| Status | Revision in Progress |
|---|---|
| Owner | CASTRO MONCAYO-ext, Jose Luis |
| Stakeholders |
Purpose
The purpose of this document is to define the conversion approach to create in S/4 HANA.
Conversion Scope
Material Master - PPDS Views are now used to make some of the Planning activities in both systems (PF2 & WP2). Most of the materials used in the planning process have these views updated, as they contain relevant information about the planning process. The aim is to get the conversion into S4 HANA in a standard way, so it can be used in the new planning processes already defined by the functional team and validated with the business.
While PF2 and WP2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design. As this is a new view a complete new DCT will be needed, as NO migration data on Scope.
We need to create a NEW Layout to fill in for the new data per material / Plant combination
The data from legacy system may include:
- As per materials, the rule for this view will follow the rules for the CNV-2019 CNV-2019 Materials - Basic Data View
- Additional to this, the following criteria needs to be followed to create the view: All Direct materials as MRP type X0, will need to have PPDS view and the data to complete the design process in Syensqo.
- All ZMAT materials and Z700 will be called in S4HANA ZDIR. These material types will be the ones to have PPDS View.
The data from legacy system excludes:
- All materials flagged for deletion
- Any blocked or obsolete materials
- Any inactive materials that are out of scope
The data from legacy system includes:
- N/A
- N/A
The data from legacy system excludes:
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | All planning materials | 15,000 | S4 HANA | TBD |
| WP2 | All Planning materials | 30,000 | S4 HANA | TBD |
| N/A | ||||
Additional Information
Multi-language Requirement
System Multi-language standard definition
Document Management
N/A
Legal Requirement
N/A
Special Requirements
N/A
N/A
Target Design
Fields in Scope for PPDS view
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| MARA | MATNR | MATNR | Material Number | CHAR | 18 | R |
| T001W | WERKS | WERKS | Plant ID | CHAR | 4 | R |
| MARA | MEINS | MEINS | Unit of measure in which stock of the material is managed. | UNIT | 3 | R |
| MARA | PPSKZ | PPSKZ | Indicator for Advanced Planning | CHAR | 1 | C |
| MARC | SCM_PRIO | /SAPAPO/PRIO | Priority of Product | INT1 | 3 | C |
| MARC | SCM_RRP_TYPE | /SAPAPO/PPS_PLANNING_TYPE | PP Planning Procedure | CHAR | 1 | C |
| MARC | SCM_RRP_SEL_GROUP | /SAPAPO/RRP_SEL_GROUP | Planning Group | CHAR | 2 | C |
| MARC | SCM_PEG_FUTURE_ALERT | /SAPAPO/DM_PEGGING_FUTUR_ALERT | Alert threshold for early receipts | DEC | 11 | C |
| MARC | SCM_PEG_PAST_ALERT | /SAPAPO/DM_PEGGING_PAST_ALERT | Alert Threshold for Lateness | DEC | 11 | C |
| MARC | SCM_GET_ALERTS | /SAPAPO/GET_ALERTS_FOR_PROD | Product Alerts | CHAR | 1 | C |
Data Cleansing
No Data to clean as this is a new view in the Materials
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| N/A | |||||
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into . There are 2 possibilities:
- The data exists. connects to the source and loads the data into . There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.