Page tree


You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

1.0 Overview


Solvay aims to centralize and automate the measurement of operational performance through a unified dashboard, leveraging core systems such as SAP. This dashboard will serve as a comprehensive source of truth for all operational KPIs, enabling diagnostics, deep dives, and performance dialogues at all levels within the organization. In this dashboard, 13 KPIs from 5 industrial domains are presented.



2.0 Business Processes


The 13 measures given by Operation Dashboard reports are:

Section

Key Figure

Definition

Data Rules

HSE

TRII 

Reportable Injuries and Illness (RII) rate

Number of work-related Injury or Illness resulting from accidents requiring a treatment greater than a First Aid Injury. It represents the number of reportable injuries per hours of work in the past 12 months.


HSE

PSI (Process Safety Incident (PSI) rate)

Number of process safety incidents per hour of work in the past 12 months, where a process safety incident is an event involving a chemical or a chemical process, and generating a release of chemicals or energy.


HSE

GHG Emissions - GHG emissions scope 1 & 2

Amount of kt CO2 equivalent emitted by GBU-Site every month. It includes CO2 resulting from energy (fuels, electricity, steam) and CO2 equivalent emitted by processes (Methane, Nitrous oxide).

Cerise:

  • Scope 1 = CO2 emission in Scope 1 NRJ ([K_SC1EMIS]) + CO2 emission in Scope 1 Process ([K_SC1EMPR])
  • Scope 2 = CO2 emission in Scope 2 ([K_SC2EMIS])

Pure:

Only two Sites (and 2 components) should be considered:

  • Site: Green River (532) (Methane - E12600)
  • Site: Paulinia (1317) (Nitrous oxide - E12104)

Costs

Fixed Costs

Fixed Costs measures the company's fixed expenses, which remain constant regardless of production volume or sales levels.

Once information was already available on GCP, a copy of the connector was created.

Costs

Variable Costs

Variable Costs are expenses that fluctuate directly with the level of production or sales. Unlike fixed costs, variable costs increase or decrease depending on the volume of goods or services produced. This cost category is essential for understanding the expenses directly associated with generating revenue and plays a crucial role in pricing, budgeting, and profit margin analysis.

Once information was already available on GCP, a copy of the connector was created.

Costs

Wave

Overview of all savings initiated by transformation activities within the STAR FACTORY program. Track all the transformation savings of the Group GBU and site level.

Once information was already available on GCP, a copy of the connector was created.

Costs

Headcount

Full Time Equivalent Headcount working in an establishment with a Group Work contract (temporary staff, employed and paid by a staff agency, are excluded).

Number of active company employees following the rules:

a) Employee status: Active, Active Leave

b) Employee class: Regular, Impatriate, Semi-retiree


Once information was already available on GCP, a copy of the connector was created.

Costs

Inventory Value

Inventory of raw materials, work in progress, semi-finished and finished goods.


Quality

Customer Complaints Rate

Provides a number with which to compare whether the rate of complaints is increasing or decreasing based on the ratio with the number of deliveries. This rate serves as an indicator of customer satisfaction, product quality, and service performance.

The Customer Complaints that should be considered:

  • Justified complaints

SLV_Justified__c = ‘Y’

  • External complaints

SLV4_1_Internal_Complaint__c = ‘N’)

  • Record Type:

CASE_RECORD_TYPE = 'Open Complaint' or CASE_RECORD_TYPE = 'Close ReadOnly Complaint'

Productivity

OEE - Overall Equipment Effectiveness

Overall Equipment Effectiveness measures the perf. of the asset (and not the product!) at the bottleneck. It represents the rate of production by the maximum sustainable production ever achieved.


Supply Chain

OTIF

To measure the accuracy and punctuality of order deliveries in terms of both timing and completeness. This KPI reflects how well a company meets customer expectations by assessing if orders are delivered exactly when expected (On-Time) and in the correct quantities (In-Full). On Time (an order is considered to be delivered on time when it is delivered at the right time).

On Time (an order is considered to be delivered on time when it is delivered at the right time)

In Full (an order is considered in full when it is delivered with the right quantity). 

Once information was already available on GCP, a copy of the connector was created.

Supply Chain

Forecast Accuracy

Evaluates the ability to get visibility on customers' demand in terms of quantity.

Once information was already available on GCP, a copy of the connector was created.

Supply Chain

DOS

This is a major Group KPI as it is linked to Working Capital and cash delivery. It is measured in Days of Supply. It represents the days of sales in inventory.

Once information was already available on GCP, a copy of the connector was created.




3.0 Application Feature Overview


Reports

Prompts

Source Data

HSE

Calendar Year/Month

Site

GBU

PO2 flag :ECO/SCO*


*For GHG it is important to show the evolution for a couple of years for sites. ECO vs SCO is related to company and not sites. In a couple of cases (Cincinnatti, Chicago, Livorno,... ) the emissions were reported in a company that is now SCO but they concern activities that are now in ECO. This is why it is important to also extract SCO data to include all GHG related to the site to be able to compare present data with past data.

TRII: Os_data, core_hd_monthly

PSI: Ps_data, core_hd_monthly

This information was already available on GCP project solvay-ind-conso-prod , schema “ ehs_pure “ by the name of “Core_HD_Monthly”, ”PS_data” and “OS_data"

GHG Emissions:

Costs

Calendar Year/Month

Site

GBU

PO2 flag: ECO

Fixed and Variable Costs: 

GCP (BigQuery) Finance Data upload - Google Sheets

This information was already available on GCP project prj-data-industrial-dash-dev, by the name of “ODS_BWH_0000_F002_F_M_fixedcosts ” and ”ODS_BWH_0000_F002_F_M_variablecosts” 

WAVE

This information was already available on GCP project prj-data-industrial-dash-dev, by the name of “ODS_FIL_0000_F001_F_M_wave_project_star ”, ”ODS_FIL_0000_F002_F_M_wave_activity_star” ,"ODS_FIL_0000_F003_F_M_wave_sustain_impact_star" and "ODS_FIL_0000_F004_F_M_wave_impact_star"

Headcount:

  • DO_BW_QRY_CPHRPAHDM_0005 (People at Solvay)

This information was already available on GCP project  prj-data-dm-hr , by the name of “V_FACT_HR_Workforce”

Inventory Value

  • BW_QRY_CPIMMM01_0002 (Stock Analysis)
  • BW_QRY_CPMMIM02_0001 (SMOG)

Quality

Calendar Year/Month

Site

GBU

PO2 flag: ECO/SCO

Customer Complaint

  • Case (Salesforce)
  • BW_QRY_MVSDSO57_0002 (Deliveries - SAP BW)

Productivity

Index

PO2 flag: ECO

OEE

• OEE database for Power BI - DEV - Google Sheets (link)

• OEE database for Power BI - PROD - Google Sheets (link)

Supply Chain

SLK_KEY

PO2 flag: ECO*


* OTIF + Forecast Accuracy - PO2 flag: ECO + SCO

* DIO - Historical data includes Scope SCO data

OTIF + Forecast Accuracy

This information was already available on GCP project prj-dashb-rational-dev, by the name of “V_DM_gsc” 

DIO:

This information was already available on GCP project bi-gcp-sandbox.DataOcean_dt, by the name of “v_Solvay_Monthly_Inventory_Performance-Data_Finance_Snapshot_mv_pbi”

4.0 Functional Specification

4.1 General Data/Calculations 

Please find below general dimensions, common to all Operational KPIs:

Dimension

Site

GBU

Date


4.1.2 General Data/Calculations 

Please find below specifics dimensions for specific reports:

Section

Dimension

Definition

HSE

Energy_or_process

Data coming from Cerise is filled with “Energy”; while data coming from Pure is filled with “Process”

HSE

Cerise_pure_attribute

This field indicates what measure is presented on “Value”. It can assume 3 values:
  • Scope 1
  • Scope 2
  • T_CO2_eq

Costs

metric

List of the different metrics in analysis

Costs

mappedline

Sub-category of rubriques

Costs

comparison

Type of comparision analysis

Costs

rubrique

List of considered Rubriques

Quality

Severity

Represents the type/level of Severy each Complaints was classified to.

Supply Chain

Material

Alphanumeric key uniquely identifying the material.

Supply Chain

Distribution Channel

The distribution channel represents the channel through which salable materials or services reach customers. (Can be called Market for financial) - only relevant to WP1.

Supply Chain

Product

Statistical regrouping of commercial articles, made abstraction of their conditioning, quality, brand names, and their centre of production.

The last 5 digits of a material group.

Supply Chain

Ship To

Shipment destination.

Supply Chain

Plant

A Plant is a site where the company operates. It can be an internal production site, a site operated by a toller, a storage site, or even a pure administrative site. It is used to locate costs and production lines, and to determine the industrial origin of the material batches.

Supply Chain

Sales Rep

Sales/Replenishment

Supply Chain

Ship to Ka

The Ship-to Key account is by default the Corporate Ship-to Group. However it can be changed for a specific product when the end-user account is different (ex Distributor or Warehouse).

Supply Chain

Product Hierarchy

Categorization of Product

Supply Chain

Type of losses

List of the different type of losses

Supply Chain

Cluster

Additional cathegorization groups

Supply Chain

Unit

Units of measure are the standard values used to describe measurements such as length, area, volume, mass, and time. 


4.2 Process Detail 

4.2.1.1  Report/Process Definition


Domain

Health, Safety, and Environment (HSE)

Existing Documentation

InDocs HSE Home - SOLVAY

4.2.1.2 KPI's/Calculations/Indicators 

Indicators available for HSE report

Regarding TRII and PSI KPIs, no transformations were applied on GCP.  However, here is the conditions and rules that should be considered for calculation:

TRII

Only work-related incidents classified as "RII" should be considered:

  • Workflow_state != { 'Deleted'}
  • Work_related = {'Work related'}
  • Classif = {'RII'}
    • Table: V_os_data (Pure)

Regarding the total hours worked:

  • Indicator='WKHR_EMPL','WKHR_CONTR'
    • Table: V_core_hd_montly (Pure)

Calculation formula:

PSI

Only process safety incidents with severities classified as 'Medium','High','Critical' should be considered:

  • Global_Severity IN ('Medium','High','Critical')
    • Table: V_ps_data (Pure)

Regarding the total hours worked:

  • Indicator='WKHR_EMPL','WKHR_CONTR'
    • Table: V_core_hd_montly (Pure)

Calculation formula:

Regarding GHG Emissions:

Indicators/KPI's

Definition

Calculation/Extraction of data

Value

Represents the amount of kt CO2 equivalent emitted by GBU-Site every month. It includes CO2 resulting from energy (Scope 1 and Scope 2) and CO2 equivalent emitted by processes ( T_CO2_eq ).

If Cerise_pure_attribute =

  • Scope 1 = [K_SC1EMIS] + [K_SC1EMPR] 

  • Scope 2 = [K_SC2EMIS] 

If Cerise_pure_attribute =

  • T_CO2_eq = [ T.CO2-eq]

4.2.2.  Report/Process Definition


4.2.3. KPI's/Calculations/Indicators 

Indicators available for Costs report

Indicators/KPI's

Definition

Calculation/Extraction of data

FTE

Full Time Equivalent Headcount working in an establishment with a Group Work contract (temporary staff, employed and paid by a staff agency, are excluded).

SUM([Active_Internal_Workforce_FTE])

Quantity (PUQ) VKG

T otal Stock Quantity (Unit selected in Prompt)

 

Value Standard (SMOG)

Blocked + Obsolete + Slow moving (LC)


Value (Healthy)

Total Stock Value - SMOG Value


Quantity (Healthy)

Total Stock Quantity - SMOG Quantity


Blocked Value (SMOG)

Blocked Stock Value


Slow Moving Value (SMOG)

Slow moving Stock Value


Obsolete Value (SMOG)

Obsolete Stock Value


Blocked Qty. (SMOG)

Blocked Stock Quantity


Obsolete Qty. (SMOG)

Obsolete Stock Quantity Slow Moving Stock Quantity



4.2.2.  Report/Process Definition


Domain

Quality

Application

BW_QRY_MVSDSO57_0002 Query

Case query

Provider

SAP BW

Salesforce

4.2.3. KPI's/Calculations/Indicators 

Indicators available for Quality report

Indicators/KPI's

Definition

Calculation/Extraction of data

ACT_CC

Current Month Number of Customer Complaints

COUNT( DISTINCT Id)

WHERE

  • SLV4_1_Internal_Complaint__c = false 
  • SLV_Justified__c = ‘Yes’
  • RecordTypeId IN ('012240000006UNXAA2','012240000006UNSAA2')

ACT_NB_DELIVERIES

Current Month Number of Deliveries

DISTINCT(COUNT delivery_number)

ACT_R12_CC

Rolling Date 12 months Number of Customer Complaints



ACT_R12_NB_DELIVERIES

Rolling Date 12 months Number of Deliveries


4.2.2.  Report/Process Definition

Domain

Productivity

4.2.3. KPI's/Calculations/Indicators 

Indicators available for Productivity report : 

Indicators/KPI's

Definition

production__t_m_

Production (t/m)

sustainable_mdc__t_d_

Sustainable MDC

(t/d)

volume_mdc_total__t_m_

Volume MDC total (t/m)

oee

OEE

oee_calculated

OEE calculated

diff_oee

diff OEE

performance_index__net_oee_

Performance index (Net OEE)

check_total_oee___losses

Check Total OEE + Losses

volume_value

Volume value 

percentage_value

Percentage Value


4.2.2.  Report/Process Definition


4.2.3. KPI's/Calculations/Indicators 

Indicators available for Supply Chain report: 

Indicators/KPI's

Definition

Gross History

Customer Demand

Final Forecast

Total on quantity forecast to be shipped.

Forecast Accuracy

This figure measures the gap between the Gross History and the forecasted quantities.

Forecast Bias

 It measures the tendency for a forecast to be consistently higher or lower than the actual value.

OTIF-Customer (Delivered)

It measures our capacity to deliver our customers at destination at the right time, with the right quantity. It evaluates Customer satisfaction.

OTIF-Departure Plant

It measures our capacity to make the products available at departure location at the right time, with the right quantity. It evaluates our ability to deliver according to customer requirements.