Page tree



Info

Table that can be used to replace a wrong integrated costing



Definition

When the unit integrated costing calculated by the system is wrong. For instance when the standard costing is wrong in WP1 and it is too late to rerun it, it is possible to use the table C - Manual Update of IM Cost Unit to replace the integrated costing calculated by the system by a new one. 




How to upload the the manual table in BW

Prepare the file to be uploaded

Prepare the data to be uploaded in WBP using the dedicated template:

C. Manual Update of IM Cost UNIT.xlsx



Costing DateCosting variantPlantMaterialLot SizeUnitAmount CPAmount CP RAWAmount CP PACKAmount CP TOLLINGAmount CP UTILITIESAmount CNPAmount AMOAmount FreightAmount DutyCurrency keyIncident requestDescript°
MANDATORY YES/NO YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO YES NO NO
AUTHORIZATION CHECKN/AN/A YES YES N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A



Upload the file

Once everthing is ready, open WBP and enter the transaction ZBW_INT_MARGIN - Integrated margin process in the search bar and enter 

Click on the button C - Manual Update of IM Cost Unit

  1. Select the file to be uploaded.


When the excel file was chosen, the button preview and check file are available.

“Preview” show the file uploaded:



  • Click . If the file was well prepared, the message "Your file is OK and ready to be loaded in BW." is displayed.

  • If there was an error in the file, the list of errors are displayed with the description of the problem to be solved. 

  • When the file is ready to be loaded, click
  • When the loading is finished a message appears

image-2024-12-3_17-1-48.png



Note

You need to request BW team to perform a reload of COPA documents required


The best way to get IT support is to use the new Service One Platform.