOSTL for allowed values.

WERKSPlantPlant represent a site of the WBS element. Mandatory for all WBS elements.
USR08Exp Capital'ionExpected Capitalization date marks the anticipated execution of the AUC final settlement, restricted to WBS elements that include an Investment Profile.
USR10Cross SystemThis checkbox field, will be selected when intercompany services are needed for a WBS element.
KOSTLCCtr posted actual

This field represents the receiver Cost Center of actual cost for any actual financial posting on the WBS element.

Dropdown values from KOSTL-KOSTL


IMPRFInvestment Profile

Investment Profile on WBS element is used to enable auto generation of AuC w.r.t. predefined asset class.

Dropdown values from TAPRF-IVPRO for allowed values.

FUNC_AREAFunctional AreaFunctional Area is an organizational unit used to classify expenses based on their purpose or function.
Dropdown values from TFKB-FKBER.
STUFELevelIn a project, WBS elements are structured across multiple levels to form a tree-like hierarchy for better project controlling and monitoring.
UPWBS_UPThis field represents the immediate superior WBS element (parent node) required for establishing parent-child relationships in the WBS hierarchy.
LEFTWBS_LEFTThis field represents the left-adjacent WBS element in the same hierarchy level required for navigating sibling relationships within a WBS hierarchy.
ZX01CAPEX / OPEXThis field identifies expense is CAPEX or OPEX.
For project profiles ZPS0002 & ZPS0003 this field will be default to OPEX.
ZX02Maintenance event

This field is used to determine the settlement rule receiver for the relevant maintenance Work Order.

This field will be applicable when Project Type = Turnaround Projects at level 3 WBS element

Dropdown values from 

ZX03Trading company code

This field will be applicable when Project Type = Intercompany Recharge. Mandatory at Level 2 WBS to determine the trading company for intercompany recharges
Dropdown values from T001-BURKS.


Instance

Instance where the project definition is to be loaded.

(Field required in DCT)

In conjunction with DCT business user will be provided with Person Responsible / Applicant list for reference.


Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti Migrate
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business

Data Team

2

Execute and Load and perform Transformation 

Data Team

3

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Data team

4

Review and Validate Error and Preload Reports

Data Team

5

Generate data load count.

Data team

6

Generate Load Files

Data Team

7

Log errors as defects, if any and address resolutions. Close defects.

Data team

8

Re-transform and re-validate the Pre-load reports if necessary.

Data team

9

Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

Business

10

Analyze and resolve any pre-load defects logged by business.

Data team

11

Repeat steps 7 to 10 if necessary

Data team

12

Proceed to pre-load validations

Data team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1PF2/WP2PRPSPOSIDWBS elementS/4 HanaPRPSPOSIDWBS elementOld to new: Conversion Exit
2PF2/WP2PRPSPOST1DescriptionS/4 HanaPRPSPOST1DescriptionCopy from source to target system
3PF2/WP2PRPSVERNRNo. of Person Resp.S/4 HanaPRPSVERNRNo. of Person Resp.Value Mapping Responsible Person to new Person Responsible Position ID
4PF2/WP2PRPSASTNRApplicant no.S/4 HanaPRPSASTNRApplicant no.Value Mapping Applicant to new Applicant Position ID
5PF2/WP2PRPSPBUKRCompany codeS/4 HanaPRPSPBUKRCompany codeValue Mapping: Old to New Company Code
6PF2/WP2PRPSPKOKRControlling areaS/4 HanaPRPSPKOKRControlling areaValue Mapping:  Old to New Controlling Area
7PF2/WP2PRPSPRCTRProfit CenterS/4 HanaPRPSPRCTRProfit CenterValue Mapping:  Old to New Profit Centre
8PF2/WP2PRPSPRARTProject TypeS/4 HanaPRPSPRARTProject TypeValue Mapping: Old to new project type
10PF2/WP2PRPSBELKZAcct asst elem.S/4 HanaPRPSBELKZAcct asst elem.Copy from source to target system
11PF2/WP2PRPSFAKKZBilling ElementS/4 HanaPRPSFAKKZBilling ElementCopy from source to target system
12PF2/WP2PRPSFKSTLResponsible CCS/4 HanaPRPSFKSTLResponsible CCValue Mapping:  Old to New Cost Centre
13PF2/WP2PRPSFKOKRCA resp. cost centerS/4 HanaPRPSFKOKRCA resp. cost centerValue Mapping:  Old to New Controlling Area
14PF2/WP2PRPSFABKLFactory CalendarS/4 HanaPRPSFABKLFactory CalendarCopy from Project Definition
15PF2/WP2PRPSPWPOSCurrencyS/4 HanaPRPSPWPOSCurrencyCopy from Project Definition
16PF2/WP2PRPSWERKSPlantS/4 HanaPRPSWERKSPlantValue Mapping:  Old to New Plant
18PF2/WP2PRPSKOSTLCCtr posted actualS/4 HanaPRPSKOSTLCCtr posted actualValue Mapping:  Old to New Cost Centre
19PF2/WP2PRPSIMPRFInvestment ProfileS/4 HanaPRPSIMPRFInvestment ProfileValue Mapping: Old to new Investment Profile
20
PROJFUNC_AREAFunctional AreaS/4 HanaPRPSFUNC_AREAFunctional AreaCopy from Project Definition PROJ-FUNC_AREA
21PF2/WP2PRPSPSPHIProject DefinitionS/4 HanaPRPSPSPHIProject Definition

Load Dependent: PSPID: Old Project to new project mapping


22PF2/WP2PRPSSTUFELevelS/4 HanaPRPSSTUFELevel
23PF2/WP2PRHILEFTWBS_LEFTS/4 HanaPRPSPRHI-LEFTWBS_LEFT
24PF2/WP2PRHIUPWBS_UPS/4 HanaPRPSPRHI-UPWBS_UP
25PF2/WP2PRPSIMPRFInvestment ProfileS/4 HanaPRPSZX01CAPEX / OPEX

If IMPRF Profile "" then "Opex"

Else "Capex"

26DCTPRPSPSPHIProject DefinitionS/4 HanaPRPSPSPHIProject DefinitionCopy from source to target system
27DCTPRPSPOSIDWBS elementS/4 HanaPRPSPOSIDWBS elementCopy from source to target system
28DCTPRPSPOST1DescriptionS/4 HanaPRPSPOST1DescriptionCopy from source to target system
29DCTPRPSVERNRNo. of Person Resp.S/4 HanaPRPSVERNRNo. of Person Resp.Copy from source to target system
30DCTPRPSASTNRApplicant no.S/4 HanaPRPSASTNRApplicant no.Copy from source to target system
31DCT


S/4 HanaPRPSPBUKRCompany code

Copy from Project Definition PSPHI.


32DCT


S/4 HanaPRPSPKOKRControlling areaCopy from Project Definition PSPHI.
33DCTPRPSPRCTRProfit CenterS/4 HanaPRPSPRCTRProfit CenterCopy from source to target system
34DCTPRPSPRARTProject TypeS/4 HanaPRPSPRARTProject TypeCopy from source to target system
35DCTPRPSBELKZAcct asst elem.S/4 HanaPRPSBELKZAcct asst elem.Copy from source to target system
36DCT


S/4 HanaPRPSFAKKZBilling ElementFor project profile Recharge and STUFE = 2 Billing Element = X
37DCTPRPSFKSTLResponsible CCS/4 HanaPRPSFKSTLResponsible CCCopy from source to target system
38DCT


S/4 HanaPRPSFKOKRCA resp. cost centerCopy from source to target system
39DCTPRPSWERKSPlantS/4 HanaPRPSWERKSPlantCopy from source to target system
40DCT


S/4 HanaPRPSXSTATStatisticalCopy from Project Definition PSPHI.
41DCTPRPSKOSTLCCtr posted actualS/4 HanaPRPSKOSTLCCtr posted actualCopy from source to target system
42DCTPRPSIMPRFInvestment ProfileS/4 HanaPRPSIMPRFInvestment ProfileCopy from source to target system
43DCTPRPSFUNC_AREAFunctional AreaS/4 HanaPRPSFUNC_AREAFunctional AreaCopy from source to target system
45DCTPRPSSTUFELevelS/4 HanaPRPSSTUFELevelCopy from source to target system
46DCTPRPSLEFTWBS_LEFTS/4 HanaPRPSPRHI-LEFTWBS_LEFTCopy from source to target system
47DCTPRPSUPWBS_UPS/4 HanaPRPSPRHI-UPWBS_UP

Copy from source to target system


48DCTPRPSUSR08Exp Capital'ionS/4 HanaPRPSUSR08Exp Capital'ionCopy from source to target system
49DCTPRPSUSR10Cross SystemS/4 HanaPRPSUSR10Cross SystemCopy from source to target system
50



S/4 HanaPRPSZX01CAPEX/ OPEX

If IMPRF Profile "" then "Opex"

Else "Capex"

51DCTPRPSZX02Maintenance event S/4 HanaPRPSZX02Maintenance event Copy from source to target system
52DCTPRPSZX03Trading company codeS/4 HanaPRPSZX03Trading company code

Copy from source to target system


54



S/4 HanaPRPSOBJNRObject NumberSystem Generated
55



S/4 HanaPRPSFABKLFactory CalendarCopy from Project Definition
56



S/4 HanaPRPSPWPOSCurrencyCopy from Project Definition
57



S/4 HanaPRPSSCOPEObject classCopy from Project Definition

List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.


Logic for the WBS element mapping between old and new.


Transformation Mapping

Mapping Table NameMapping Table Description
T001Value Mapping: Currency From Company Code
Company CodeValue Mapping: BUKRS: Old Company Code to New Company Code
Controlling AreaValue Mapping:  Old to New Controlling Area
Cost CentreValue Mapping:  Old to New Cost Centre
PlantValue Mapping:  Old Plant to New Plant
Profit CenterValue Mapping:  Old to New Profit Centre
ApplicantValue Mapping: Applicant to new Applicant Position ID
Person ResponsibleValue Mapping Responsible Person to new Person Responsible Position ID
Investment ProfileValue Mapping: Investment Profile Old to New
Company Code Instance/GroupValue Mapping: Company Code to Group and Instance

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Ensure all the fields that require value mapping, as stipulated. Mapping tables, have the correct values mapped and imported into tool.Syway Data Team




Pre-Load Validation

Project Team


  1. WBS elements with reference to PPM item and template project- 
    1. Capital Lease (Level 2 One WBS per Company Code/Plant)
    2. Direct Asset Purchases (Level 2 WBS per GBU/Company Code/Plant/Cost Centre)
    3. Capitalized Spares (Level 2 WBS per GBU/Company Code/Plant/Cost Centre)
  2. WBS elements with no reference to PPM items -
    1. For the Provisions (One WBS per Company code/Plant), 
    2. Intercompany recharge (One Level 1 WBS per Company Code, Level 2 WBS per Trading Partner)



Completeness

TaskAction
Generation of
Pre-load report
Check all the required fields

Verify Record Count

SyWay I2M Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

SyWay I2M Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks
  5. WBS Ids aligned with different number ranges per instance.

Review Error Reports

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source (DCT) data.


Business

Completeness

TaskAction

Verify Record Count

Business Data Owner/s to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets


Accuracy

TaskAction

Conversion Accuracy

Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Load using transaction CNMASSCREATE or Migration cockpit

Data Team

2

Load 3 records for < > to validate if data is loaded successfully without errors

Data Team

3

Load 3 records for < > to validate if data is loaded successfully without errors

Data Team

4

Proceed with full load if steps 2 and 3 are validated

Data Team

5

Validate few records loaded by accessing CN41N report

Data Team

6

Generate post load report if step 5 is validated

Data Team


Load Phase and Dependencies

Configuration

Item #Configuration Item
1Project Coding Mask
2Company Code
3Controlling Area
4Project Type
5Factory Calendar
6Currency Code
7Plant
8Investment Profile
9Functional Area
10Trading company code
11Define Tolerance Limits
12WBS Status Profile
13Validation
14Substitution
15Settlement Profile
16Budget Profile
17Project Profile

Conversion Objects

Object #Preceding Object Conversion Approach
1024Project Definition
1074Cost Centre
1073Profit Centre

Error Handling

Error TypeError DescriptionAction Taken
Invalid DataProject Definition does not existCorrect upload data, review load of CNV-1024 
Invalid DataWBS Element already existCorrect upload data.
Invalid DataPerson Responsible does not existCorrect upload data
Invalid DataApplicant does not existCorrect upload data
Invalid DataMore that one WBS per GBU/Company Code/Plant for Capital Lease ProjectRemove Duplicate values from DCT
Invalid DataMore that one WBS per GBU/Company Code/Plant for Direct Asset Purchase ProjectRemove Duplicate values from DCT
Invalid DataMore that one WBS per GBU/Company Code/Plant for Capital Spares ProjectRemove Duplicate values from DCT


Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

SyWay I2M Data Team to verify the record count created in target S/4 HANA by accessing post load reports or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

Verify that the Project Definition in target S/4 HANA were loaded correctly via Project Builder display and table PROJ 


Business

Completeness

TaskAction
Verify template Project data - Project Definition Extract data from PS report CN41N in S/4 Hana

Accuracy

TaskAction
Verify template Project data - Project Definition Extract data from PS report CN41N in S/4 Hana


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • WBS - CAPEX, OPEX, Statistical is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 18) May 07, 2026 10:23 KOHN-ext, Jacob
v. 91 May 04, 2026 12:27 KOHN-ext, Jacob
v. 90 May 04, 2026 12:02 KOHN-ext, Jacob
v. 89 Apr 23, 2026 11:34 KOHN-ext, Jacob
v. 88 Apr 23, 2026 11:07 KOHN-ext, Jacob
v. 87 Apr 23, 2026 06:13 KOHN-ext, Jacob
v. 86 Apr 22, 2026 13:02 KOHN-ext, Jacob
v. 85 Apr 22, 2026 10:39 KOHN-ext, Jacob
v. 84 Apr 22, 2026 09:35 KOHN-ext, Jacob
v. 83 Apr 22, 2026 09:26 KOHN-ext, Jacob

Go to Page History

  • No labels