- Created by Alexandra Lepercq, last modified on Oct 30, 2015
You are viewing an old version of this page. View the current version.
Compare with Current View Page History
« Previous Version 42 Next »
Costing Responsability Area
Training
Description Responsibility Area & Process
Assessment cycles
An assessment cycle is used in SAP to assign all primary cost elements and secondary cost elements from a sending cost center to the receiver cost center.When you want to transfer costs from one cost center to another through an assessment cycle, sap use a secondary cost element and accumulates all the primary cost and secondary cost and send it to the receiving cost center.
Definition
An assessment cycle is used in SAP to assign all primary cost elements and secondary cost elements from a sending cost center to the receiver cost center. When you want to transfer costs from one cost center to another through an assessment cycle, sap use a secondary cost element and accumulates all the primary cost and secondary cost and send it to the receiving cost center.
PF1
WP1
In PF1, assessment cycles are used to:
- Allocate common production & utilities cost centers to Workshops cost centers (EE32xxxxxx or EE193xxxxx)
The codification of the secondary cost element to be used is: 91xxxxxxxxxx
In WP1 , assessment cycles are used to:
- Allocate common production cost centers (PPPP-2xxx) to Workshops cost centers (PPPP-1xxx)
The codification of the secondary cost element to be used is: 99xxxxxxxx


Maintenance of cycles in SAP
Example
List of cycles
PF1
WP1
-
Page:
-
Page:
-
Page:
-
Page:
-
Page:
In WP1 , assessment cycles are used to a llocate common production cost centers ( PPPP-2xxx ) to Workshops cost centers ( PPPP-1xxx )

COPA Assessment cycle
COPA Assessment cycle assesses costs from a Cost Center to COPA Value Fields.
In PF2, the P&L is built in COPA, cost centers are assessed to a value field in COPA with a secondary cost element 98xxxxxxxx
In WP2, the P&L is built in COPA, cost centers are assessed to a value field in COPA with a secondary cost element 994299xx
Distribution cycle
A distribution cycle is used in SAP to transfer primary costs from a sender cost center to receiving controlling objects. The original cost element remains the same.
In PF1, distribution cycles are used for IAS 19

When you create a cycle to distribute corporate IAS19 costs in PF1, you must follow the following steps:
STEP 1
Create a distribution cycle with KSV1 - Create Actual Distribution Cycle
1. Cycle = CCCCDV
2. Start Date = 01.01.20YY to 31.12.20YY
3. Text = Distribution (IAS19)

STEP 2
Only one segment needs to be created
1. Segment name = EE800IAS19
2. Segment description = IAS 19 BFC Dotation
3. Sender values =
- Sender rule: Posted amounts
- Share in %: 100
- Act. vals
4. Receiver tracing factor
- Receiver rule: Variable portions
- Var.portion type: Actual costs
- Scale Neg. Tracing Factors: No scaling

5. Sender cost center = EE 800IAS19
6. Sender cost elements group = ZSO-P20010
7. Receiver cost centers group = E_CCCC (= all cost centers of the company)

8. Cost Element Group = IASSERV
SAVE ![]()

Distribution cycles are used for:
When you create a cycle to distribute corporate insurance costs in WP1, you must follow the following rules
STEP 1
Create a distribution cycle with KSV1
1. Cycle = CCCCIN
2. Start Date = 01.01.20YY to 31.12.20YY
3. Text = Corporate Insurance Cycle
4. Uncheck "Iterative"

STEP 2
Create 8 segments detailed below

Detail of each segment
1 Segment name | 2 Segment description | 3 Var.portion type | 4 Cost center | 5 Cost element | 6 Cost center | 7 Stat. key fig. |
|---|---|---|---|---|---|---|
98300259 | D&O/EPL Liability | Actual Statistical Key Figures | CCCC-5998 | 98300259 | CCCC | LIAB |
| 98300252 | Property | 98300252 | PROP | |||
| 98300255 | Broker Fees/Comm | 98300255 | BRKR | |||
| 98300256 | Transport | 98300256 | TPT | |||
| 98300253 | Environmental | 98300253 | ENV | |||
| 98300250 | Crime | 98300250 | CRM | |||
| 98300260 | Credit | 98300260 | CRT | |||
| 98300251 | Liability (General and Excess) | 98300251 | LIAB |



When you create a cycle to distribute corporate IAS19 costs in WP1, you must follow the following steps:
STEP 1
Create a distribution cycle with KSV1 - Create Actual Distribution Cycle
1. Cycle = CCCC19
2. Start Date = 01.01.20YY to 31.12.20YY
3. Text = IAS 19 Service Cost Allocation

STEP 2
Only one segment needs to be created
1. Segment name = CCCC-5998
2. Segment description = IAS 19 Service Cost Alloc
3. Sender values =
- Sender rule: Posted amounts
- Share in %: 100
- Act. vals
4. Receiver tracing factor
- Receiver rule: Variable portions
- Var.portion type: Actual costs
- Scale Neg. Tracing Factors: No scaling

5. Sender cost center = CCCC-5998
6. Sender cost elements group = ZSO-P20010
7. Receiver cost centers group = CCCC (= all cost centers of the company)

STEP 3
8. Cost Element = 98320100 (=PS SALARIES)
SAVE ![]()

Costing Operating Procedure
by Frequency
There is no content with the specified labels
There is no content with the specified labels
There is no content with the specified labels
by Scope
There is no content with the specified labels
There is no content with the specified labels
There is no content with the specified labels
by Costing Process
There is no content with the specified labels
There is no content with the specified labels
SAP Roles & Operations
SAP Roles
ZZK-CST-SB
ZS_GRC_IAC_M022
SAP Operations
Error rendering macro 'contentbylabel'
parameters should not be empty
Error rendering macro 'contentbylabel'
parameters should not be empty
Error rendering macro 'contentbylabel'
parameters should not be empty
Costing Rules
There is no content with the specified labels
![]()
The responsibility area is assigned to
Service center RtR
For questions related to Manage Activity Type Price you can contact :
The content of this macro can only be viewed by users who have logged in.
Responsibility Area & Process
TBC
Operating procedures
-
Page:OP.036 — I upload the activity type price
Local procedures
![]()
The responsibility area is assigned to
Service center RtR
For questions related to Manage product costing you can contact :
The content of this macro can only be viewed by users who have logged in.
Responsibility Area & Process



Operating procedures
-
Page:OP.017 —
-
Page:OP.020 —
Error rendering macro 'excerpt-include'
User 'null' does not have permission to view the page.
-
Page:OP.022 — I maintain the material master data
-
Page:OP.028 — I upload the budget information into the system
-
Page:OP.029 — I control the budget & activity uploaded
-
Page:OP.035 — I calculate the standard hourly rate
-
Page:OP.088 — I create an additive cost
-
Page:OP.089 — I update an additive cost
Local procedures
![]()
The responsibility area is assigned to
Service center RtR
For questions related to Perform Costing Monthly Closing you can contact :
The content of this macro can only be viewed by users who have logged in.
Responsibility Area & Process

Operating procedures
Local procedures
Costing Customer

- No labels